CI-v5 EAc1: Electrification 1-5 points

LEEDuser overview

Explore this LEED credit

Post your questions on this credit in the forum, and click on the credit language tab to review to the LEED requirements.

Credit language

USGBC logo

© Copyright U.S. Green Building Council, Inc. All rights reserved.

Intent

To encourage building design that does not depend on burning fuel on-site, which leads to better indoor and outdoor air quality and to low-carbon operations as the grid decarbonizes.

Requirements

Platinum Requirements:
Do not install new on-site combustion equipment in the project scope of work.

 

Option 1. No On-Site Combustion — Base Building and Tenant Systems (5 points)
Design and operate the project from start-up with no on-site combustion except for emergency support systems.

The combined weighted average equipment efficiency for space heating and service water heating (SWH) must be at least 1.8 Coefficient of Performance (COP) for initial build-out construction or at least 1.2 COP for alterations.

The following equipment may be excluded from the COP determination:

  • Space-heating equipment in climate zones 0–2
  • Supplemental heating equipment designed only for operation at low temperatures
  • SWH equipment in nonresidential spaces complying with the point-of-use water heater criteria in ASHRAE 90.1-2022, Section 11.5.2.3.3, W05, without exceptions

OR

Option 2. No On-Site Combustion Except at Low Temperatures—Base Building and Tenant Systems (1–5 points)
Pursue any combination of the following paths for a maximum of 5 points:

PATH 1. SPACE HEATING (2 POINTS)
Design space heating to be capable of operating without on-site combustion except at low temperatures. Projects in climate zones 3 and above must have a weighted average space heating equipment efficiency of at least 1.8 COP for initial build-out construction or at least 1.2 COP for alterations.

The following equipment may be excluded from the COP determination:

  • Supplemental heating equipment designed only for operation at low temperatures

AND/OR

PATH 2. SWH (1 POINT)
Design SWH systems to be capable of operating without on-site combustion except at low temperatures. Projects with total SWH capacity exceeding 34,000 Btu/hr (10 kW) must have a weighted average service hot water equipment efficiency of at least 1.8 COP for initial build-out construction or at least 1.2 COP for alterations.

The following equipment may be excluded from the COP determination:

  • SWH equipment in nonresidential spaces complying with the point-of-use water heater criteria in ASHRAE 90.1-2022, Section 11.5.2.3.3, W05, without exceptions
  • Supplemental heating equipment designed only for operation at low temperatures

AND/OR

PATH 3. COOKING AND OTHER PROCESS LOADS (1–2 POINTS)
Design cooking, laundry, process equipment, and on-site power generation except emergency support systems to be capable of operating without on-site combustion.

Not in scope (1 point)

  • Cooking, laundry, or process heating systems are not in project scope of work.

In scope (2 points)

  • Cooking, laundry, process heating, process drying, and/or on-site power generation are installed within the project scope.

The following equipment may be excluded:

  • Process heating equipment designed for operation at low temperatures

OR

Option 3. No On-Site Combustion, Limited Scope (1–3 points)
For the project scope of work:

  • Do not install on-site combustion equipment in the project scope of work.
  • Combined weighted average equipment efficiency for new space heating and SWH must be at least 1.8 COP for initial build-out construction or at least 1.2 COP for alterations.

The following equipment may be excluded from the COP determination:

  • Space heating equipment in climate zones 0–2
  • Supplemental heating equipment designed only for operation at low temperatures
  • SWH equipment in nonresidential spaces complying with the point-of-use water heater criteria in ASHRAE 90.1-2022, Section 11.5.2.3.3, W05, without exceptions

Points are awarded according to Table 1 based on the minimum project scope of work.

Table 1. Points For No On-Site Combustion, Limited Scope

Minimum project scope of work

Points

One or more cooking, heating, SWH, or process heating systems

1

At least 20% of the project’s peak combined heating and SWH load, or all commercial cooking equipment

2

At least 50% of the project’s peak combined heating and SWH load, or all commercial cooking equipment 

3



OR 

Option 4. Base Building Documentation and Tenant Compliance (5 points)
Points are awarded according to Table 2. Locate in a building that has documented a LEED credit per Table 2.

AND/OR

Meet the following criteria per system type in the project scope of work. The system types are defined as:

  • Space heating
  • SWH
  • Cooking and other process loads

Criteria per system type:

  • Do not install on-site combustion equipment. 

AND

  • Combined weighted average equipment efficiency for space heating system type and SWH system type must be at least 1.8 COP for initial build-out construction or at least 1.2 COP for alterations.

The following equipment may be excluded from the COP determination:

  • Space heating equipment in climate zones 0–2
  • Supplemental heating equipment designed only for operation at low temperatures
  • SWH equipment in nonresidential spaces complying with the point-of-use water heater criteria in ASHRAE 90.1-2022, Section 11.5.2.3.3, W05, without exceptions

Table 2. Points for Achievement of Base Building Performance and Tenant Performance

Base building documentation

Minimum System Types in Project Scope Complying with Criteria

Points Awarded

LEED Rating System(s)

LEED EA Credit Name and Credit Option

Base Building Minimum Threshold

LEED v5 BD+C

EAc1: Electrification

1 point

None

1

2 points

None

2

3 points

At least one, or all systems in scope

3

4 points

At least two, or all systems in scope

4

5 points (NC) 

4 points (CS)

All systems in scope

5

LEED v5 O+M: Existing Buildings

EAc1: GHG Emissions Reduction Performance, Option 1, GHG From On-Site Combustion

1 points

None

1

2 points

None 

2

3 points

At least one, or all systems in scope

3

4 points

At least two, or all systems in scope

4

5 points

All systems in scope

5

 

For all options

Equipment efficiency (for Options 1 and 2)
Determine weighted average COP using either of the following:

  • Equipment efficiencies at rated conditions. For equipment with multiple rated conditions, use the rating closest to 17°F (−9°C) outside air dry-bulb temperatures (OA db), 32°F (0°C) entering liquid temperature, or 44°F (6°C) heating source leaving liquid temperature.
  • Annual average COP calculated with an energy simulation.

District energy
Projects with district energy must comply with the requirements of this credit at the district facility or see additional guidance for interpretation of credit requirements.

Fuel cells
Fuel cells using fossil fuel are ineligible for credit.

Low temperatures
The term  refers to OA db below 20°F (−6.5°C).
 

See all forum discussions about this credit »

Frequently asked questions

No results found
See all forum discussions about this credit »

What does it cost?

Cost estimates for this credit

On each BD+C v4 credit, LEEDuser offers the wisdom of a team of architects, engineers, cost estimators, and LEED experts with hundreds of LEED projects between then. They analyzed the sustainable design strategies associated with each LEED credit, but also to assign actual costs to those strategies.

Our tab contains overall cost guidance, notes on what “soft costs” to expect, and a strategy-by-strategy breakdown of what to consider and what it might cost, in percentage premiums, actual costs, or both.

This information is also available in a full PDF download in The Cost of LEED v4 report.

Learn more about The Cost of LEED v4 »

For full access, sign up now for LEEDuser Premium

Already a premium member? Log in now

Checklists

Step by step to LEED certification

LEEDuser’s checklists walk you through the key action steps you need to earn a credit, including how to avoid common pitfalls and save money.

For full access, sign up now for LEEDuser Premium

Already a premium member? Log in now

Documentation toolkit

The motherlode of cheat sheets

LEEDuser’s Documentation Toolkit is loaded with calculators to help assess credit compliance, tracking spreadsheets for materials, sample templates to help guide your narratives and LEED Online submissions, and examples of actual submissions from certified LEED projects for you to check your work against. To get your plaque, start with the right toolkit.

For full access, sign up now for LEEDuser Premium

Already a premium member? Log in now


Addenda

This credit has no LEEDuser summary

See all forum discussions about this credit »

Credit language

USGBC logo

© Copyright U.S. Green Building Council, Inc. All rights reserved.

Intent

To encourage building design that does not depend on burning fuel on-site, which leads to better indoor and outdoor air quality and to low-carbon operations as the grid decarbonizes.

Requirements

Platinum Requirements:
Do not install new on-site combustion equipment in the project scope of work.

 

Option 1. No On-Site Combustion — Base Building and Tenant Systems (5 points)
Design and operate the project from start-up with no on-site combustion except for emergency support systems.

The combined weighted average equipment efficiency for space heating and service water heating (SWH) must be at least 1.8 Coefficient of Performance (COP) for initial build-out construction or at least 1.2 COP for alterations.

The following equipment may be excluded from the COP determination:

  • Space-heating equipment in climate zones 0–2
  • Supplemental heating equipment designed only for operation at low temperatures
  • SWH equipment in nonresidential spaces complying with the point-of-use water heater criteria in ASHRAE 90.1-2022, Section 11.5.2.3.3, W05, without exceptions

OR

Option 2. No On-Site Combustion Except at Low Temperatures—Base Building and Tenant Systems (1–5 points)
Pursue any combination of the following paths for a maximum of 5 points:

PATH 1. SPACE HEATING (2 POINTS)
Design space heating to be capable of operating without on-site combustion except at low temperatures. Projects in climate zones 3 and above must have a weighted average space heating equipment efficiency of at least 1.8 COP for initial build-out construction or at least 1.2 COP for alterations.

The following equipment may be excluded from the COP determination:

  • Supplemental heating equipment designed only for operation at low temperatures

AND/OR

PATH 2. SWH (1 POINT)
Design SWH systems to be capable of operating without on-site combustion except at low temperatures. Projects with total SWH capacity exceeding 34,000 Btu/hr (10 kW) must have a weighted average service hot water equipment efficiency of at least 1.8 COP for initial build-out construction or at least 1.2 COP for alterations.

The following equipment may be excluded from the COP determination:

  • SWH equipment in nonresidential spaces complying with the point-of-use water heater criteria in ASHRAE 90.1-2022, Section 11.5.2.3.3, W05, without exceptions
  • Supplemental heating equipment designed only for operation at low temperatures

AND/OR

PATH 3. COOKING AND OTHER PROCESS LOADS (1–2 POINTS)
Design cooking, laundry, process equipment, and on-site power generation except emergency support systems to be capable of operating without on-site combustion.

Not in scope (1 point)

  • Cooking, laundry, or process heating systems are not in project scope of work.

In scope (2 points)

  • Cooking, laundry, process heating, process drying, and/or on-site power generation are installed within the project scope.

The following equipment may be excluded:

  • Process heating equipment designed for operation at low temperatures

OR

Option 3. No On-Site Combustion, Limited Scope (1–3 points)
For the project scope of work:

  • Do not install on-site combustion equipment in the project scope of work.
  • Combined weighted average equipment efficiency for new space heating and SWH must be at least 1.8 COP for initial build-out construction or at least 1.2 COP for alterations.

The following equipment may be excluded from the COP determination:

  • Space heating equipment in climate zones 0–2
  • Supplemental heating equipment designed only for operation at low temperatures
  • SWH equipment in nonresidential spaces complying with the point-of-use water heater criteria in ASHRAE 90.1-2022, Section 11.5.2.3.3, W05, without exceptions

Points are awarded according to Table 1 based on the minimum project scope of work.

Table 1. Points For No On-Site Combustion, Limited Scope

Minimum project scope of work

Points

One or more cooking, heating, SWH, or process heating systems

1

At least 20% of the project’s peak combined heating and SWH load, or all commercial cooking equipment

2

At least 50% of the project’s peak combined heating and SWH load, or all commercial cooking equipment 

3



OR 

Option 4. Base Building Documentation and Tenant Compliance (5 points)
Points are awarded according to Table 2. Locate in a building that has documented a LEED credit per Table 2.

AND/OR

Meet the following criteria per system type in the project scope of work. The system types are defined as:

  • Space heating
  • SWH
  • Cooking and other process loads

Criteria per system type:

  • Do not install on-site combustion equipment. 

AND

  • Combined weighted average equipment efficiency for space heating system type and SWH system type must be at least 1.8 COP for initial build-out construction or at least 1.2 COP for alterations.

The following equipment may be excluded from the COP determination:

  • Space heating equipment in climate zones 0–2
  • Supplemental heating equipment designed only for operation at low temperatures
  • SWH equipment in nonresidential spaces complying with the point-of-use water heater criteria in ASHRAE 90.1-2022, Section 11.5.2.3.3, W05, without exceptions

Table 2. Points for Achievement of Base Building Performance and Tenant Performance

Base building documentation

Minimum System Types in Project Scope Complying with Criteria

Points Awarded

LEED Rating System(s)

LEED EA Credit Name and Credit Option

Base Building Minimum Threshold

LEED v5 BD+C

EAc1: Electrification

1 point

None

1

2 points

None

2

3 points

At least one, or all systems in scope

3

4 points

At least two, or all systems in scope

4

5 points (NC) 

4 points (CS)

All systems in scope

5

LEED v5 O+M: Existing Buildings

EAc1: GHG Emissions Reduction Performance, Option 1, GHG From On-Site Combustion

1 points

None

1

2 points

None 

2

3 points

At least one, or all systems in scope

3

4 points

At least two, or all systems in scope

4

5 points

All systems in scope

5

 

For all options

Equipment efficiency (for Options 1 and 2)
Determine weighted average COP using either of the following:

  • Equipment efficiencies at rated conditions. For equipment with multiple rated conditions, use the rating closest to 17°F (−9°C) outside air dry-bulb temperatures (OA db), 32°F (0°C) entering liquid temperature, or 44°F (6°C) heating source leaving liquid temperature.
  • Annual average COP calculated with an energy simulation.

District energy
Projects with district energy must comply with the requirements of this credit at the district facility or see additional guidance for interpretation of credit requirements.

Fuel cells
Fuel cells using fossil fuel are ineligible for credit.

Low temperatures
The term  refers to OA db below 20°F (−6.5°C).
 