Post a question or comment
Filter by location
Forum
Topic
Replies
Recent

MRpc87 pursuit

Pilot-Credits MRpc87:Verified Construction & Demolition Recycling Rates
posted by  Kristin Rivera  on 

I've run into many instances where I was less than confident in the validity of recycling data from haulers.

2
Senior Consultant
Greenwood Consulting Group
LEEDuser Premium Member
4 thumbs up
Fri Dec 12, 2025, 10:36 pm

Natural Gas as process loads

NC-v4 EAp2:Minimum energy performance
posted by  A&L SUSTENTABILIDADE   on 

Dear forum users,

We are modeling a manufacturing building that uses natural gas in its welding processes.

Should the natural gas consumption be included in the energy simulation?

0

Simplified Approach Option for HVAC Systems (ASHRAE 90.1-2016 Section 6.3) – EA Prerequisite (LEED v4.1 ID+C)

LEED v4.1 Discussion Forum
posted by  Pongpitch J.  on 

I would like to confirm whether the Simplified Approach Option for HVAC Systems (ASHRAE 90.1-2016 Section 6.3) is acceptable for demonstrating compliance with EA Prerequisi

0

Metering heat pumps with shared ATES system

NC-v4 EAc3:Advanced energy metering
posted by  Yara Ibrahim  on 

All heating/cooling in our building  project is supplied by a heat pump, fed from an ATES system that is shared with other buildings on the property.

1
LEED Fellow
7group / Energy Opportunities
LEEDuser Expert
4454 thumbs up
Thu Dec 11, 2025, 9:27 pm

Overall Feedback on Pilot Credit

Pilot-Credits MRpc87:Verified Construction & Demolition Recycling Rates
posted by  Kavita Karmarkar  on 

As our project is located in Northern CA, it is not diffidult to achieve this credit as there are many haulers with third-party certified diversion rates (RCI) in the area.

5
Default Avatar
Greenwood Consulting Group
LEEDuser Premium Member
0 thumbs up
Wed Dec 10, 2025, 11:55 pm

Combination option?

NC-v4.1 LTc8:Electric Vehicles
posted by  Joseph Snider  on 

Has anybody seen an option to install some EVs and then some EV ready to combine Option 1 and 2?  In 2009, there was a way to run weighted calcualtions.  We have a project doing a little

8
Energy Engineer
ads ENGINEERS, DPC
LEEDuser Basic Member
21 thumbs up
Wed Dec 10, 2025, 9:38 pm

Construction Waste Tracking Source Separated Question for Concrete and Asphalt Crushed for Aggregate

NC-v4 MRc5:Construction and demolition waste management
posted by  Summer Gorder  on 

I have been a Sustainability/ LEED Consultant in Portland, OR, since starting my business in 2009, and recently am going back to school so to speak about Construction Waste Tracking due to a Muultn

0

Multi-component recycled content reporting

NC-v4.1 MRc3:Sourcing of Raw Materials
posted by  Lawrence Rennell  on 

I have a product which comprises 92% stainless steel and 8% core material. The recycled content of the stainless steel is: 76% post-consumer and 15% pre-consumer.

2
Default Avatar
Director, LEED
US Green Building Council
LEEDuser Premium Member
9 thumbs up
Tue Dec 9, 2025, 11:52 pm