Intent

To design buildings that minimize energy use to reduce the environmental damage caused by resource extraction, air pollution, and GHG emissions, and to facilitate the transition to a clean energy future. 

Requirements

Platinum Requirements:
Seven points are required.

 

Option 1. Prescriptive Path (1–12 points)
PATH 1. ASHRAE 90.1-2022 COMPLIANCE FOR PROJECT SCOPE (3 POINTS)
Comply with the provisions of ASHRAE 90.1-2022, Sections 5–11, for the project scope of work.

AND/OR

PATH 2. REGULATED LOADS (1–4 POINTS) 
Apply Case 1 or Case 2, up to a maximum of 4 points:

Case 1. Additional Efficiency — Systems Optimization (1–4 points)
Points are awarded according to Table 1. For projects complying with Path 1, reference ASHRAE 90.1-2022 or approved equivalent standard. For other projects registered prior to January 1, 2028, reference ASHRAE 90.1-2019 or approved equivalent standard.

Table 1. Systems optimization

 

Threshold

Points

Lighting power. Reduce connected lighting power, including existing fixtures below the lighting power allowance by the specified percentage.

15%

1

30%

2

Cooling, heating, and SWH efficiency. Demonstrate the specified percent improvement in prescriptive efficiencies for at least 75% of the combined cooling, heating, and SWH capacity installed or replaced in the project scope of work.

15%

1

Fan power. Demonstrate the specified percent improvement in fan power below the prescriptive fan power limitation for systems altered or replaced in the project scope of work.

20%

1

 

OR

Case 2. Additional Efficiency Requirements Beyond ASHRAE 90.1-2022 (1–4 points)
Applicable only to projects complying with ASHRAE 90.1-2022, Sections 5–11, that are also defined as “substantial alterations to existing buildings” per ASHRAE 90.1, Section 11.1.4. Points are awarded according to Table 2.

Document achievement of incremental ASHRAE 90.1-2022, Section 11, energy credits above the minimum required by ASHRAE 90.1-2022, Section 11, from the following list of eligible measures:

Eligible measures from ASHRAE 90.1, Section 11.5.2, for LEED points

  • HVAC measures (H01 to H07)
  • SWH measures (W01 to W09)
  • Lighting measures (L01 to L06)
  • G07 Building Mass/Night Flush

Table 2. Points for ASHRAE 90.1-2022, Section 11 Credits

ASHRAE 90.1-2022, Section 11 Credits

Points

Minimum required by 90.1-2022 plus 13 credits

1

Minimum required by 90.1-2022 plus 25 credits

2

Minimum required by 90.1-2022 plus 38 credits

3

Minimum required by 90.1-2022 plus 50 credits

4

 

AND/OR

PATH 3. PLUG AND PROCESS LOADS (1–5 POINTS)
Case 1. Plug Load Management (1 point)
Implement the following:

  • Provide a plug load dashboard that is accessible through an application to all regular occupants of the space.
  • For tenant types with IT departments, implement policies for PCs, monitors, and visual displays to be controlled off when not in use, except for scheduled maintenance periods.

AND/OR

Case 2. Efficient Plug and Process Load Equipment (1–5 points)
Implement one or more of the following:

  • Install or reuse eligible plug and process equipment meeting the criteria in Table 3 for 90% of applicable equipment by quantity or rated load. Either include or exclude all eligible equipment reused in the project from the calculations. For one Table 3 equipment category (1 point)
  • For two Table 3 equipment categories (2 points)
  • For three or more Table 3 equipment categories (3 points)

OR

For process-intensive spaces, install or reuse eligible plug and process equipment meeting the criteria in Table 3 for at least 90% of total applicable equipment rated load. Rated load of compliant equipment must total at least:

  • 0.3 W/sq. ft. (3.2 W/sq. m.) (3 points)
  • 0.5 W/sq. ft. (5.4 W/sq. m.) (4 points)
  • 1.0 W/sq. ft. (10.8 W/sq. m.) (5 points)

Table 3. Plug, Process, Refrigeration, and Conveyance Equipment Criteria

Equipment Category

Applicable Equipment

Criteria

ENERGY STAR products: plug loads and small appliances

Office equipment
Appliances
Electronics
Other
(e.g., vending machines, pool pumps, water coolers)

ENERGY STAR rated or approved equivalent with at least 0.1 W/sq. ft. (1.1 W/sq. m.) of total rated load

ENERGY STAR products: process loads

Commercial food service equipment
Data center/server equipment
Commercial laundry equipment
EVSE
Other (e.g., laboratory-grade refrigerators and freezers)

ENERGY STAR rated or approved equivalent with at least 0.1 W/sq. ft. (1.1 W/sq. m.) of total rated load

People conveyance

Elevators
Escalators
Moving walkways

ISO 25745
At least Class A-rated
 

Data center electrical system

Electrical system design

ASHRAE 90.4-2022
Design electrical loss component (ELC) is at least 20% lower than the maximum design electrical loss

Refrigeration systems 

Referenced in ASHRAE 90.1, Section 6.8, tables AND not ENERGY STAR eligible

10% improvement beyond ASHRAE 90.1, Section 6.8, tables

Refrigerated warehouse

California Title 24-2022, Section 120.6, refrigerated warehouse requirements

Airport equipment

Baggage handling equipment

Individual carrier systems (ICS) with variable frequency drive

Aircraft and jetway air-conditioning 

Preconditioned air (PCA) systems with efficiencies meeting ASHRAE 90.1 prescriptive efficiencies for HVAC equipment

 

OR

Case 3. Plug and Process Load Exceptional Calculation (1–5 points)
Using the ASHRAE 90.1, Section G2.5, exceptional calculation method, demonstrate a minimum percentage improvement in total project plug and process, refrigeration, and conveyance loads. Points are awarded according to Table 4.  

Table 4. Points for Percent Improvement in Plug and Process Loads

Improvement (%)

Points

8%

1

16%

2

24%

3

32%

4

40%

5

AND/OR

PATH 4. BASE BUILDING ENERGY EFFICIENCY (2 POINTS)
Locate in a base building that complies with one of the following:

  • ASHRAE 90.1-2022
  • Current ENERGY STAR score of at least 75 
  • LEED base building documentation of energy efficiency per Table 5

Table 5. LEED Base Building Documentation of Energy Efficiency

Interior Fit-out Classification

LEED Base Building Documentation of Energy Efficiency

Rating System(s)

EA credit name and credit option

Base building minimum threshold

Initial build-out

LEED v5 BD+C 

 

EAc3: Enhanced Energy Efficiency

5 points

Alterations of previously occupied space

LEED v5 O+M 

 

EAc2: Optimized Energy Performance

5 points

Initial build-out

LEED v4 or LEED v4.1 BD+C

EAc2: Optimized Energy Performance

8 points

 

OR

Option 2. Energy Simulation (1–12 points)
Demonstrate an improvement in future source energy calculated per ASHRAE Standard 90.1, Normative Appendix G, “Performance Rating Method,” with the following additional provisions:

  • Use the ASHRAE 90.1 version applied for EAp2: Minimum Energy Efficiency.
  • Replace ASHRAE 90.1-2019 or 90.1-2022, Table 4.2.1.1, Building Performance Factors (BPFs), with Table 7 below. For alterations except initial build-out construction, the following ASHRAE 90.1-2022 adjustments may be applied:
    • Substantial alteration. Multiply the BPF by 1.05 if the alteration is defined as a substantial alteration in ASHRAE 90.1-2022, Section G3.1.4(a).
    • Other alterations. Apply ASHRAE 90.1-2022, Section G3.3 (“Performance Calculations for Other Alterations”). For projects documented using ASHRAE 90.1-2019, Appendix G, replace all references to 90.1-2022, Section 5–10, prescriptive criteria with the corresponding 90.1-2019, Section 5–10 criteria.
  • Replace all references to “cost” with “future source energy.” Use an electric site-to-source energy conversion factor of 2.0 based on future projections for the U.S. A lower national average value may be used as applicable for projects outside of the U.S.
  • Model energy efficiency measures for plug and process loads using Section G2.5, “Exceptional Calculation Method,” or approved calculations in the LEED reference guidance. Calculate the PI and percentage improvement with and without the plug and process savings.
  • Calculate the PI and performance index target (PIt) as follows:
    • PInre = PBPnre / BBP
    • PI = PBP / BBP
    • PIt = [BBUE + (BPF x BBRE)] / BBP
      where:
      • PInre = PI for future source energy excluding on-site renewable contribution 
      • PI = PI for future source energy including on-site renewable contribution
      • PIt = performance index target for future source energy use
      • BBP = baseline building performance for baseline building future source energy use
      • BBUE = baseline building unregulated future source energy use
      • BBRE = baseline building regulated future source energy use
      • PBPnre = proposed building performance without any credit for reduced annual future source energy from on-site renewable energy generation systems  
      • PBP = proposed building performance, including the reduced annual future source energy associated with all on-site renewable energy generation systems

Points are awarded according to Table 6, using either Path 1 or Path 2.

Table 6. Points for Percentage Improvement in PI Below PIt

Path 1. Percentage

Reduction Excluding

On-Site Renewable

Contribution (100%–PInre/PIt)

OR

Path 2. Percentage Reduction Excluding On-Site Renewable Contribution (100%–PI/PIt)

Points

0%

 

5%

2

2%

10%

3

4%

20%

4

6%

30%

5

8%

40%

6

10%

50%

7

12%

60%

8

14%

70%

9

16%

80%

10

18%

90%

11

20%

100%

12

 

Table 7. ASHRAE 90.1-2019—Equivalent BPFs for a Future Source Energy Metric

Building type

 

Climate zone

0A

0B

1A

1B

2A

2B

3A

3B

3C

4A

4B

4C

5A

5B

5C

6A

6B

7

8

Multifamily

0.74

0.69

0.73

0.70

0.73

0.70

0.71

0.70

0.63

0.70

0.71

0.69

0.68

0.70

0.70

0.68

0.68

0.68

0.74

Healthcare/hospital

0.72

0.72

0.73

0.73

0.74

0.71

0.72

0.74

0.71

0.72

0.73

0.71

0.74

0.73

0.80

0.73

0.77

0.78

0.79

Hotel/motel

0.72

0.71

0.72

0.71

0.71

0.70

0.71

0.73

0.72

0.71

0.73

0.73

0.71

0.73

0.74

0.70

0.72

0.70

0.70

Office

0.62

0.63

0.61

0.62

0.58

0.60

0.57

0.62

0.55

0.55

0.61

0.57

0.58

0.61

0.59

0.58

0.60

0.54

0.58

Restaurant

0.65

0.62

0.63

0.61

0.62

0.58

0.63

0.63

0.63

0.67

0.66

0.66

0.70

0.70

0.68

0.73

0.72

0.74

0.77

Retail

0.57

0.54

0.53

0.53

0.48

0.47

0.47

0.47

0.47

0.52

0.50

0.56

0.57

0.53

0.59

0.58

0.56

0.53

0.60

School

0.57

0.57

0.58

0.57

0.55

0.54

0.57

0.51

0.49

0.48

0.51

0.52

0.51

0.53

0.51

0.53

0.50

0.51

0.58

Warehouse

0.28

0.30

0.24

0.27

0.23

0.24

0.27

0.23

0.20

0.33

0.26

0.28

0.40

0.32

0.29

0.44

0.38

0.40

0.44

All others

0.65

0.62

0.64

0.62

0.57

0.54

0.57

0.56

0.58

0.59

0.57

0.60

0.60

0.59

0.65

0.62

0.62

0.61

0.64

 

 

 

See all forum discussions about this credit »

Frequently asked questions

No results found
See all forum discussions about this credit »

What does it cost?

Cost estimates for this credit

On each BD+C v4 credit, LEEDuser offers the wisdom of a team of architects, engineers, cost estimators, and LEED experts with hundreds of LEED projects between then. They analyzed the sustainable design strategies associated with each LEED credit, but also to assign actual costs to those strategies.

Our tab contains overall cost guidance, notes on what “soft costs” to expect, and a strategy-by-strategy breakdown of what to consider and what it might cost, in percentage premiums, actual costs, or both.

This information is also available in a full PDF download in The Cost of LEED v4 report.

Learn more about The Cost of LEED v4 »

For full access, sign up now for LEEDuser Premium

Already a premium member? Log in now

Checklists

Step by step to LEED certification

LEEDuser’s checklists walk you through the key action steps you need to earn a credit, including how to avoid common pitfalls and save money.

For full access, sign up now for LEEDuser Premium

Already a premium member? Log in now

Documentation toolkit

The motherlode of cheat sheets

LEEDuser’s Documentation Toolkit is loaded with calculators to help assess credit compliance, tracking spreadsheets for materials, sample templates to help guide your narratives and LEED Online submissions, and examples of actual submissions from certified LEED projects for you to check your work against. To get your plaque, start with the right toolkit.

For full access, sign up now for LEEDuser Premium

Already a premium member? Log in now


Addenda

This credit has no LEEDuser summary

See all forum discussions about this credit »

Credit language

USGBC logo

© Copyright U.S. Green Building Council, Inc. All rights reserved.

Intent

To design buildings that minimize energy use to reduce the environmental damage caused by resource extraction, air pollution, and GHG emissions, and to facilitate the transition to a clean energy future. 

Requirements

Platinum Requirements:
Seven points are required.

 

Option 1. Prescriptive Path (1–12 points)
PATH 1. ASHRAE 90.1-2022 COMPLIANCE FOR PROJECT SCOPE (3 POINTS)
Comply with the provisions of ASHRAE 90.1-2022, Sections 5–11, for the project scope of work.

AND/OR

PATH 2. REGULATED LOADS (1–4 POINTS) 
Apply Case 1 or Case 2, up to a maximum of 4 points:

Case 1. Additional Efficiency — Systems Optimization (1–4 points)
Points are awarded according to Table 1. For projects complying with Path 1, reference ASHRAE 90.1-2022 or approved equivalent standard. For other projects registered prior to January 1, 2028, reference ASHRAE 90.1-2019 or approved equivalent standard.

Table 1. Systems optimization

 

Threshold

Points

Lighting power. Reduce connected lighting power, including existing fixtures below the lighting power allowance by the specified percentage.

15%

1

30%

2

Cooling, heating, and SWH efficiency. Demonstrate the specified percent improvement in prescriptive efficiencies for at least 75% of the combined cooling, heating, and SWH capacity installed or replaced in the project scope of work.

15%

1

Fan power. Demonstrate the specified percent improvement in fan power below the prescriptive fan power limitation for systems altered or replaced in the project scope of work.

20%

1

 

OR

Case 2. Additional Efficiency Requirements Beyond ASHRAE 90.1-2022 (1–4 points)
Applicable only to projects complying with ASHRAE 90.1-2022, Sections 5–11, that are also defined as “substantial alterations to existing buildings” per ASHRAE 90.1, Section 11.1.4. Points are awarded according to Table 2.

Document achievement of incremental ASHRAE 90.1-2022, Section 11, energy credits above the minimum required by ASHRAE 90.1-2022, Section 11, from the following list of eligible measures:

Eligible measures from ASHRAE 90.1, Section 11.5.2, for LEED points

  • HVAC measures (H01 to H07)
  • SWH measures (W01 to W09)
  • Lighting measures (L01 to L06)
  • G07 Building Mass/Night Flush

Table 2. Points for ASHRAE 90.1-2022, Section 11 Credits

ASHRAE 90.1-2022, Section 11 Credits

Points

Minimum required by 90.1-2022 plus 13 credits

1

Minimum required by 90.1-2022 plus 25 credits

2

Minimum required by 90.1-2022 plus 38 credits

3

Minimum required by 90.1-2022 plus 50 credits

4

 

AND/OR

PATH 3. PLUG AND PROCESS LOADS (1–5 POINTS)
Case 1. Plug Load Management (1 point)
Implement the following:

  • Provide a plug load dashboard that is accessible through an application to all regular occupants of the space.
  • For tenant types with IT departments, implement policies for PCs, monitors, and visual displays to be controlled off when not in use, except for scheduled maintenance periods.

AND/OR

Case 2. Efficient Plug and Process Load Equipment (1–5 points)
Implement one or more of the following:

  • Install or reuse eligible plug and process equipment meeting the criteria in Table 3 for 90% of applicable equipment by quantity or rated load. Either include or exclude all eligible equipment reused in the project from the calculations. For one Table 3 equipment category (1 point)
  • For two Table 3 equipment categories (2 points)
  • For three or more Table 3 equipment categories (3 points)

OR

For process-intensive spaces, install or reuse eligible plug and process equipment meeting the criteria in Table 3 for at least 90% of total applicable equipment rated load. Rated load of compliant equipment must total at least:

  • 0.3 W/sq. ft. (3.2 W/sq. m.) (3 points)
  • 0.5 W/sq. ft. (5.4 W/sq. m.) (4 points)
  • 1.0 W/sq. ft. (10.8 W/sq. m.) (5 points)

Table 3. Plug, Process, Refrigeration, and Conveyance Equipment Criteria

Equipment Category

Applicable Equipment

Criteria

ENERGY STAR products: plug loads and small appliances

Office equipment
Appliances
Electronics
Other
(e.g., vending machines, pool pumps, water coolers)

ENERGY STAR rated or approved equivalent with at least 0.1 W/sq. ft. (1.1 W/sq. m.) of total rated load

ENERGY STAR products: process loads

Commercial food service equipment
Data center/server equipment
Commercial laundry equipment
EVSE
Other (e.g., laboratory-grade refrigerators and freezers)

ENERGY STAR rated or approved equivalent with at least 0.1 W/sq. ft. (1.1 W/sq. m.) of total rated load

People conveyance

Elevators
Escalators
Moving walkways

ISO 25745
At least Class A-rated
 

Data center electrical system

Electrical system design

ASHRAE 90.4-2022
Design electrical loss component (ELC) is at least 20% lower than the maximum design electrical loss

Refrigeration systems 

Referenced in ASHRAE 90.1, Section 6.8, tables AND not ENERGY STAR eligible

10% improvement beyond ASHRAE 90.1, Section 6.8, tables

Refrigerated warehouse

California Title 24-2022, Section 120.6, refrigerated warehouse requirements

Airport equipment

Baggage handling equipment

Individual carrier systems (ICS) with variable frequency drive

Aircraft and jetway air-conditioning 

Preconditioned air (PCA) systems with efficiencies meeting ASHRAE 90.1 prescriptive efficiencies for HVAC equipment

 

OR

Case 3. Plug and Process Load Exceptional Calculation (1–5 points)
Using the ASHRAE 90.1, Section G2.5, exceptional calculation method, demonstrate a minimum percentage improvement in total project plug and process, refrigeration, and conveyance loads. Points are awarded according to Table 4.  

Table 4. Points for Percent Improvement in Plug and Process Loads

Improvement (%)

Points

8%

1

16%

2

24%

3

32%

4

40%

5

AND/OR

PATH 4. BASE BUILDING ENERGY EFFICIENCY (2 POINTS)
Locate in a base building that complies with one of the following:

  • ASHRAE 90.1-2022
  • Current ENERGY STAR score of at least 75 
  • LEED base building documentation of energy efficiency per Table 5

Table 5. LEED Base Building Documentation of Energy Efficiency

Interior Fit-out Classification

LEED Base Building Documentation of Energy Efficiency

Rating System(s)

EA credit name and credit option

Base building minimum threshold

Initial build-out

LEED v5 BD+C 

 

EAc3: Enhanced Energy Efficiency

5 points

Alterations of previously occupied space

LEED v5 O+M 

 

EAc2: Optimized Energy Performance

5 points

Initial build-out

LEED v4 or LEED v4.1 BD+C

EAc2: Optimized Energy Performance

8 points

 

OR

Option 2. Energy Simulation (1–12 points)
Demonstrate an improvement in future source energy calculated per ASHRAE Standard 90.1, Normative Appendix G, “Performance Rating Method,” with the following additional provisions:

  • Use the ASHRAE 90.1 version applied for EAp2: Minimum Energy Efficiency.
  • Replace ASHRAE 90.1-2019 or 90.1-2022, Table 4.2.1.1, Building Performance Factors (BPFs), with Table 7 below. For alterations except initial build-out construction, the following ASHRAE 90.1-2022 adjustments may be applied:
    • Substantial alteration. Multiply the BPF by 1.05 if the alteration is defined as a substantial alteration in ASHRAE 90.1-2022, Section G3.1.4(a).
    • Other alterations. Apply ASHRAE 90.1-2022, Section G3.3 (“Performance Calculations for Other Alterations”). For projects documented using ASHRAE 90.1-2019, Appendix G, replace all references to 90.1-2022, Section 5–10, prescriptive criteria with the corresponding 90.1-2019, Section 5–10 criteria.
  • Replace all references to “cost” with “future source energy.” Use an electric site-to-source energy conversion factor of 2.0 based on future projections for the U.S. A lower national average value may be used as applicable for projects outside of the U.S.
  • Model energy efficiency measures for plug and process loads using Section G2.5, “Exceptional Calculation Method,” or approved calculations in the LEED reference guidance. Calculate the PI and percentage improvement with and without the plug and process savings.
  • Calculate the PI and performance index target (PIt) as follows:
    • PInre = PBPnre / BBP
    • PI = PBP / BBP
    • PIt = [BBUE + (BPF x BBRE)] / BBP
      where:
      • PInre = PI for future source energy excluding on-site renewable contribution 
      • PI = PI for future source energy including on-site renewable contribution
      • PIt = performance index target for future source energy use
      • BBP = baseline building performance for baseline building future source energy use
      • BBUE = baseline building unregulated future source energy use
      • BBRE = baseline building regulated future source energy use
      • PBPnre = proposed building performance without any credit for reduced annual future source energy from on-site renewable energy generation systems  
      • PBP = proposed building performance, including the reduced annual future source energy associated with all on-site renewable energy generation systems

Points are awarded according to Table 6, using either Path 1 or Path 2.

Table 6. Points for Percentage Improvement in PI Below PIt

Path 1. Percentage

Reduction Excluding

On-Site Renewable

Contribution (100%–PInre/PIt)

OR

Path 2. Percentage Reduction Excluding On-Site Renewable Contribution (100%–PI/PIt)

Points

0%

 

5%

2

2%

10%

3

4%

20%

4

6%

30%

5

8%

40%

6

10%

50%

7

12%

60%

8

14%

70%

9

16%

80%

10

18%

90%

11

20%

100%

12

 

Table 7. ASHRAE 90.1-2019—Equivalent BPFs for a Future Source Energy Metric

Building type

 

Climate zone

0A

0B

1A

1B

2A

2B

3A

3B

3C

4A

4B

4C

5A

5B

5C

6A

6B

7

8

Multifamily

0.74

0.69

0.73

0.70

0.73

0.70

0.71

0.70

0.63

0.70

0.71

0.69

0.68

0.70

0.70

0.68

0.68

0.68

0.74

Healthcare/hospital

0.72

0.72

0.73

0.73

0.74

0.71

0.72

0.74

0.71

0.72

0.73

0.71

0.74

0.73

0.80

0.73

0.77

0.78

0.79

Hotel/motel

0.72

0.71

0.72

0.71

0.71

0.70

0.71

0.73

0.72

0.71

0.73

0.73

0.71

0.73

0.74

0.70

0.72

0.70

0.70

Office

0.62

0.63

0.61

0.62

0.58

0.60

0.57

0.62

0.55

0.55

0.61

0.57

0.58

0.61

0.59

0.58

0.60

0.54

0.58

Restaurant

0.65

0.62

0.63

0.61

0.62

0.58

0.63

0.63

0.63

0.67

0.66

0.66

0.70

0.70

0.68

0.73

0.72

0.74

0.77

Retail

0.57

0.54

0.53

0.53

0.48

0.47

0.47

0.47

0.47

0.52

0.50

0.56

0.57

0.53

0.59

0.58

0.56

0.53

0.60

School

0.57

0.57

0.58

0.57

0.55

0.54

0.57

0.51

0.49

0.48

0.51

0.52

0.51

0.53

0.51

0.53

0.50

0.51

0.58

Warehouse

0.28

0.30

0.24

0.27

0.23

0.24

0.27

0.23

0.20

0.33

0.26

0.28

0.40

0.32

0.29

0.44

0.38

0.40

0.44

All others

0.65

0.62

0.64

0.62

0.57

0.54

0.57

0.56

0.58

0.59

0.57

0.60

0.60

0.59

0.65

0.62

0.62

0.61

0.64

 

 

 

See all forum discussions about this credit »