Intent
To design buildings that minimize energy use to reduce the environmental damage caused by resource extraction, air pollution, and greenhouse gas emissions and to facilitate the transition to a clean energy future.
Requirements
Platinum Requirements:
Five points are required.
Option 1. Prescriptive Path (1–7 points)
Pursue Path 1 and/or Path 2 for a maximum of 7 points.
PATH 1. REGULATED LOADS (1–6 POINTS)
Points are awarded according to Table 1, using either Case 1 or Case 2.
Case 1. ASHRAE 90.1-2019 (1–5 points)
Available only to projects registered before January 1, 2028.
- Comply with the provisions of ASHRAE 90.1-2019, Sections 5–10.
- Implement Additional Efficiency Requirements credits calculated per ASHRAE 90.1-2022, Section 11, from the list of eligible measures referenced below. Where ASHRAE 90.1-2022, Section 11, references the prescriptive requirements of ASHRAE 90.1-2022, Sections 5–10, such as lighting power density or equipment efficiency, replace with the matching prescriptive values in ASHRAE 90.1-2019.
- Central systems. Earn 1 point for every 13 energy credits where the LEED BD+C: Core and Shell project includes a central HVAC system or service water heating system that includes chillers, boilers, service water heating equipment, or loop pumping systems with heat rejection.
- All others. Earn 1 point for every nine energy credits for all other LEED BD+C: Core and Shell projects.
OR
Case 2. ASHRAE 90.1-2022 (2–6 points)
- Comply with the provisions of ASHRAE 90.1-2022, Sections 5–11.
- Implement incremental ASHRAE 90.1 2022, Section 11 credits above the minimum required from the list of eligible measures below.
- Central systems: 1 point for every 13 incremental energy credits where the LEED BD+C: Core and Shell project includes a central HVAC system or service water heating system that includes chillers, boilers, service water heating equipment, or loop pumping systems with heat rejection.
- All others: 1 point for every nine incremental energy credits for all other LEED BD+C: Core and Shell projects.
Eligible measures from ASHRAE 90.1-2022, Section 11.5.2, for LEED points
- HVAC measures (H01 to H07)
- Service water heating measures (W01 to W09)
- Lighting measures (L01 to L06)
- G07 building mass/night flush
Table 1. Points for ASHRAE 90.1-2022, Section 11 Credits
Points | Compliance Path | |||
Case 1. ASHRAE 90.1-2019 | Case 2. ASHRAE 90.1-2022 | |||
Central Systems | All Others | Central Systems | All Others | |
1 | 13 credits | 9 credits | N/A | N/A |
2 | 26 credits | 18 credits | Min. required by ASHRAE 90.1-2022 | Min. required by ASHRAE 90.1-2022 |
3 | 39 credits | 27 credits | Min. required + 13 credits | Min. required + 9 credits |
4 | 52 credits | 36 credits | Min. required + 26 credits | Min. required + 18 credits |
5 | 65 credits | 45 credits | Min. required + 39 credits | Min. required + 27 credits |
6 | – | – | Min. required + 52 credits | Min. required + 36 credits |
AND/OR
PATH 2. PLUG AND PROCESS LOADS (1–3 POINTS)
Case 1. Plug Load Management (1 point)
Implement the following:
- Provide to all regular occupants of the building a plug load dashboard accessed through an application that displays base building plug loads and allows tenants to choose whether to display plug loads to their occupants.
- Configure the plug load monitoring system with the capability to expand to monitor future plug loads for each floor and for individual tenant spaces.
AND/OR
Case 2. Efficient Plug and Process Load Equipment (1–3 points)
Install or reuse equipment meeting the criteria in Table 2. Points are awarded according to Table 2 up to a maximum of 3 points for each equipment category where the criteria are met.
Table 2. Plug, Process, Refrigeration, and Conveyance Equipment Criteria
Equipment Category | Applicable Equipment | Criteria | Points |
People conveyance | Elevators Escalators Moving walkways | ISO 25745. At least Class A-rated | 2 |
Data center electrical system | Electrical system design | ASHRAE 90.4-2022. Design electrical loss component is at least 20% lower than the maximum design electrical loss. | 1 |
Refrigeration systems | Referenced in ASHRAE 90.1, Section 6.8 tables, AND not ENERGY STAR® eligible | 10% improvement beyond ASHRAE 90.1, Section 6.8 tables | 1 |
Refrigerated warehouse | California Title 24-2022, Section 120.6, refrigerated warehouse requirements | ||
Airport equipment | Baggage handling equipment | Individual carrier systems with variable frequency drive | 2 |
Aircraft and jetway air-conditioning | Preconditioned air systems with efficiencies meeting ASHRAE 90.1 prescriptive efficiencies for HVAC equipment |
Data centers
Data centers that comprise at least 40% of the project’s total area with the electrical system in the project scope earn 2 points for complying with the data center electrical system requirements.
Warehouses
Refrigerated warehouses that comprise at least 20% of the project’s gross floor area with the refrigeration systems in the project scope earn 2 points for complying with the refrigeration system requirements.
OR
Option 2. Energy Simulation (1–7 points)
Demonstrate an improvement in future source energy calculated per ASHRAE Standard 90.1, Normative Appendix G, Performance Rating Method, with the following additional provisions:
- Use the ASHRAE 90.1 version applied for EAp2: Minimum Energy Efficiency.
- Case 1. ASHRAE 90.1-2019. Replace ASHRAE 90.1-2019, Table 4.2.1.1, Building Performance Factors, with Table 4. For major building renovation areas, multiply the BPF by 1.05.
- Case 2. ASHRAE 90.1-2022. Replace ASHRAE 90.1-2022, Table 4.2.1.1, Building Performance Factors, with Table 5. For major building renovation areas, multiply the BPF by 1.05.
- Replace all references to cost with future source energy. Use an electric site-to-source energy conversion factor of 2.0 based on future projections for the U.S. A lower national average value may be used as applicable for projects outside of the U.S.
- Model energy efficiency measures for plug and process loads using the Section G2.5 exceptional calculation method or approved calculations. Calculate the PI and percentage improvement with and without the plug and process savings.
- Calculate the PI and PI Target as follows:
- PInre = PBPnre / BBP
- PI = PBP / BBP
- PIt = [BBUE + (BPF x BBRE)] / BBP
where:- PInre = performance index for future source energy excluding on-site renewable contribution
- PI = performance index for future source energy including on-site renewable contribution
- PIt = performance index target for future source energy use
- BBP = baseline building performance for baseline building future source energy use
- BBUE = baseline building unregulated future source energy use
- BBRE = baseline building regulated future source energy use
- PBPnre = proposed building performance without any credit for reduced annual future source energy from on-site renewable energy generation systems
- PBP = proposed building performance, including the reduced annual future source energy associated with all on-site renewable energy generation systems
Points are awarded according to Table 3, using either Path 1 or Path 2.
Table 3. Points for percentage improvement in PI Below PIT
Path 1. On-Site Renewable Contribution | OR | Path 2. On-Site Renewable Contribution (100% – PI / PIt) | Points | ||
Case 1. ASHRAE 90.1-2019 | Case 2. ASHRAE 90.1-2022 | Case 1. ASHRAE 90.1-2019 | Case 2. ASHRAE 90.1-2022 | ||
2% | N/A |
| 10% | N/A | 1 |
5% | N/A |
| 20% | 0% | 2 |
8% | 0% |
| 30% | 13% | 3 |
11% | 3% |
| 40% | 26% | 4 |
14% | 6% |
| 50% | 39% | 5 |
17% | 9% |
| 60% | 52% | 6 |
20% | 12% |
| 70% | 65% | 7 |
Table 4. ASHRAE 90.1-2019: Equivalent Building Performance Factors for a Future Source Energy Metric
Building Type | Climate Zone | ||||||||||||||||||
| 0A | 0B | 1A | 1B | 2A | 2B | 3A | 3B | 3C | 4A | 4B | 4C | 5A | 5B | 5C | 6A | 6B | 7 | 8 |
Multifamily | 0.74 | 0.69 | 0.73 | 0.70 | 0.73 | 0.70 | 0.71 | 0.70 | 0.63 | 0.70 | 0.71 | 0.69 | 0.68 | 0.70 | 0.70 | 0.68 | 0.68 | 0.68 | 0.74 |
Healthcare/hospital | 0.72 | 0.72 | 0.73 | 0.73 | 0.74 | 0.71 | 0.72 | 0.74 | 0.71 | 0.72 | 0.73 | 0.71 | 0.74 | 0.73 | 0.80 | 0.73 | 0.77 | 0.78 | 0.79 |
Hotel/motel | 0.72 | 0.71 | 0.72 | 0.71 | 0.71 | 0.70 | 0.71 | 0.73 | 0.72 | 0.71 | 0.73 | 0.73 | 0.71 | 0.73 | 0.74 | 0.70 | 0.72 | 0.70 | 0.70 |
Office | 0.62 | 0.63 | 0.61 | 0.62 | 0.58 | 0.60 | 0.57 | 0.62 | 0.55 | 0.55 | 0.61 | 0.57 | 0.58 | 0.61 | 0.59 | 0.58 | 0.60 | 0.54 | 0.58 |
Restaurant | 0.65 | 0.62 | 0.63 | 0.61 | 0.62 | 0.58 | 0.63 | 0.63 | 0.63 | 0.67 | 0.66 | 0.66 | 0.70 | 0.70 | 0.68 | 0.73 | 0.72 | 0.74 | 0.77 |
Retail | 0.57 | 0.54 | 0.53 | 0.53 | 0.48 | 0.47 | 0.47 | 0.47 | 0.47 | 0.52 | 0.50 | 0.56 | 0.57 | 0.53 | 0.59 | 0.58 | 0.56 | 0.53 | 0.60 |
School | 0.57 | 0.57 | 0.58 | 0.57 | 0.55 | 0.54 | 0.57 | 0.51 | 0.49 | 0.48 | 0.51 | 0.52 | 0.51 | 0.53 | 0.51 | 0.53 | 0.50 | 0.51 | 0.58 |
Warehouse | 0.28 | 0.30 | 0.24 | 0.27 | 0.23 | 0.24 | 0.27 | 0.23 | 0.20 | 0.33 | 0.26 | 0.28 | 0.40 | 0.32 | 0.29 | 0.44 | 0.38 | 0.40 | 0.44 |
All others | 0.65 | 0.62 | 0.64 | 0.62 | 0.57 | 0.54 | 0.57 | 0.56 | 0.58 | 0.59 | 0.57 | 0.60 | 0.60 | 0.59 | 0.65 | 0.62 | 0.62 | 0.61 | 0.64 |
Table 5. ASHRAE 90.1-2022 — Equivalent Building Performance Factors for a Future Source Energy Metric
Building Type | Climate Zone | ||||||||||||||||||
| 0A | 0B | 1A | 1B | 2A | 2B | 3A | 3B | 3C | 4A | 4B | 4C | 5A | 5B | 5C | 6A | 6B | 7 | 8 |
Multifamily | 0.64 | 0.59 | 0.62 | 0.60 | 0.61 | 0.59 | 0.61 | 0.60 | 0.49 | 0.57 | 0.59 | 0.56 | 0.55 | 0.57 | 0.57 | 0.55 | 0.55 | 0.55 | 0.60 |
Healthcare/hospital | 0.64 | 0.64 | 0.66 | 0.65 | 0.66 | 0.63 | 0.64 | 0.65 | 0.63 | 0.64 | 0.65 | 0.62 | 0.64 | 0.62 | 0.69 | 0.63 | 0.68 | 0.69 | 0.70 |
Hotel/motel | 0.65 | 0.63 | 0.64 | 0.63 | 0.62 | 0.61 | 0.62 | 0.63 | 0.62 | 0.59 | 0.60 | 0.60 | 0.57 | 0.58 | 0.59 | 0.56 | 0.58 | 0.56 | 0.56 |
Office | 0.54 | 0.54 | 0.53 | 0.54 | 0.49 | 0.52 | 0.49 | 0.52 | 0.45 | 0.46 | 0.52 | 0.47 | 0.48 | 0.51 | 0.48 | 0.48 | 0.50 | 0.45 | 0.49 |
Restaurant | 0.61 | 0.58 | 0.58 | 0.57 | 0.57 | 0.54 | 0.58 | 0.59 | 0.57 | 0.62 | 0.61 | 0.61 | 0.65 | 0.64 | 0.63 | 0.67 | 0.66 | 0.69 | 0.72 |
Retail | 0.47 | 0.45 | 0.44 | 0.44 | 0.40 | 0.39 | 0.37 | 0.39 | 0.36 | 0.40 | 0.41 | 0.42 | 0.45 | 0.43 | 0.46 | 0.44 | 0.43 | 0.42 | 0.46 |
School | 0.52 | 0.53 | 0.53 | 0.53 | 0.51 | 0.51 | 0.53 | 0.48 | 0.46 | 0.43 | 0.48 | 0.47 | 0.45 | 0.49 | 0.46 | 0.46 | 0.44 | 0.44 | 0.48 |
Warehouse | 0.25 | 0.25 | 0.21 | 0.24 | 0.20 | 0.21 | 0.24 | 0.20 | 0.17 | 0.30 | 0.22 | 0.25 | 0.36 | 0.28 | 0.25 | 0.40 | 0.34 | 0.36 | 0.40 |
All others | 0.58 | 0.56 | 0.56 | 0.56 | 0.50 | 0.47 | 0.49 | 0.48 | 0.48 | 0.49 | 0.49 | 0.50 | 0.51 | 0.50 | 0.55 | 0.52 | 0.52 | 0.52 | 0.55 |
What does it cost?
Cost estimates for this credit
On each BD+C v4 credit, LEEDuser offers the wisdom of a team of architects, engineers, cost estimators, and LEED experts with hundreds of LEED projects between then. They analyzed the sustainable design strategies associated with each LEED credit, but also to assign actual costs to those strategies.
Our tab contains overall cost guidance, notes on what “soft costs” to expect, and a strategy-by-strategy breakdown of what to consider and what it might cost, in percentage premiums, actual costs, or both.
This information is also available in a full PDF download in The Cost of LEED v4 report.
Learn more about The Cost of LEED v4 »For full access, sign up now for LEEDuser Premium
Already a premium member? Log in now
Checklists
Step by step to LEED certification
LEEDuser’s checklists walk you through the key action steps you need to earn a credit, including how to avoid common pitfalls and save money.
For full access, sign up now for LEEDuser Premium
Already a premium member? Log in now
Documentation toolkit
The motherlode of cheat sheets
LEEDuser’s Documentation Toolkit is loaded with calculators to help assess credit compliance, tracking spreadsheets for materials, sample templates to help guide your narratives and LEED Online submissions, and examples of actual submissions from certified LEED projects for you to check your work against. To get your plaque, start with the right toolkit.
For full access, sign up now for LEEDuser Premium
Already a premium member? Log in now
Credit language
© Copyright U.S. Green Building Council, Inc. All rights reserved.
Intent
To design buildings that minimize energy use to reduce the environmental damage caused by resource extraction, air pollution, and greenhouse gas emissions and to facilitate the transition to a clean energy future.
Requirements
Platinum Requirements:
Five points are required.
Option 1. Prescriptive Path (1–7 points)
Pursue Path 1 and/or Path 2 for a maximum of 7 points.
PATH 1. REGULATED LOADS (1–6 POINTS)
Points are awarded according to Table 1, using either Case 1 or Case 2.
Case 1. ASHRAE 90.1-2019 (1–5 points)
Available only to projects registered before January 1, 2028.
- Comply with the provisions of ASHRAE 90.1-2019, Sections 5–10.
- Implement Additional Efficiency Requirements credits calculated per ASHRAE 90.1-2022, Section 11, from the list of eligible measures referenced below. Where ASHRAE 90.1-2022, Section 11, references the prescriptive requirements of ASHRAE 90.1-2022, Sections 5–10, such as lighting power density or equipment efficiency, replace with the matching prescriptive values in ASHRAE 90.1-2019.
- Central systems. Earn 1 point for every 13 energy credits where the LEED BD+C: Core and Shell project includes a central HVAC system or service water heating system that includes chillers, boilers, service water heating equipment, or loop pumping systems with heat rejection.
- All others. Earn 1 point for every nine energy credits for all other LEED BD+C: Core and Shell projects.
OR
Case 2. ASHRAE 90.1-2022 (2–6 points)
- Comply with the provisions of ASHRAE 90.1-2022, Sections 5–11.
- Implement incremental ASHRAE 90.1 2022, Section 11 credits above the minimum required from the list of eligible measures below.
- Central systems: 1 point for every 13 incremental energy credits where the LEED BD+C: Core and Shell project includes a central HVAC system or service water heating system that includes chillers, boilers, service water heating equipment, or loop pumping systems with heat rejection.
- All others: 1 point for every nine incremental energy credits for all other LEED BD+C: Core and Shell projects.
Eligible measures from ASHRAE 90.1-2022, Section 11.5.2, for LEED points
- HVAC measures (H01 to H07)
- Service water heating measures (W01 to W09)
- Lighting measures (L01 to L06)
- G07 building mass/night flush
Table 1. Points for ASHRAE 90.1-2022, Section 11 Credits
Points | Compliance Path | |||
Case 1. ASHRAE 90.1-2019 | Case 2. ASHRAE 90.1-2022 | |||
Central Systems | All Others | Central Systems | All Others | |
1 | 13 credits | 9 credits | N/A | N/A |
2 | 26 credits | 18 credits | Min. required by ASHRAE 90.1-2022 | Min. required by ASHRAE 90.1-2022 |
3 | 39 credits | 27 credits | Min. required + 13 credits | Min. required + 9 credits |
4 | 52 credits | 36 credits | Min. required + 26 credits | Min. required + 18 credits |
5 | 65 credits | 45 credits | Min. required + 39 credits | Min. required + 27 credits |
6 | – | – | Min. required + 52 credits | Min. required + 36 credits |
AND/OR
PATH 2. PLUG AND PROCESS LOADS (1–3 POINTS)
Case 1. Plug Load Management (1 point)
Implement the following:
- Provide to all regular occupants of the building a plug load dashboard accessed through an application that displays base building plug loads and allows tenants to choose whether to display plug loads to their occupants.
- Configure the plug load monitoring system with the capability to expand to monitor future plug loads for each floor and for individual tenant spaces.
AND/OR
Case 2. Efficient Plug and Process Load Equipment (1–3 points)
Install or reuse equipment meeting the criteria in Table 2. Points are awarded according to Table 2 up to a maximum of 3 points for each equipment category where the criteria are met.
Table 2. Plug, Process, Refrigeration, and Conveyance Equipment Criteria
Equipment Category | Applicable Equipment | Criteria | Points |
People conveyance | Elevators Escalators Moving walkways | ISO 25745. At least Class A-rated | 2 |
Data center electrical system | Electrical system design | ASHRAE 90.4-2022. Design electrical loss component is at least 20% lower than the maximum design electrical loss. | 1 |
Refrigeration systems | Referenced in ASHRAE 90.1, Section 6.8 tables, AND not ENERGY STAR® eligible | 10% improvement beyond ASHRAE 90.1, Section 6.8 tables | 1 |
Refrigerated warehouse | California Title 24-2022, Section 120.6, refrigerated warehouse requirements | ||
Airport equipment | Baggage handling equipment | Individual carrier systems with variable frequency drive | 2 |
Aircraft and jetway air-conditioning | Preconditioned air systems with efficiencies meeting ASHRAE 90.1 prescriptive efficiencies for HVAC equipment |
Data centers
Data centers that comprise at least 40% of the project’s total area with the electrical system in the project scope earn 2 points for complying with the data center electrical system requirements.
Warehouses
Refrigerated warehouses that comprise at least 20% of the project’s gross floor area with the refrigeration systems in the project scope earn 2 points for complying with the refrigeration system requirements.
OR
Option 2. Energy Simulation (1–7 points)
Demonstrate an improvement in future source energy calculated per ASHRAE Standard 90.1, Normative Appendix G, Performance Rating Method, with the following additional provisions:
- Use the ASHRAE 90.1 version applied for EAp2: Minimum Energy Efficiency.
- Case 1. ASHRAE 90.1-2019. Replace ASHRAE 90.1-2019, Table 4.2.1.1, Building Performance Factors, with Table 4. For major building renovation areas, multiply the BPF by 1.05.
- Case 2. ASHRAE 90.1-2022. Replace ASHRAE 90.1-2022, Table 4.2.1.1, Building Performance Factors, with Table 5. For major building renovation areas, multiply the BPF by 1.05.
- Replace all references to cost with future source energy. Use an electric site-to-source energy conversion factor of 2.0 based on future projections for the U.S. A lower national average value may be used as applicable for projects outside of the U.S.
- Model energy efficiency measures for plug and process loads using the Section G2.5 exceptional calculation method or approved calculations. Calculate the PI and percentage improvement with and without the plug and process savings.
- Calculate the PI and PI Target as follows:
- PInre = PBPnre / BBP
- PI = PBP / BBP
- PIt = [BBUE + (BPF x BBRE)] / BBP
where:- PInre = performance index for future source energy excluding on-site renewable contribution
- PI = performance index for future source energy including on-site renewable contribution
- PIt = performance index target for future source energy use
- BBP = baseline building performance for baseline building future source energy use
- BBUE = baseline building unregulated future source energy use
- BBRE = baseline building regulated future source energy use
- PBPnre = proposed building performance without any credit for reduced annual future source energy from on-site renewable energy generation systems
- PBP = proposed building performance, including the reduced annual future source energy associated with all on-site renewable energy generation systems
Points are awarded according to Table 3, using either Path 1 or Path 2.
Table 3. Points for percentage improvement in PI Below PIT
Path 1. On-Site Renewable Contribution | OR | Path 2. On-Site Renewable Contribution (100% – PI / PIt) | Points | ||
Case 1. ASHRAE 90.1-2019 | Case 2. ASHRAE 90.1-2022 | Case 1. ASHRAE 90.1-2019 | Case 2. ASHRAE 90.1-2022 | ||
2% | N/A |
| 10% | N/A | 1 |
5% | N/A |
| 20% | 0% | 2 |
8% | 0% |
| 30% | 13% | 3 |
11% | 3% |
| 40% | 26% | 4 |
14% | 6% |
| 50% | 39% | 5 |
17% | 9% |
| 60% | 52% | 6 |
20% | 12% |
| 70% | 65% | 7 |
Table 4. ASHRAE 90.1-2019: Equivalent Building Performance Factors for a Future Source Energy Metric
Building Type | Climate Zone | ||||||||||||||||||
| 0A | 0B | 1A | 1B | 2A | 2B | 3A | 3B | 3C | 4A | 4B | 4C | 5A | 5B | 5C | 6A | 6B | 7 | 8 |
Multifamily | 0.74 | 0.69 | 0.73 | 0.70 | 0.73 | 0.70 | 0.71 | 0.70 | 0.63 | 0.70 | 0.71 | 0.69 | 0.68 | 0.70 | 0.70 | 0.68 | 0.68 | 0.68 | 0.74 |
Healthcare/hospital | 0.72 | 0.72 | 0.73 | 0.73 | 0.74 | 0.71 | 0.72 | 0.74 | 0.71 | 0.72 | 0.73 | 0.71 | 0.74 | 0.73 | 0.80 | 0.73 | 0.77 | 0.78 | 0.79 |
Hotel/motel | 0.72 | 0.71 | 0.72 | 0.71 | 0.71 | 0.70 | 0.71 | 0.73 | 0.72 | 0.71 | 0.73 | 0.73 | 0.71 | 0.73 | 0.74 | 0.70 | 0.72 | 0.70 | 0.70 |
Office | 0.62 | 0.63 | 0.61 | 0.62 | 0.58 | 0.60 | 0.57 | 0.62 | 0.55 | 0.55 | 0.61 | 0.57 | 0.58 | 0.61 | 0.59 | 0.58 | 0.60 | 0.54 | 0.58 |
Restaurant | 0.65 | 0.62 | 0.63 | 0.61 | 0.62 | 0.58 | 0.63 | 0.63 | 0.63 | 0.67 | 0.66 | 0.66 | 0.70 | 0.70 | 0.68 | 0.73 | 0.72 | 0.74 | 0.77 |
Retail | 0.57 | 0.54 | 0.53 | 0.53 | 0.48 | 0.47 | 0.47 | 0.47 | 0.47 | 0.52 | 0.50 | 0.56 | 0.57 | 0.53 | 0.59 | 0.58 | 0.56 | 0.53 | 0.60 |
School | 0.57 | 0.57 | 0.58 | 0.57 | 0.55 | 0.54 | 0.57 | 0.51 | 0.49 | 0.48 | 0.51 | 0.52 | 0.51 | 0.53 | 0.51 | 0.53 | 0.50 | 0.51 | 0.58 |
Warehouse | 0.28 | 0.30 | 0.24 | 0.27 | 0.23 | 0.24 | 0.27 | 0.23 | 0.20 | 0.33 | 0.26 | 0.28 | 0.40 | 0.32 | 0.29 | 0.44 | 0.38 | 0.40 | 0.44 |
All others | 0.65 | 0.62 | 0.64 | 0.62 | 0.57 | 0.54 | 0.57 | 0.56 | 0.58 | 0.59 | 0.57 | 0.60 | 0.60 | 0.59 | 0.65 | 0.62 | 0.62 | 0.61 | 0.64 |
Table 5. ASHRAE 90.1-2022 — Equivalent Building Performance Factors for a Future Source Energy Metric
Building Type | Climate Zone | ||||||||||||||||||
| 0A | 0B | 1A | 1B | 2A | 2B | 3A | 3B | 3C | 4A | 4B | 4C | 5A | 5B | 5C | 6A | 6B | 7 | 8 |
Multifamily | 0.64 | 0.59 | 0.62 | 0.60 | 0.61 | 0.59 | 0.61 | 0.60 | 0.49 | 0.57 | 0.59 | 0.56 | 0.55 | 0.57 | 0.57 | 0.55 | 0.55 | 0.55 | 0.60 |
Healthcare/hospital | 0.64 | 0.64 | 0.66 | 0.65 | 0.66 | 0.63 | 0.64 | 0.65 | 0.63 | 0.64 | 0.65 | 0.62 | 0.64 | 0.62 | 0.69 | 0.63 | 0.68 | 0.69 | 0.70 |
Hotel/motel | 0.65 | 0.63 | 0.64 | 0.63 | 0.62 | 0.61 | 0.62 | 0.63 | 0.62 | 0.59 | 0.60 | 0.60 | 0.57 | 0.58 | 0.59 | 0.56 | 0.58 | 0.56 | 0.56 |
Office | 0.54 | 0.54 | 0.53 | 0.54 | 0.49 | 0.52 | 0.49 | 0.52 | 0.45 | 0.46 | 0.52 | 0.47 | 0.48 | 0.51 | 0.48 | 0.48 | 0.50 | 0.45 | 0.49 |
Restaurant | 0.61 | 0.58 | 0.58 | 0.57 | 0.57 | 0.54 | 0.58 | 0.59 | 0.57 | 0.62 | 0.61 | 0.61 | 0.65 | 0.64 | 0.63 | 0.67 | 0.66 | 0.69 | 0.72 |
Retail | 0.47 | 0.45 | 0.44 | 0.44 | 0.40 | 0.39 | 0.37 | 0.39 | 0.36 | 0.40 | 0.41 | 0.42 | 0.45 | 0.43 | 0.46 | 0.44 | 0.43 | 0.42 | 0.46 |
School | 0.52 | 0.53 | 0.53 | 0.53 | 0.51 | 0.51 | 0.53 | 0.48 | 0.46 | 0.43 | 0.48 | 0.47 | 0.45 | 0.49 | 0.46 | 0.46 | 0.44 | 0.44 | 0.48 |
Warehouse | 0.25 | 0.25 | 0.21 | 0.24 | 0.20 | 0.21 | 0.24 | 0.20 | 0.17 | 0.30 | 0.22 | 0.25 | 0.36 | 0.28 | 0.25 | 0.40 | 0.34 | 0.36 | 0.40 |
All others | 0.58 | 0.56 | 0.56 | 0.56 | 0.50 | 0.47 | 0.49 | 0.48 | 0.48 | 0.49 | 0.49 | 0.50 | 0.51 | 0.50 | 0.55 | 0.52 | 0.52 | 0.52 | 0.55 |