LEED v5
Existing Buildings
Energy and Atmosphere
Peak Load Reduction Performance

EBOM-v5 EAc4: Peak Load Reduction Performance 1 point

LEEDuser overview

Explore this LEED credit

Post your questions on this credit in the forum, and click on the credit language tab to review to the LEED requirements.

Credit language

USGBC logo

© Copyright U.S. Green Building Council, Inc. All rights reserved.

Intent

To reduce the stress on the grid from peak loads, reduce greenhouse gas emissions, increase grid reliability, and make energy generation and distribution systems more affordable and more efficient.

Requirements

Option 1. Electric Demand Reduction (1 point)
The project must have electric interval meters that measure building electric demand at least hourly. Utility meters with monthly peak electric demand reporting capabilities are acceptable. For a building with multiple electric meters, building peak monthly demand may be determined using either monthly peak coincident demand or the sum of peak monthly demand from each meter. Tenant meters or meters without hourly interval metering capabilities may be excluded for up to 20% of the gross building area.

Report the monthly peak building electric demand for the current 12-month reporting period and for a baseline 12-month reporting period occurring within eight years before the end of the 12-month reporting period. Compare the current reporting period to the baseline reporting period to demonstrate a 10% reduction in the sum of monthly peak demand for the two months with highest demand. Data may be normalized for equipment electrification.

OR 

Option 2. Thermal Demand Reduction (1 point)
The project must have thermal meters or measurement devices capable of measuring and recording the following for at least 80% of the project’s total installed thermal capacity:

  • Heating demand (for climate zones 3–8): measure total hourly thermal energy consumed for space heating, service water heating, and process heating.
  • Cooling demand (for climate zones 0–5): measure total hourly thermal energy consumed for space cooling and process cooling.

Report the monthly peak hourly heating demand and the monthly peak hourly cooling demand for the current 12-month reporting period and for a baseline 12-month reporting period occurring within eight years before the end of the 12-month reporting period. Compare the current reporting period to the baseline reporting period to demonstrate a 10% reduction in the sum of the maximum monthly heating demand and the maximum monthly cooling demand.

See all forum discussions about this credit »

Frequently asked questions

No results found
See all forum discussions about this credit »

What does it cost?

Cost estimates for this credit

On each BD+C v4 credit, LEEDuser offers the wisdom of a team of architects, engineers, cost estimators, and LEED experts with hundreds of LEED projects between then. They analyzed the sustainable design strategies associated with each LEED credit, but also to assign actual costs to those strategies.

Our tab contains overall cost guidance, notes on what “soft costs” to expect, and a strategy-by-strategy breakdown of what to consider and what it might cost, in percentage premiums, actual costs, or both.

This information is also available in a full PDF download in The Cost of LEED v4 report.

Learn more about The Cost of LEED v4 »

For full access, sign up now for LEEDuser Premium

Already a premium member? Log in now

Checklists

Step by step to LEED certification

LEEDuser’s checklists walk you through the key action steps you need to earn a credit, including how to avoid common pitfalls and save money.

For full access, sign up now for LEEDuser Premium

Already a premium member? Log in now

Documentation toolkit

The motherlode of cheat sheets

LEEDuser’s Documentation Toolkit is loaded with calculators to help assess credit compliance, tracking spreadsheets for materials, sample templates to help guide your narratives and LEED Online submissions, and examples of actual submissions from certified LEED projects for you to check your work against. To get your plaque, start with the right toolkit.

For full access, sign up now for LEEDuser Premium

Already a premium member? Log in now


Addenda

This credit has no LEEDuser summary

See all forum discussions about this credit »

Credit language

USGBC logo

© Copyright U.S. Green Building Council, Inc. All rights reserved.

Intent

To reduce the stress on the grid from peak loads, reduce greenhouse gas emissions, increase grid reliability, and make energy generation and distribution systems more affordable and more efficient.

Requirements

Option 1. Electric Demand Reduction (1 point)
The project must have electric interval meters that measure building electric demand at least hourly. Utility meters with monthly peak electric demand reporting capabilities are acceptable. For a building with multiple electric meters, building peak monthly demand may be determined using either monthly peak coincident demand or the sum of peak monthly demand from each meter. Tenant meters or meters without hourly interval metering capabilities may be excluded for up to 20% of the gross building area.

Report the monthly peak building electric demand for the current 12-month reporting period and for a baseline 12-month reporting period occurring within eight years before the end of the 12-month reporting period. Compare the current reporting period to the baseline reporting period to demonstrate a 10% reduction in the sum of monthly peak demand for the two months with highest demand. Data may be normalized for equipment electrification.

OR 

Option 2. Thermal Demand Reduction (1 point)
The project must have thermal meters or measurement devices capable of measuring and recording the following for at least 80% of the project’s total installed thermal capacity:

  • Heating demand (for climate zones 3–8): measure total hourly thermal energy consumed for space heating, service water heating, and process heating.
  • Cooling demand (for climate zones 0–5): measure total hourly thermal energy consumed for space cooling and process cooling.

Report the monthly peak hourly heating demand and the monthly peak hourly cooling demand for the current 12-month reporting period and for a baseline 12-month reporting period occurring within eight years before the end of the 12-month reporting period. Compare the current reporting period to the baseline reporting period to demonstrate a 10% reduction in the sum of the maximum monthly heating demand and the maximum monthly cooling demand.