EBOM-v5 EAp1: Carbon Projection from Energy Use Required

LEEDuser overview

Explore this LEED credit

Post your questions on this credit in the forum, and click on the credit language tab to review to the LEED requirements.

Credit language

USGBC logo

© Copyright U.S. Green Building Council, Inc. All rights reserved.

Intent

To provide a baseline operational carbon emissions projection from energy use and to increase carbon literacy at the project level and throughout the real estate industry. 

Requirements

Comply with the following requirements:

Operational Carbon Projection
Using the annual energy use data submitted, the project’s current grid data, and the project’s location, USGBC will generate a 25-year BAU projection of the project’s carbon emissions, including a comparison with a straight-line reduction.

Provide a high-level estimated end-use breakdown as shown in Table 1.

Table 1. Estimated End Use Breakdown 

End Use

Electrical Used (Y/N)

Fuel Used (Y/N) and Type 

Total Electrical Use (%)

% of Total Fuel Use (%)

Site Energy Use (%)

Space heating

 

 

 

 

 

Water heating

 

 

 

 

 

Cooking

 

 

 

 

 

Space cooling

 

 

 

 

 

Lighting

 

 

 

 

 

Plug, process, and other

 

 

 

 

 

 

AND

Building Performance Standard Business-as-Usual Projection
Projects subject to a carbon-based or energy use intensity (EUI)-based building performance standard (BPS) must create an ordinance-specific 25-year BPS-BAU projection with an overlay of the BPS caps. For EUI-based BPS, the BPS-BAU must be an energy BAU, and for carbon-based BPS, the BPS-BAU must be a carbon BAU that reflects the electrical carbon coefficients as defined in the ordinance. If applicable, calculate the assessed annual fines or fees that will apply for exceeding the caps and the cumulative fines or fees over the 25-year period.

The owner or owner's representative must attest that they have reviewed the project’s BAU and fee projections.
 

See all forum discussions about this credit »

Frequently asked questions

No results found
See all forum discussions about this credit »

What does it cost?

Cost estimates for this credit

On each BD+C v4 credit, LEEDuser offers the wisdom of a team of architects, engineers, cost estimators, and LEED experts with hundreds of LEED projects between then. They analyzed the sustainable design strategies associated with each LEED credit, but also to assign actual costs to those strategies.

Our tab contains overall cost guidance, notes on what “soft costs” to expect, and a strategy-by-strategy breakdown of what to consider and what it might cost, in percentage premiums, actual costs, or both.

This information is also available in a full PDF download in The Cost of LEED v4 report.

Learn more about The Cost of LEED v4 »

For full access, sign up now for LEEDuser Premium

Already a premium member? Log in now

Checklists

Step by step to LEED certification

LEEDuser’s checklists walk you through the key action steps you need to earn a credit, including how to avoid common pitfalls and save money.

For full access, sign up now for LEEDuser Premium

Already a premium member? Log in now

Documentation toolkit

The motherlode of cheat sheets

LEEDuser’s Documentation Toolkit is loaded with calculators to help assess credit compliance, tracking spreadsheets for materials, sample templates to help guide your narratives and LEED Online submissions, and examples of actual submissions from certified LEED projects for you to check your work against. To get your plaque, start with the right toolkit.

For full access, sign up now for LEEDuser Premium

Already a premium member? Log in now


Addenda

This credit has no LEEDuser summary

See all forum discussions about this credit »

Credit language

USGBC logo

© Copyright U.S. Green Building Council, Inc. All rights reserved.

Intent

To provide a baseline operational carbon emissions projection from energy use and to increase carbon literacy at the project level and throughout the real estate industry. 

Requirements

Comply with the following requirements:

Operational Carbon Projection
Using the annual energy use data submitted, the project’s current grid data, and the project’s location, USGBC will generate a 25-year BAU projection of the project’s carbon emissions, including a comparison with a straight-line reduction.

Provide a high-level estimated end-use breakdown as shown in Table 1.

Table 1. Estimated End Use Breakdown 

End Use

Electrical Used (Y/N)

Fuel Used (Y/N) and Type 

Total Electrical Use (%)

% of Total Fuel Use (%)

Site Energy Use (%)

Space heating

 

 

 

 

 

Water heating

 

 

 

 

 

Cooking

 

 

 

 

 

Space cooling

 

 

 

 

 

Lighting

 

 

 

 

 

Plug, process, and other

 

 

 

 

 

 

AND

Building Performance Standard Business-as-Usual Projection
Projects subject to a carbon-based or energy use intensity (EUI)-based building performance standard (BPS) must create an ordinance-specific 25-year BPS-BAU projection with an overlay of the BPS caps. For EUI-based BPS, the BPS-BAU must be an energy BAU, and for carbon-based BPS, the BPS-BAU must be a carbon BAU that reflects the electrical carbon coefficients as defined in the ordinance. If applicable, calculate the assessed annual fines or fees that will apply for exceeding the caps and the cumulative fines or fees over the 25-year period.

The owner or owner's representative must attest that they have reviewed the project’s BAU and fee projections.
 

See all forum discussions about this credit »