EBOM-v5 IPp4: Current Facilities Requirements and O+M Plan Required
LEEDuser overview
Explore this LEED credit
Post your questions on this credit in the forum, and click on the credit language tab to review to the LEED requirements.
Credit language
© Copyright U.S. Green Building Council, Inc. All rights reserved.
Intent
To promote continuity of information to ensure that energy-efficient operating strategies are maintained and to provide a foundation for green jobs training and system analysis.
Requirements
Maintain a current facilities requirements (CFR) and O+M plan that contains the information necessary to operate the project efficiently.
The plan must include the following:
- Current sequence of operations for the building
- Project occupancy schedule
- Equipment run-time schedules
- Set points for all HVAC equipment
- Set points for lighting levels throughout the project
- Information on ventilation system operation and preventive maintenance as outlined in ASHRAE 62.1-2022, Table 8.1
- Changes in schedules or set points for different seasons, days of the week, and times of day
- Systems narrative for mechanical and electrical systems and equipment in the project
- Preventive maintenance plan for mechanical, electrical, and envelope systems and equipment in the project
- The CFR and O+M plan must be current at the time of the LEED application.
The CFR and O+M plan must be current at the time of the LEED application.
See all forum discussions about this credit »What does it cost?
Cost estimates for this credit
On each BD+C v4 credit, LEEDuser offers the wisdom of a team of architects, engineers, cost estimators, and LEED experts with hundreds of LEED projects between then. They analyzed the sustainable design strategies associated with each LEED credit, but also to assign actual costs to those strategies.
Our tab contains overall cost guidance, notes on what “soft costs” to expect, and a strategy-by-strategy breakdown of what to consider and what it might cost, in percentage premiums, actual costs, or both.
This information is also available in a full PDF download in The Cost of LEED v4 report.
Learn more about The Cost of LEED v4 »For full access, sign up now for LEEDuser Premium
Already a premium member? Log in now
Checklists
Step by step to LEED certification
LEEDuser’s checklists walk you through the key action steps you need to earn a credit, including how to avoid common pitfalls and save money.
For full access, sign up now for LEEDuser Premium
Already a premium member? Log in now
Documentation toolkit
The motherlode of cheat sheets
LEEDuser’s Documentation Toolkit is loaded with calculators to help assess credit compliance, tracking spreadsheets for materials, sample templates to help guide your narratives and LEED Online submissions, and examples of actual submissions from certified LEED projects for you to check your work against. To get your plaque, start with the right toolkit.
For full access, sign up now for LEEDuser Premium
Already a premium member? Log in now
Credit language
© Copyright U.S. Green Building Council, Inc. All rights reserved.
Intent
To promote continuity of information to ensure that energy-efficient operating strategies are maintained and to provide a foundation for green jobs training and system analysis.
Requirements
Maintain a current facilities requirements (CFR) and O+M plan that contains the information necessary to operate the project efficiently.
The plan must include the following:
- Current sequence of operations for the building
- Project occupancy schedule
- Equipment run-time schedules
- Set points for all HVAC equipment
- Set points for lighting levels throughout the project
- Information on ventilation system operation and preventive maintenance as outlined in ASHRAE 62.1-2022, Table 8.1
- Changes in schedules or set points for different seasons, days of the week, and times of day
- Systems narrative for mechanical and electrical systems and equipment in the project
- Preventive maintenance plan for mechanical, electrical, and envelope systems and equipment in the project
- The CFR and O+M plan must be current at the time of the LEED application.
The CFR and O+M plan must be current at the time of the LEED application.
See all forum discussions about this credit »