LEED v5
Existing Buildings
Materials and Resources
Waste Reduction Performance

EBOM-v5 MRc1: Waste Reduction Performance 1-12 points

LEEDuser overview

Explore this LEED credit

Post your questions on this credit in the forum, and click on the credit language tab to review to the LEED requirements.

Credit language

USGBC logo

© Copyright U.S. Green Building Council, Inc. All rights reserved.

Intent

To prevent waste and reduce the amount of materials from building operations and maintenance disposed of in landfills or incinerators.

Requirements

Divert materials generated from building operations and maintenance activities from reaching landfills, incineration (waste-to-energy), or other disposal methods. Diversion includes strategies such as waste prevention (reduction), reuse, recycling, or composting. Points are awarded according to Table 1.

Table 1. LEED Points for Waste Diversion

Waste Diversion

Points

6%

1

12%

2

18%

3

24%

4

30%

5

36%

6

42%

7

48%

8

54%

9

60%

10

70%

11

80%

12

 

Waste Diversion Calculation
Calculate a waste diversion rate by tracking the total amount of materials generated from ongoing building operations and maintenance activities for a minimum of three consecutive months within the 12-month reporting period. Track waste generation monthly and include the material type and weight of all nonhazardous solid materials.

Track or estimate variations in materials management that occur outside the reporting period, such as seasonal collection or intermittent waste streams.

Calculate waste diversion by tracking the amount of materials (by weight) diverted from landfills and incineration. For diverted materials, specify the diversion method (reduce, reuse, recycle, compost, etc.). If material quantities are estimated, provide the methodology and/or source references used to make calculations. If actual weights are unavailable for certain material types or hauling methods, volume-to-weight conversion average values can be used.

To calculate the overall diversion rate, divide the weight of materials diverted by the total weight of materials generated for the same reporting period. Account for seasonal collection or intermittent waste streams within the calculations. See Equation 1 for the waste diversion calculation:

Equation 1. Waste diversion calculation

See all forum discussions about this credit »

Frequently asked questions

No results found
See all forum discussions about this credit »

What does it cost?

Cost estimates for this credit

On each BD+C v4 credit, LEEDuser offers the wisdom of a team of architects, engineers, cost estimators, and LEED experts with hundreds of LEED projects between then. They analyzed the sustainable design strategies associated with each LEED credit, but also to assign actual costs to those strategies.

Our tab contains overall cost guidance, notes on what “soft costs” to expect, and a strategy-by-strategy breakdown of what to consider and what it might cost, in percentage premiums, actual costs, or both.

This information is also available in a full PDF download in The Cost of LEED v4 report.

Learn more about The Cost of LEED v4 »

For full access, sign up now for LEEDuser Premium

Already a premium member? Log in now

Checklists

Step by step to LEED certification

LEEDuser’s checklists walk you through the key action steps you need to earn a credit, including how to avoid common pitfalls and save money.

For full access, sign up now for LEEDuser Premium

Already a premium member? Log in now

Documentation toolkit

The motherlode of cheat sheets

LEEDuser’s Documentation Toolkit is loaded with calculators to help assess credit compliance, tracking spreadsheets for materials, sample templates to help guide your narratives and LEED Online submissions, and examples of actual submissions from certified LEED projects for you to check your work against. To get your plaque, start with the right toolkit.

For full access, sign up now for LEEDuser Premium

Already a premium member? Log in now


Addenda

This credit has no LEEDuser summary

See all forum discussions about this credit »

Credit language

USGBC logo

© Copyright U.S. Green Building Council, Inc. All rights reserved.

Intent

To prevent waste and reduce the amount of materials from building operations and maintenance disposed of in landfills or incinerators.

Requirements

Divert materials generated from building operations and maintenance activities from reaching landfills, incineration (waste-to-energy), or other disposal methods. Diversion includes strategies such as waste prevention (reduction), reuse, recycling, or composting. Points are awarded according to Table 1.

Table 1. LEED Points for Waste Diversion

Waste Diversion

Points

6%

1

12%

2

18%

3

24%

4

30%

5

36%

6

42%

7

48%

8

54%

9

60%

10

70%

11

80%

12

 

Waste Diversion Calculation
Calculate a waste diversion rate by tracking the total amount of materials generated from ongoing building operations and maintenance activities for a minimum of three consecutive months within the 12-month reporting period. Track waste generation monthly and include the material type and weight of all nonhazardous solid materials.

Track or estimate variations in materials management that occur outside the reporting period, such as seasonal collection or intermittent waste streams.

Calculate waste diversion by tracking the amount of materials (by weight) diverted from landfills and incineration. For diverted materials, specify the diversion method (reduce, reuse, recycle, compost, etc.). If material quantities are estimated, provide the methodology and/or source references used to make calculations. If actual weights are unavailable for certain material types or hauling methods, volume-to-weight conversion average values can be used.

To calculate the overall diversion rate, divide the weight of materials diverted by the total weight of materials generated for the same reporting period. Account for seasonal collection or intermittent waste streams within the calculations. See Equation 1 for the waste diversion calculation:

Equation 1. Waste diversion calculation

See all forum discussions about this credit »