Hospitality-CI-v4 EQc7: Daylight 1-3 points
LEEDuser overview
Frank advice from LEED experts
LEED is changing all the time, and every project is unique. Even seasoned professionals can miss a critical detail and lose a credit or even a prerequisite at the last minute. Our expert advice guides our LEEDuser Premium members and saves you valuable time.
For full access, sign up now for LEEDuser Premium
Already a premium member? Log in now
Credit language
© Copyright U.S. Green Building Council, Inc. All rights reserved.
Intent
To connect building occupants with the outdoors, reinforce circadian rhythms, and reduce the use of electrical lighting by introducing daylight into the space.Requirements
Provide manual or automatic (with manual override) glare-control devices for all regularly occupied spaces. Select one of the following three options.Option 1. Simulation: Spatial Daylight Autonomy (2–3 points)
Demonstrate through annual computer simulations that spatial daylight autonomy300/50% (sDA300/50%) of at least 55%, 75%, or 90% is achieved. Use regularly occupied floor area. Points are awarded according to Table 1.Table 1. Points for daylit floor area: Spatial daylight autonomy
CI, CI Retail, CI Hospitality |
|
|---|---|
sDA (for regularly occupied floor area) |
Points |
55% |
2 |
75% |
3 |
Option 2. Simulation: Illuminance Calculations (1–2 points)
Demonstrate through computer modeling that illuminance levels will be between 300 lux and 3,000 lux for 9 a.m. and 3 p.m., both on a clear-sky day at the equinox, for the floor area indicated in Table 2. Use regularly occupied floor area.Table 2. Points for daylit floor area: Illuminance calculation
CI, CI Retail, CI Hospitality |
|
|---|---|
Percentage of regularly occupied floor area |
Points |
75% |
1 |
90% |
2 |
- Use typical meteorological year data, or an equivalent, for the nearest available weather station.
- Select one day within 15 days of September 21 and one day within 15 days of March 21 that represent the clearest sky condition.
- Use the average of the hourly value for the two selected days. Exclude blinds or shades from the model. Include any permanent interior obstructions and movable furniture and partitions.
- Measure at appropriate work plane height during any hour between 9 a.m. and 3 p.m.
- Take one measurement in any regularly occupied month, and take a second as indicated in Table 4.
- For spaces larger than 150 square feet (14 square meters), take measurements on a maximum 10 foot (3 meter) square grid.
- For spaces 150 square feet (14 square meters) or smaller, take measurements on a maximum 3 foot (900 millimeters) square grid.
Option 3. Measurement (2-3 points, 1-2 points Healthcare)
Achieve illuminance levels between 300 lux and 3,000 lux for the floor area indicated in Table 3.Table 3. Points for daylit floor area: Measurement
NC, CS, Schools, Retail, Data Centers, Warehouses & Distribution Centers, Hospitality, CI |
Healthcare |
||
|---|---|---|---|
Percentage of regularly occupied floor area |
Points |
Percentage of perimeter floor area |
Points |
75 |
2 |
75 |
1 |
90 |
3 |
90 |
2 |
Table 4. Timing of measurements for illuminance
If first measurement is taken in … |
take second measurement in … |
|---|---|
January |
May-September |
February |
June-October |
March |
June-July, November-December |
April |
August-December |
May |
September-January |
June |
October-February |
July |
November-March |
August |
December-April |
September |
December-January, May-June |
October |
February-June |
November |
March-July |
December |
April-August |
Frequently asked questions
What types of glare control are acceptable for this credit?The answer to this question is available to LEEDuser premium members. Start a free trial » (If you're already a premium member, log in here.) |
Do I actually need to submit the USGBC Daylight and Quality Views calculator?The answer to this question is available to LEEDuser premium members. Start a free trial » (If you're already a premium member, log in here.) |
Is it possible to combine Options 1 and 2 for different spaces in the same building?The answer to this question is available to LEEDuser premium members. Start a free trial » (If you're already a premium member, log in here.) |
Can electrochromic glazing qualify as a glare control device?The answer to this question is available to LEEDuser premium members. Start a free trial » (If you're already a premium member, log in here.) |
What spaces are considered regularly occupied and must be included in the calculations?The answer to this question is available to LEEDuser premium members. Start a free trial » (If you're already a premium member, log in here.) |
Can I use Revit to document this credit?The answer to this question is available to LEEDuser premium members. Start a free trial » (If you're already a premium member, log in here.) |
If I’m pursuing Option 2 or 3, can I average the compliant square footage between 9 a.m. and 3 p.m. for a space and use the average as the compliant square footage?The answer to this question is available to LEEDuser premium members. Start a free trial » (If you're already a premium member, log in here.) |
What daylight simulation software can I use for LEED compliance?The answer to this question is available to LEEDuser premium members. Start a free trial » (If you're already a premium member, log in here.) |
Can I mix and match daylight analysis methods? What if one room meets the illuminance thresholds but not the ASE limit?The answer to this question is available to LEEDuser premium members. Start a free trial » (If you're already a premium member, log in here.) |
My office space will have cubicles with high partitions. Should I include those in my model?The answer to this question is available to LEEDuser premium members. Start a free trial » (If you're already a premium member, log in here.) |
What does it cost?
Cost estimates for this credit
On each BD+C v4 credit, LEEDuser offers the wisdom of a team of architects, engineers, cost estimators, and LEED experts with hundreds of LEED projects between then. They analyzed the sustainable design strategies associated with each LEED credit, but also to assign actual costs to those strategies.
Our tab contains overall cost guidance, notes on what “soft costs” to expect, and a strategy-by-strategy breakdown of what to consider and what it might cost, in percentage premiums, actual costs, or both.
This information is also available in a full PDF download in The Cost of LEED v4 report.
Learn more about The Cost of LEED v4 »For full access, sign up now for LEEDuser Premium
Already a premium member? Log in now
Checklists
Step by step to LEED certification
LEEDuser’s checklists walk you through the key action steps you need to earn a credit, including how to avoid common pitfalls and save money.
For full access, sign up now for LEEDuser Premium
Already a premium member? Log in now
Documentation toolkit
The motherlode of cheat sheets
LEEDuser’s Documentation Toolkit is loaded with calculators to help assess credit compliance, tracking spreadsheets for materials, sample templates to help guide your narratives and LEED Online submissions, and examples of actual submissions from certified LEED projects for you to check your work against. To get your plaque, start with the right toolkit.
For full access, sign up now for LEEDuser Premium
Already a premium member? Log in now
LEEDuser overview
Frank advice from LEED experts
LEED is changing all the time, and every project is unique. Even seasoned professionals can miss a critical detail and lose a credit or even a prerequisite at the last minute. Our expert advice guides our LEEDuser Premium members and saves you valuable time.
For full access, sign up now for LEEDuser Premium
Already a premium member? Log in now
Credit language
© Copyright U.S. Green Building Council, Inc. All rights reserved.
Intent
To connect building occupants with the outdoors, reinforce circadian rhythms, and reduce the use of electrical lighting by introducing daylight into the space.Requirements
Provide manual or automatic (with manual override) glare-control devices for all regularly occupied spaces. Select one of the following three options.Option 1. Simulation: Spatial Daylight Autonomy (2–3 points)
Demonstrate through annual computer simulations that spatial daylight autonomy300/50% (sDA300/50%) of at least 55%, 75%, or 90% is achieved. Use regularly occupied floor area. Points are awarded according to Table 1.Table 1. Points for daylit floor area: Spatial daylight autonomy
CI, CI Retail, CI Hospitality |
|
|---|---|
sDA (for regularly occupied floor area) |
Points |
55% |
2 |
75% |
3 |
Option 2. Simulation: Illuminance Calculations (1–2 points)
Demonstrate through computer modeling that illuminance levels will be between 300 lux and 3,000 lux for 9 a.m. and 3 p.m., both on a clear-sky day at the equinox, for the floor area indicated in Table 2. Use regularly occupied floor area.Table 2. Points for daylit floor area: Illuminance calculation
CI, CI Retail, CI Hospitality |
|
|---|---|
Percentage of regularly occupied floor area |
Points |
75% |
1 |
90% |
2 |
- Use typical meteorological year data, or an equivalent, for the nearest available weather station.
- Select one day within 15 days of September 21 and one day within 15 days of March 21 that represent the clearest sky condition.
- Use the average of the hourly value for the two selected days. Exclude blinds or shades from the model. Include any permanent interior obstructions and movable furniture and partitions.
- Measure at appropriate work plane height during any hour between 9 a.m. and 3 p.m.
- Take one measurement in any regularly occupied month, and take a second as indicated in Table 4.
- For spaces larger than 150 square feet (14 square meters), take measurements on a maximum 10 foot (3 meter) square grid.
- For spaces 150 square feet (14 square meters) or smaller, take measurements on a maximum 3 foot (900 millimeters) square grid.
Option 3. Measurement (2-3 points, 1-2 points Healthcare)
Achieve illuminance levels between 300 lux and 3,000 lux for the floor area indicated in Table 3.Table 3. Points for daylit floor area: Measurement
NC, CS, Schools, Retail, Data Centers, Warehouses & Distribution Centers, Hospitality, CI |
Healthcare |
||
|---|---|---|---|
Percentage of regularly occupied floor area |
Points |
Percentage of perimeter floor area |
Points |
75 |
2 |
75 |
1 |
90 |
3 |
90 |
2 |
Table 4. Timing of measurements for illuminance
If first measurement is taken in … |
take second measurement in … |
|---|---|
January |
May-September |
February |
June-October |
March |
June-July, November-December |
April |
August-December |
May |
September-January |
June |
October-February |
July |
November-March |
August |
December-April |
September |
December-January, May-June |
October |
February-June |
November |
March-July |
December |
April-August |
Frequently asked questions
What types of glare control are acceptable for this credit?The answer to this question is available to LEEDuser premium members. Start a free trial » (If you're already a premium member, log in here.) |
Do I actually need to submit the USGBC Daylight and Quality Views calculator?The answer to this question is available to LEEDuser premium members. Start a free trial » (If you're already a premium member, log in here.) |
Is it possible to combine Options 1 and 2 for different spaces in the same building?The answer to this question is available to LEEDuser premium members. Start a free trial » (If you're already a premium member, log in here.) |
Can electrochromic glazing qualify as a glare control device?The answer to this question is available to LEEDuser premium members. Start a free trial » (If you're already a premium member, log in here.) |
What spaces are considered regularly occupied and must be included in the calculations?The answer to this question is available to LEEDuser premium members. Start a free trial » (If you're already a premium member, log in here.) |
Can I use Revit to document this credit?The answer to this question is available to LEEDuser premium members. Start a free trial » (If you're already a premium member, log in here.) |
If I’m pursuing Option 2 or 3, can I average the compliant square footage between 9 a.m. and 3 p.m. for a space and use the average as the compliant square footage?The answer to this question is available to LEEDuser premium members. Start a free trial » (If you're already a premium member, log in here.) |
What daylight simulation software can I use for LEED compliance?The answer to this question is available to LEEDuser premium members. Start a free trial » (If you're already a premium member, log in here.) |
Can I mix and match daylight analysis methods? What if one room meets the illuminance thresholds but not the ASE limit?The answer to this question is available to LEEDuser premium members. Start a free trial » (If you're already a premium member, log in here.) |
My office space will have cubicles with high partitions. Should I include those in my model?The answer to this question is available to LEEDuser premium members. Start a free trial » (If you're already a premium member, log in here.) |
Documentation toolkit
The motherlode of cheat sheets
LEEDuser’s Documentation Toolkit is loaded with calculators to help assess credit compliance, tracking spreadsheets for materials, sample templates to help guide your narratives and LEED Online submissions, and examples of actual submissions from certified LEED projects for you to check your work against. To get your plaque, start with the right toolkit.
For full access, sign up now for LEEDuser Premium
Already a premium member? Log in now
Frequently asked questions
What types of glare control are acceptable for this credit?The answer to this question is available to LEEDuser premium members. Start a free trial » (If you're already a premium member, log in here.) |
Do I actually need to submit the USGBC Daylight and Quality Views calculator?The answer to this question is available to LEEDuser premium members. Start a free trial » (If you're already a premium member, log in here.) |
Is it possible to combine Options 1 and 2 for different spaces in the same building?The answer to this question is available to LEEDuser premium members. Start a free trial » (If you're already a premium member, log in here.) |
Can electrochromic glazing qualify as a glare control device?The answer to this question is available to LEEDuser premium members. Start a free trial » (If you're already a premium member, log in here.) |
What spaces are considered regularly occupied and must be included in the calculations?The answer to this question is available to LEEDuser premium members. Start a free trial » (If you're already a premium member, log in here.) |
Can I use Revit to document this credit?The answer to this question is available to LEEDuser premium members. Start a free trial » (If you're already a premium member, log in here.) |
If I’m pursuing Option 2 or 3, can I average the compliant square footage between 9 a.m. and 3 p.m. for a space and use the average as the compliant square footage?The answer to this question is available to LEEDuser premium members. Start a free trial » (If you're already a premium member, log in here.) |
What daylight simulation software can I use for LEED compliance?The answer to this question is available to LEEDuser premium members. Start a free trial » (If you're already a premium member, log in here.) |
Can I mix and match daylight analysis methods? What if one room meets the illuminance thresholds but not the ASE limit?The answer to this question is available to LEEDuser premium members. Start a free trial » (If you're already a premium member, log in here.) |
My office space will have cubicles with high partitions. Should I include those in my model?The answer to this question is available to LEEDuser premium members. Start a free trial » (If you're already a premium member, log in here.) |