Intent

To conserve existing natural areas, enhance biodiversity, restore damaged areas, and provide thriving habitats for local wildlife.

Requirements

Option 1. Preserve and Restore Habitat (1–2 points)
PATH 1. GREENFIELD SITES (1 POINT)
Preserve 40% of the greenfield area on the site by protecting these areas from all development and construction activity. 

OR

PATH 2. PREVIOUSLY DISTURBED SITES (1–2 POINTS)
Meet the requirements of Path 1. Greenfield Sites, if such areas exist.

AND

Restore previously disturbed areas of the site (if such areas exist) and follow the soil restoration and vegetation restoration requirements below. Dedicated athletic fields that are solely for athletic use are exempt from counting toward the total site area. These areas may not count toward the protected greenfield or restored habitat areas.

Points are awarded according to Table 1.

Table 1. Points for Percentage of Area Restored 

Restored Area

Zero Lot Line

Points

20% of previously disturbed area

10%

1

40% of previously disturbed area

20%

2

Soil restoration
Restore all on-site soils disturbed by previous development and soils disturbed by current construction activities that will serve as a final vegetated area. Any imported soils must be reused in a way comparable to their original function and may not include the following:

  • Soils defined regionally by the NRCS web soil survey (or local equivalent for projects outside the U.S.) as prime farmland, unique farmland, or farmland of statewide or local importance.
  • Soils from other greenfield sites.
  • Sphagnum peat moss or organic amendments that contain sphagnum peat.

Engineered growing medium for vegetated roofs are exempt from the soil restoration requirements.

Vegetation restoration
Plant native and adapted vegetation that is not currently listed as invasive and includes the following:

  • At least 10 species that are native or adapted to the project’s EPA Level III ecoregion (or local equivalent for projects outside of the U.S.).
  • Minimum of two of the following categories: trees, shrubs, and ground cover. Zero lot line projects are exempt from this requirement.
  • At least 110 square feet (10 square meters) consisting of native flowering plants appropriate for local pollinators. Plants must be in groupings of at least 10 square feet (one square meter). Designate the pollinator habitat area with signage.

AND/OR

Option 2. Bird-Friendly Glass (1 point)
Glass used below specified heights on the exterior of the building and site must have a maximum threat factor of 30, as defined in the American Bird Conservancy’s Threat Factor Database.

This applies to all glass, including spandrel glass, when located

  • From grade up to 50 feet (15 meters) measured at all points.
  • Up to 20 feet (six meters) measured from the finished grade of a green roof. 
  • At any distance from grade or roof for glass in guardrails and windshields.
See all forum discussions about this credit »

Frequently asked questions

No results found
See all forum discussions about this credit »

What does it cost?

Cost estimates for this credit

On each BD+C v4 credit, LEEDuser offers the wisdom of a team of architects, engineers, cost estimators, and LEED experts with hundreds of LEED projects between then. They analyzed the sustainable design strategies associated with each LEED credit, but also to assign actual costs to those strategies.

Our tab contains overall cost guidance, notes on what “soft costs” to expect, and a strategy-by-strategy breakdown of what to consider and what it might cost, in percentage premiums, actual costs, or both.

This information is also available in a full PDF download in The Cost of LEED v4 report.

Learn more about The Cost of LEED v4 »

For full access, sign up now for LEEDuser Premium

Already a premium member? Log in now

Checklists

Step by step to LEED certification

LEEDuser’s checklists walk you through the key action steps you need to earn a credit, including how to avoid common pitfalls and save money.

For full access, sign up now for LEEDuser Premium

Already a premium member? Log in now

Documentation toolkit

The motherlode of cheat sheets

LEEDuser’s Documentation Toolkit is loaded with calculators to help assess credit compliance, tracking spreadsheets for materials, sample templates to help guide your narratives and LEED Online submissions, and examples of actual submissions from certified LEED projects for you to check your work against. To get your plaque, start with the right toolkit.

For full access, sign up now for LEEDuser Premium

Already a premium member? Log in now


Addenda

This credit has no LEEDuser summary

See all forum discussions about this credit »

Credit language

USGBC logo

© Copyright U.S. Green Building Council, Inc. All rights reserved.

Intent

To conserve existing natural areas, enhance biodiversity, restore damaged areas, and provide thriving habitats for local wildlife.

Requirements

Option 1. Preserve and Restore Habitat (1–2 points)
PATH 1. GREENFIELD SITES (1 POINT)
Preserve 40% of the greenfield area on the site by protecting these areas from all development and construction activity. 

OR

PATH 2. PREVIOUSLY DISTURBED SITES (1–2 POINTS)
Meet the requirements of Path 1. Greenfield Sites, if such areas exist.

AND

Restore previously disturbed areas of the site (if such areas exist) and follow the soil restoration and vegetation restoration requirements below. Dedicated athletic fields that are solely for athletic use are exempt from counting toward the total site area. These areas may not count toward the protected greenfield or restored habitat areas.

Points are awarded according to Table 1.

Table 1. Points for Percentage of Area Restored 

Restored Area

Zero Lot Line

Points

20% of previously disturbed area

10%

1

40% of previously disturbed area

20%

2

Soil restoration
Restore all on-site soils disturbed by previous development and soils disturbed by current construction activities that will serve as a final vegetated area. Any imported soils must be reused in a way comparable to their original function and may not include the following:

  • Soils defined regionally by the NRCS web soil survey (or local equivalent for projects outside the U.S.) as prime farmland, unique farmland, or farmland of statewide or local importance.
  • Soils from other greenfield sites.
  • Sphagnum peat moss or organic amendments that contain sphagnum peat.

Engineered growing medium for vegetated roofs are exempt from the soil restoration requirements.

Vegetation restoration
Plant native and adapted vegetation that is not currently listed as invasive and includes the following:

  • At least 10 species that are native or adapted to the project’s EPA Level III ecoregion (or local equivalent for projects outside of the U.S.).
  • Minimum of two of the following categories: trees, shrubs, and ground cover. Zero lot line projects are exempt from this requirement.
  • At least 110 square feet (10 square meters) consisting of native flowering plants appropriate for local pollinators. Plants must be in groupings of at least 10 square feet (one square meter). Designate the pollinator habitat area with signage.

AND/OR

Option 2. Bird-Friendly Glass (1 point)
Glass used below specified heights on the exterior of the building and site must have a maximum threat factor of 30, as defined in the American Bird Conservancy’s Threat Factor Database.

This applies to all glass, including spandrel glass, when located

  • From grade up to 50 feet (15 meters) measured at all points.
  • Up to 20 feet (six meters) measured from the finished grade of a green roof. 
  • At any distance from grade or roof for glass in guardrails and windshields.