Schools-2009 SSc6.2: Stormwater Design—Quality Control
LEEDuser overview
Frank advice from LEED experts
LEED is changing all the time, and every project is unique. Even seasoned professionals can miss a critical detail and lose a credit or even a prerequisite at the last minute. Our expert advice guides our LEEDuser Premium members and saves you valuable time.
For full access, sign up now for LEEDuser Premium
Already a premium member? Log in now
Credit language
© Copyright U.S. Green Building Council, Inc. All rights reserved.
Requirements
Implement a stormwater management plan that reduces impervious cover, promotes infiltration and captures and treats the stormwater runoff from 90% of the average annual rainfall1 using acceptable best management practices (BMPs). BMPs used to treat runoff must be capable of removing 80% of the average annual postdevelopment total suspended solids (TSS) load based on existing monitoring reports. BMPs are considered to meet these criteria if:
- They are designed in accordance with standards and specifications from a state or local program that has adopted these performance standards.
- There exists infield performance monitoring data demonstrating compliance with the criteria. Data must conform to accepted protocol (e.g., Technology Acceptance Reciprocity Partnership [TARP], Washington State Department of Ecology) for BMP monitoring.
SITES-LEED Equivalency
This LEED credit (or a component of this credit) has been established as equivalent to a SITES v2 credit or component. For more information on using the equivalency as a substitution in your LEED or SITES project, see this article and guidance document.Frequently asked questions
Why do the requirements focus on 1-year and 2-year, 24-hour storms?The answer to this question is available to LEEDuser premium members. Start a free trial » (If you're already a premium member, log in here.) |
The calculations for this credit are always a headache! While our projects are usually awarded the credit, the equations in the LEED Reference Guide are helpful mostly for sizing a reservoir or cistern, but don't help you get to the final results. Does USThe answer to this question is available to LEEDuser premium members. Start a free trial » (If you're already a premium member, log in here.) |
Why include the 1-year storm in the credit requirements? Won't management practices for the 2-year storm be effective?The answer to this question is available to LEEDuser premium members. Start a free trial » (If you're already a premium member, log in here.) |
How can green roofs count as a stormwater control measure?The answer to this question is available to LEEDuser premium members. Start a free trial » (If you're already a premium member, log in here.) |
How can I achieve compliance if my project's stormwater control measures are outside the LEED project boundary?The answer to this question is available to LEEDuser premium members. Start a free trial » (If you're already a premium member, log in here.) |
I have 100-year data—how do I convert to 2-year?The answer to this question is available to LEEDuser premium members. Start a free trial » (If you're already a premium member, log in here.) |
Is it an acceptable strategy to capture the rainwater into tanks and discharge it into the public sewers after the rainstorm reducing the peak discharge?The answer to this question is available to LEEDuser premium members. Start a free trial » (If you're already a premium member, log in here.) |
Are there special considerations for international projects?The answer to this question is available to LEEDuser premium members. Start a free trial » (If you're already a premium member, log in here.) |
What performance threshold do I need to achieve for an Exemplary Performance point?The answer to this question is available to LEEDuser premium members. Start a free trial » (If you're already a premium member, log in here.) |
What does it cost?
Cost estimates for this credit
On each BD+C v4 credit, LEEDuser offers the wisdom of a team of architects, engineers, cost estimators, and LEED experts with hundreds of LEED projects between then. They analyzed the sustainable design strategies associated with each LEED credit, but also to assign actual costs to those strategies.
Our tab contains overall cost guidance, notes on what “soft costs” to expect, and a strategy-by-strategy breakdown of what to consider and what it might cost, in percentage premiums, actual costs, or both.
This information is also available in a full PDF download in The Cost of LEED v4 report.
Learn more about The Cost of LEED v4 »For full access, sign up now for LEEDuser Premium
Already a premium member? Log in now
Checklists
Step by step to LEED certification
LEEDuser’s checklists walk you through the key action steps you need to earn a credit, including how to avoid common pitfalls and save money.
For full access, sign up now for LEEDuser Premium
Already a premium member? Log in now
Documentation toolkit
The motherlode of cheat sheets
LEEDuser’s Documentation Toolkit is loaded with calculators to help assess credit compliance, tracking spreadsheets for materials, sample templates to help guide your narratives and LEED Online submissions, and examples of actual submissions from certified LEED projects for you to check your work against. To get your plaque, start with the right toolkit.
For full access, sign up now for LEEDuser Premium
Already a premium member? Log in now
LEEDuser overview
Frank advice from LEED experts
LEED is changing all the time, and every project is unique. Even seasoned professionals can miss a critical detail and lose a credit or even a prerequisite at the last minute. Our expert advice guides our LEEDuser Premium members and saves you valuable time.
For full access, sign up now for LEEDuser Premium
Already a premium member? Log in now
Credit language
© Copyright U.S. Green Building Council, Inc. All rights reserved.
Requirements
Implement a stormwater management plan that reduces impervious cover, promotes infiltration and captures and treats the stormwater runoff from 90% of the average annual rainfall1 using acceptable best management practices (BMPs). BMPs used to treat runoff must be capable of removing 80% of the average annual postdevelopment total suspended solids (TSS) load based on existing monitoring reports. BMPs are considered to meet these criteria if:
- They are designed in accordance with standards and specifications from a state or local program that has adopted these performance standards.
- There exists infield performance monitoring data demonstrating compliance with the criteria. Data must conform to accepted protocol (e.g., Technology Acceptance Reciprocity Partnership [TARP], Washington State Department of Ecology) for BMP monitoring.
SITES-LEED Equivalency
This LEED credit (or a component of this credit) has been established as equivalent to a SITES v2 credit or component. For more information on using the equivalency as a substitution in your LEED or SITES project, see this article and guidance document.Documentation toolkit
The motherlode of cheat sheets
LEEDuser’s Documentation Toolkit is loaded with calculators to help assess credit compliance, tracking spreadsheets for materials, sample templates to help guide your narratives and LEED Online submissions, and examples of actual submissions from certified LEED projects for you to check your work against. To get your plaque, start with the right toolkit.
For full access, sign up now for LEEDuser Premium
Already a premium member? Log in now
Frequently asked questions
Why do the requirements focus on 1-year and 2-year, 24-hour storms?The answer to this question is available to LEEDuser premium members. Start a free trial » (If you're already a premium member, log in here.) |
The calculations for this credit are always a headache! While our projects are usually awarded the credit, the equations in the LEED Reference Guide are helpful mostly for sizing a reservoir or cistern, but don't help you get to the final results. Does USThe answer to this question is available to LEEDuser premium members. Start a free trial » (If you're already a premium member, log in here.) |
Why include the 1-year storm in the credit requirements? Won't management practices for the 2-year storm be effective?The answer to this question is available to LEEDuser premium members. Start a free trial » (If you're already a premium member, log in here.) |
How can green roofs count as a stormwater control measure?The answer to this question is available to LEEDuser premium members. Start a free trial » (If you're already a premium member, log in here.) |
How can I achieve compliance if my project's stormwater control measures are outside the LEED project boundary?The answer to this question is available to LEEDuser premium members. Start a free trial » (If you're already a premium member, log in here.) |
I have 100-year data—how do I convert to 2-year?The answer to this question is available to LEEDuser premium members. Start a free trial » (If you're already a premium member, log in here.) |
Is it an acceptable strategy to capture the rainwater into tanks and discharge it into the public sewers after the rainstorm reducing the peak discharge?The answer to this question is available to LEEDuser premium members. Start a free trial » (If you're already a premium member, log in here.) |
Are there special considerations for international projects?The answer to this question is available to LEEDuser premium members. Start a free trial » (If you're already a premium member, log in here.) |
What performance threshold do I need to achieve for an Exemplary Performance point?The answer to this question is available to LEEDuser premium members. Start a free trial » (If you're already a premium member, log in here.) |