Commissioning on C&S building not complete because of push back
CS-2009 EAp1:Fundamental Commissioning of Building Energy Systemsposted by Edgar Arevalo on
My team is having an issue with the mechanical contractor who installed lab exhaust fans in the buildings. The commissioning agent was suppose to test those fans but the mechanical contractor
Commissioning of existing equipment not in scope?
CS-2009 EAp1:Fundamental Commissioning of Building Energy Systemsposted by Brian Salazar on
Hi all! We received feedback from the LEED review team on Cx that I had not seen before. We have a Core & Shell building where the exisitng Domestic Hot Water heater was retained.
C+S Building removing HVAC scope
CS-2009 EAp1:Fundamental Commissioning of Building Energy Systemsposted by Karina Hanyzewski on
Hi there!
Tenant area commissioning
CS-2009 EAp1:Fundamental Commissioning of Building Energy Systemsposted by sompoche sirichote on
Our project is an office building with 10 floors on the top are leased out as a hotel tenant and we are seeking for LEED CS certified. If the mechanical and electrical plant of the hotel are separa
Commissioning Agent Experience Template Form
CS-2009 EAp1:Fundamental Commissioning of Building Energy Systemsposted by nalat yulong on
The commissioning agent for our project indicated there is a LEED template he has completed in the past documenting his experience as an agent on similar projects and detailing his certifications.
Cx coordination with tenant move in
CS-2009 EAp1:Fundamental Commissioning of Building Energy Systemsposted by Matt Humphreys on
What impact will the following two situations have on earning the fundamental commissioning prerequisite? 1.
Commissioning existing energy systes
CS-2009 EAp1:Fundamental Commissioning of Building Energy Systemsposted by Ken Dooley on
We have building renovation that is refurbishing 80% of a building aiming for CS 2009.
LEED NC - Tenant Commissioning
CS-2009 EAp1:Fundamental Commissioning of Building Energy Systemsposted by Jennifer Preston on
Our base building will be fully commissioning, but the small first floor tenant fit out is not in the scope of the project, beyond providing base building systems.
Cx and contractors
CS-2009 EAp1:Fundamental Commissioning of Building Energy Systemsposted by Jean-Baptiste Noel on
Hi all, Our current project is a Design & Build, for which the MEP contractors are required to hire a third party to commission their systems (so each MEP will probably have a different compan