Ready Mix Concrete
CS-2009 MRc5:Regional Materialsposted by Ann E on
Hi,
Regarding the mentioned subject, is there/ what papers/certification is needed to submit by the RMC Supplier regarding LEED?
Thank you.
MR Calculator incorrect?
CS-2009 MRc5:Regional Materialsposted by Reid Middlebrooks on
It appears that the BDC Material and Resource Calculator (July 2012) provided under the credit resources incorrectly calculates the Regional Material percentage.
Racking system in warehouse
CS-2009 MRc5:Regional Materialsposted by Jean-Baptiste Noel on
In a C&S warehouse project, I was wondering whether the racking system could be counted in the materials list (as long as put consistently in all MR credits of course)? I am not including the f
Whose invoice is necesary?
CS-2009 MRc5:Regional Materialsposted by Michael E. Edmonds-Bauer on
We have a situation with a contractor and a manufacturer. There is one manufacturer of steel bars in Mexico. This manufacturer is selling steel bars to our "soil stabilization contractor". Becau
Regional- Additives Taken into Consideration?
CS-2009 MRc5:Regional Materialsposted by Roberto Meza on
I have a question regarding the Regional Materials Credit: If a product has the following components: - Cement (local product) - Sand (local product) - Additives (imported) Will this product comp
Concrete Formwork
CS-2009 MRc5:Regional Materialsposted by Mike Zupan on
Should I include temporary materials, such as concrete formwork and shoring, in the documentation for MRc5? Thanks!
Materials - Core & Shell
CS-2009 MRc5:Regional Materialsposted by Joaquim Lima on
Good morning! my project is classified as Core & Shell, I wonder if the calculations for credit 5 (Materials and Resources) should consider only the materials used in the common areas of the
Invoices
CS-2009 MRc5:Regional Materialsposted by Michael E. Edmonds-Bauer on
I would like to know how we must prove GBCI about materials cost. We are requesting our contractor to provide the following for steel rebars: 1.
MR5
CS-2009 MRc5:Regional Materialsposted by Christine Castellano on
Steel sub listed 76.60% of raw materials extracted within 500 miles of project, the data he provided for back-up lists 5 different locations where the raw material was extracted but manufacturer ca
Core and Shell Scope & Tenant Scope
CS-2009 MRc5:Regional Materialsposted by Osama Hassan on
Hi, Project is registered on Core & Shell rating System CS V2.0. When i was working on Regional Material Credit MRc5, I found two Options.