New LEED project inside an already certified LEED Project

Healthcare-v2009 MPR3:Must use a reasonable site boundary
posted by  Husam Haron  on 

An office building was constructed and awarded LEED Silver. Now, a new building is being planned to be constructed inside the LEED project boundary of the the already certified LEED project.

3
Default Avatar
LEED AP
ABUD Engineering Ltd.
LEEDuser Basic Member
34 thumbs up
Tue Sep 15, 2020, 2:45 pm

LEED Basement Boundary

Healthcare-v2009 MPR3:Must use a reasonable site boundary
posted by  Patrice McVeigh  on 

Hi, I am working on a project with 3 towers over a shared 2-storey basement. Each tower is being certified separately.

2
Representative
Vermont House of Representatives
LEEDuser Expert
7780 thumbs up
Wed Mar 4, 2020, 10:47 am

Reasonable Boundary - other support builidngs beyond project

Healthcare-v2009 MPR3:Must use a reasonable site boundary
posted by  Nicole Kimoto  on 

We have a hangar project with an admin building attached all new construction. Does the boundary only need to include the construction that will do with the hangar/admin only?

2
Representative
Vermont House of Representatives
LEEDuser Expert
7780 thumbs up
Wed Feb 14, 2018, 10:18 am

Existing MultiFamily High Rise-Exclude Occupied Commerical Space

Healthcare-v2009 MPR3:Must use a reasonable site boundary
posted by  Laura Steinbrink  on 

We have an existing 13 Story Downtown Multifamily LEED NC v2009 registered project consisting of 210,000 sf and 200 units which will be gutted.

1
Tue Mar 7, 2023, 4:30 pm

Project Boundary 2 buildings on site but only 1 certification

Healthcare-v2009 MPR3:Must use a reasonable site boundary
posted by  Elke Malleier  on 

Hi experts, I would appreciate your advice on the follwoing, please. I am unsure to draw the project boundary in situation described below: - Entire project site (including dormitory building) wil

1
Thu Mar 21, 2013, 2:27 pm

LPB for a Residential Building Excluding the Shopping Mall

Healthcare-v2009 MPR3:Must use a reasonable site boundary
posted by  Orçun Özhelvaci  on 

Dear experts, I would like to hear about your comments on the following issue: In one of our projects, a residential building is being constructed on top of a shopping mall both of which are constr

1
Tue Nov 5, 2013, 4:40 pm

Land disturbed vs. land supporting normal building operation

Healthcare-v2009 MPR3:Must use a reasonable site boundary
posted by  Michelle Bombeck  on 

This question has been asked many times and I'm wondering if anyone has some more recent experience with a submittal.

1
Thu Jul 9, 2015, 7:45 pm

Site Boundary Including Other Structures

Healthcare-v2009 MPR3:Must use a reasonable site boundary
posted by  Vicki Rybl  on 

We are certifying a ~30K sf building that shares its site (legal parcel) with a large 8 story garage.

1
Tue Jan 17, 2017, 9:43 pm

College campus LEED boundary

Healthcare-v2009 MPR3:Must use a reasonable site boundary
posted by  Jason Roberdeau  on 

We are working on a new residence hall which is located between two existing (non-certified) residence halls on a college campus.

1
Tue Nov 5, 2013, 4:27 pm

Required Vegetated Area and LEED Boundary Calculations

Healthcare-v2009 MPR3:Must use a reasonable site boundary
posted by  CT G  on 

Hello, We have a project with the following site constraints: The LEED Project Boundary includes 2 new buildings: an office tower, and a small bank building.

0