New LEED project inside an already certified LEED Project
Healthcare-v2009 MPR3:Must use a reasonable site boundaryposted by Husam Haron on
An office building was constructed and awarded LEED Silver. Now, a new building is being planned to be constructed inside the LEED project boundary of the the already certified LEED project.
LEED Basement Boundary
Healthcare-v2009 MPR3:Must use a reasonable site boundaryposted by Patrice McVeigh on
Hi, I am working on a project with 3 towers over a shared 2-storey basement. Each tower is being certified separately.
Reasonable Boundary - other support builidngs beyond project
Healthcare-v2009 MPR3:Must use a reasonable site boundaryposted by Nicole Kimoto on
We have a hangar project with an admin building attached all new construction. Does the boundary only need to include the construction that will do with the hangar/admin only?
Existing MultiFamily High Rise-Exclude Occupied Commerical Space
Healthcare-v2009 MPR3:Must use a reasonable site boundaryposted by Laura Steinbrink on
We have an existing 13 Story Downtown Multifamily LEED NC v2009 registered project consisting of 210,000 sf and 200 units which will be gutted.
Project Boundary 2 buildings on site but only 1 certification
Healthcare-v2009 MPR3:Must use a reasonable site boundaryposted by Elke Malleier on
Hi experts, I would appreciate your advice on the follwoing, please. I am unsure to draw the project boundary in situation described below: - Entire project site (including dormitory building) wil
LPB for a Residential Building Excluding the Shopping Mall
Healthcare-v2009 MPR3:Must use a reasonable site boundaryposted by Orçun Özhelvaci on
Dear experts, I would like to hear about your comments on the following issue: In one of our projects, a residential building is being constructed on top of a shopping mall both of which are constr
Land disturbed vs. land supporting normal building operation
Healthcare-v2009 MPR3:Must use a reasonable site boundaryposted by Michelle Bombeck on
This question has been asked many times and I'm wondering if anyone has some more recent experience with a submittal.
Site Boundary Including Other Structures
Healthcare-v2009 MPR3:Must use a reasonable site boundaryposted by Vicki Rybl on
We are certifying a ~30K sf building that shares its site (legal parcel) with a large 8 story garage.
College campus LEED boundary
Healthcare-v2009 MPR3:Must use a reasonable site boundaryposted by Jason Roberdeau on
We are working on a new residence hall which is located between two existing (non-certified) residence halls on a college campus.
Required Vegetated Area and LEED Boundary Calculations
Healthcare-v2009 MPR3:Must use a reasonable site boundaryposted by CT G on
Hello, We have a project with the following site constraints: The LEED Project Boundary includes 2 new buildings: an office tower, and a small bank building.