Forum quick links
Soil testing
EBOM-v4 SSc5:Site managementposted by Kath Williams on
This credit states that soil testing is required but the whole purpose is to determine appropriate fertilizer use.
Option 3: Determining HC and NOx emissions
EBOM-v4 SSc5:Site managementposted by Michelle Raigosa on
Although an Equipment Emissions Reduction Calculator is provided, how do we address maintenance vehicles used on site?
Monitoring and Inspection of Irrigation System
EBOM-v4 SSc5:Site managementposted by RYAN BEN SABILALA on
For SS Credit Site Management, the performance requirement says: "Monitor irrigation systems manually or with automated systems AT LEAST EVERY TWO WEEKS during the operating season and correct any
Approved Deicers
EBOM-v4 SSc5:Site managementposted by Stephanie Donovan on
Hi Sam, I've been looking at deicers appropriate for this credit.
Option 1: Limited Turf Area
EBOM-v4 SSc5:Site managementposted by Stephanie Donovan on
Hello - the site I'm looking at already has under 25% turf area. In fact it has no turf, only vegetation.
Required Documentation: All Projects for Site Management credit
EBOM-v4 SSc5:Site managementposted by JOHN COOK on
Hello, Is there an example of an acceptable "air quality protection log" that USGBC is looking for in this credit?
Glisofat
EBOM-v4 SSc5:Site managementposted by Emmanuel Pauwels on
There are contradictory studies related to the use of glisofat as a herbicide. Would spraying with a mixture containing 30% glifosat be an aceptable practice?
What are the baseline conditions?
EBOM-v4 SSc5:Site managementposted by Zachary Hayes on
This says we have to reduce from the baseline, which I assume is our initial reported use. However, if this is the case how can there be any reduction?
Zero lot line
EBOM-v4 SSc5:Site managementposted by Lawrence Lile on
Can a zero lot line building achieve this credit?