NC-v4 LTc3: High priority site as ACP

NC-2009 SSc3:Brownfield Redevelopment
posted by  Heather Appell  on 

Has anyone tried to pursue LEEDv4 LT High Priority Site as an alternative compliance path for SSc3 Brownfield Redevelopment?

1
Tue Jul 23, 2019, 11:42 pm

Remediation done by previous owner as part of purchase agreement

NC-2009 SSc3:Brownfield Redevelopment
posted by     on 

If the building owner purchased the building with the remediation done as part of the purchase agreement by the prior owner can they still receive this credit?

1
Thu May 23, 2019, 11:11 am

ASTM E1903-97 Phase II Environmental Site Assessment - Local Equivalent documentation

NC-2009 SSc3:Brownfield Redevelopment
posted by  Adrie Fourie  on 

We are involved with a project outside of the US that undertook a site assessment as part of a legal requirement to decommission a filling station previously operated on site.

0

Asbestos Abatement Requirement Compliance

NC-2009 SSc3:Brownfield Redevelopment
posted by  UO Design and Construction  on 

We always conduct asbestos surveys (assessments) in accordance with the LRAPA regulations Title 43.

1
Wed Mar 9, 2016, 3:58 pm

SSc3 Brownfield Documentation

NC-2009 SSc3:Brownfield Redevelopment
posted by  Josh Mauldin  on 

Our project is the renovation of an existing building from 1955. No Phase II ESA was done, but we hired an environmental consultant to do an asbestos and lead paint survey.

1
Tue Apr 12, 2011, 5:58 am

Project found old diesel tank

NC-2009 SSc3:Brownfield Redevelopment
posted by  Tanja Arnesson  on 

Hi, At the commencement of excavation work the project discovered an old diesel tank that had leaked. This meant that some of the soil was contaminated with diesel.

1
Thu Oct 20, 2011, 11:36 am

Building that Meets Requirements but ALSO has Lead Paint

NC-2009 SSc3:Brownfield Redevelopment
posted by  Sara Zoumbaris  on 

Has anyone come across a building that meets the credit requirements for SSc3 but also has Lead paint, of which the owner has chosen to paint over instead of remove (which is legally ok in the stat

1
Wed Aug 20, 2014, 6:21 pm

Asbestos documentation

NC-2009 SSc3:Brownfield Redevelopment
posted by  Lisa Sawin  on 

Our project site has two buildings that will be demolished to erect our project. Through testing that is compliant with NESHAPS standards it has been determined that both buildings have asbestos.

1
Sat Jul 14, 2012, 11:07 am

Contaimination found,but remediation not required per site class

NC-2009 SSc3:Brownfield Redevelopment
posted by  Erin Holdenried  on 

I have a project where some mercury contamination was found, but not enough to require remediation for the intended use as an industrial site. I assume that in order to achieve this credit some so

1
Wed Feb 20, 2013, 5:54 pm

Brownfield Documentation

NC-2009 SSc3:Brownfield Redevelopment
posted by  Ivan Romero  on 

I've scanned the discussions on Brownfield and didn't see this addressed directly.

1
Thu Aug 20, 2015, 9:12 pm