NC-2009 SSc3:Brownfield Redevelopmentposted by Heather Appell on
Has anyone tried to pursue LEEDv4 LT High Priority Site as an alternative compliance path for SSc3 Brownfield Redevelopment?
Remediation done by previous owner as part of purchase agreement
NC-2009 SSc3:Brownfield Redevelopmentposted by on
If the building owner purchased the building with the remediation done as part of the purchase agreement by the prior owner can they still receive this credit?
ASTM E1903-97 Phase II Environmental Site Assessment - Local Equivalent documentation
NC-2009 SSc3:Brownfield Redevelopmentposted by Adrie Fourie on
We are involved with a project outside of the US that undertook a site assessment as part of a legal requirement to decommission a filling station previously operated on site.
Asbestos Abatement Requirement Compliance
NC-2009 SSc3:Brownfield Redevelopmentposted by UO Design and Construction on
We always conduct asbestos surveys (assessments) in accordance with the LRAPA regulations Title 43.
SSc3 Brownfield Documentation
NC-2009 SSc3:Brownfield Redevelopmentposted by Josh Mauldin on
Our project is the renovation of an existing building from 1955. No Phase II ESA was done, but we hired an environmental consultant to do an asbestos and lead paint survey.
Project found old diesel tank
NC-2009 SSc3:Brownfield Redevelopmentposted by Tanja Arnesson on
Hi, At the commencement of excavation work the project discovered an old diesel tank that had leaked. This meant that some of the soil was contaminated with diesel.
Building that Meets Requirements but ALSO has Lead Paint
NC-2009 SSc3:Brownfield Redevelopmentposted by Sara Zoumbaris on
Has anyone come across a building that meets the credit requirements for SSc3 but also has Lead paint, of which the owner has chosen to paint over instead of remove (which is legally ok in the stat
Asbestos documentation
NC-2009 SSc3:Brownfield Redevelopmentposted by Lisa Sawin on
Our project site has two buildings that will be demolished to erect our project. Through testing that is compliant with NESHAPS standards it has been determined that both buildings have asbestos.
Contaimination found,but remediation not required per site class
NC-2009 SSc3:Brownfield Redevelopmentposted by Erin Holdenried on
I have a project where some mercury contamination was found, but not enough to require remediation for the intended use as an industrial site. I assume that in order to achieve this credit some so
Brownfield Documentation
NC-2009 SSc3:Brownfield Redevelopmentposted by Ivan Romero on
I've scanned the discussions on Brownfield and didn't see this addressed directly.