Permeable Paving - "vegetated open space"

NC-2009 SSc5.2:Site Development—Maximize Open Space
posted by  Lauren Sparandara  on 

If our permeable paving has grass growing through it could that count as both hardscape for SSc7.1 and for vegetated open space in SSc5.2?

6
Default Avatar
LEED BD+C O+M
Carde Ten Architects
LEEDuser Basic Member
74 thumbs up
Wed Jun 26, 2024, 2:13 am

Trellis in Vegetated Area

NC-2009 SSc5.2:Site Development—Maximize Open Space
posted by  Summer   on 

I'm working on a project with an open space and vegetated area compliant to the credit requirement.

0

SSc5.2: Case 1 or Case 3?

NC-2009 SSc5.2:Site Development—Maximize Open Space
posted by  Elliot Powers, LEED AP BD+C  on 

Greetings from Taiwan! Our project is located in a science park that does have requirements for "open space" and "green space," which would indicate that we employ Case 1 to achieve this credit.

2
Representative
Vermont House of Representatives
LEEDuser Expert
7780 thumbs up
Wed Nov 22, 2017, 1:58 am

zoning requirement SSc5.2

NC-2009 SSc5.2:Site Development—Maximize Open Space
posted by  Kathleen Burke  on 

Our project is located in a small, tight suburban lot.

3
Default Avatar
LEED BD+C O+M
Carde Ten Architects
LEEDuser Basic Member
74 thumbs up
Wed Nov 22, 2017, 1:58 am

Is the bottom of the basin allowed in Open Space Calculations?

NC-2009 SSc5.2:Site Development—Maximize Open Space
posted by  Candice Rogers  on 

Hello - We have two landscaped detention basins on our site. Their slopes are vegetated, but exceed the 1:4 ratio.

1
Thu Mar 6, 2014, 7:38 pm

Building footprint

NC-2009 SSc5.2:Site Development—Maximize Open Space
posted by  Febin Mohamed  on 

We are doing a campus approach for our project.

1
Tue Jan 17, 2017, 10:46 pm
1
Mon Oct 4, 2010, 2:59 pm

Roof Terraces and Balconies

NC-2009 SSc5.2:Site Development—Maximize Open Space
posted by  Catalina A  on 

We are certifying a Hotel Project earning credit SSc2.

1
Fri Oct 21, 2011, 11:02 pm

Credit achievement requirement clarification

NC-2009 SSc5.2:Site Development—Maximize Open Space
posted by  BABAR MEHMOOD  on 

The building has 2 roof levels, upper roof with the mechanical eqipements and the lower roof which has direct to the medical clinical floor (2nd floor).