Post a question or comment
Credit Filters
Increased Ventilation
Filter by location
Forum
Topic
Replies
Recent

How to Claim Credits for Natural Ventilation in Multifamily High

NC-2009 IEQc2:Increased Ventilation
posted by  zhao yongqing  on 

What is the methodology for LEED projects to claim credits (if possible?) for natural ventilation in dwelling units?

1
Mon Nov 4, 2013, 1:58 am

WinAir Software to Meet Requirement

NC-2009 IEQc2:Increased Ventilation
posted by  Roberto Meza  on 

Has anyone used the WinAir from the Ecotect software to meet the credit requirements or does anyone know if this software can be used? Thanks!

0

LEED v3 (2009) EAc1 & IEQc2 Outdoor Air - baseline vs. proposed

NC-2009 IEQc2:Increased Ventilation
posted by  Todd Tewksbury  on 

Hi, When modeling the increased outdoor air venitlaiton per IEQc2 in the proposed and baseline buildings in EAc1 for LEED CS v3 (2009), should the baseline and proposed buildings have the same outd

1
Fri Jun 16, 2017, 7:33 am
1
Mon Dec 20, 2010, 2:44 pm

simulation program for natural ventilation

NC-2009 IEQc2:Increased Ventilation
posted by  Adam Targowski  on 

Is there any list of programs which can be used to demonstrate compliance with IEQ Cre 2 Option 2. Do you know if DesignBuilder can be used to show appropriate airflow rates?

1
Tue Aug 13, 2013, 6:01 pm

Alternative Compliance path for international projects

NC-2009 IEQc2:Increased Ventilation
posted by  Susann Geithner  on 

The USGBC has published a draft for additional guidance for international projects. That includes alternative compliance paths and even additional LEED online forms for international projects.

0

IEQc2

NC-2009 IEQc2:Increased Ventilation
posted by  Jimmy Sparkman  on 

I know the intent of IEQc2 is to increase the comfort level of the occupant among other things, but I'm also trying to reduce my outside air from ASHRAE 62.1-2007 levels via demand control ventilat

1
Sun Apr 5, 2015, 6:59 am

IEQp1 link to IEQc2 problem

NC-2009 IEQc2:Increased Ventilation
posted by  Manuel Martin Delgado  on 

After filling the sample form IEQp1 table IEQp1-4 and press calculate I get a Y (yes) in both compliance with IEQ prerequisite 1 and credit 2.

0
1
Mon Aug 2, 2010, 4:51 pm

VRP Compliance Calculator (Case 2, Option 2) for Natural Vent?

NC-2009 IEQc2:Increased Ventilation
posted by  Lauren Wierzbowski, PE  on 

I have a 4-story dorm building where each dorm complies with paragraph 5.1 of ASHRAE 62.1-2007.

1
Wed Jul 17, 2013, 9:15 pm