Forum quick links
Can help in earning low VOC credit?
NC-2009 IEQc3.1:Construction IAQ Management Plan—During Constructionposted by Anushka Singh on
If we follow all the SMACA guidelines strictly, is it possible to earn the low VOC credit as well ?
IEQc3.1 Required information
NC-2009 IEQc3.1:Construction IAQ Management Plan—During Constructionposted by Victoria Rios Esteve on
Hi everyone!
I´m pretty new at LEED certification process, so I will really appreciate your help.
Filtration Media MERV 9
NC-2009 IEQc3.1:Construction IAQ Management Plan—During Constructionposted by Celimar Fournier on
Is filtration media MERV 9 allowed during construction? This is in addition to the MERV 8 filters for the AHU's.
Year of SMACNA sited in IAQ plan older than the one listsed in LLT
NC-2009 IEQc3.1:Construction IAQ Management Plan—During Constructionposted by Chad Thurlow on
Hello
Porous materials fully enclosed building?
NC-2009 IEQc3.1:Construction IAQ Management Plan—During Constructionposted by Summer Minchew on
I have seen IAQ specifications that state "Do not load or install drywall, other porous materials and components, and items with high organic content into partially enclosed building." Is this a re
IAQ management plan-during construction or before occupancy
NC-2009 IEQc3.1:Construction IAQ Management Plan—During Constructionposted by Kali Wolin on
I am wondering if you can obtain the credit for Construction IAQ management plan DURING CONSTRUCTION along with BEFORE OCCUPANCY or if it is just one credit or the other.
additional covers at return air grilles
NC-2009 IEQc3.1:Construction IAQ Management Plan—During Constructionposted by Iris Amdur on
In anticipation for a large dust kick-up during finish installation, our project is looking into placing an additional cloth filter on the return air grilles (in addition to the MERV 8 filter).
Washable filters
NC-2009 IEQc3.1:Construction IAQ Management Plan—During Constructionposted by Noriko Nagazumi on
Is the "replace all filtration media immediately prior to occupancy" required for washable filters as well? Thanks in advance
smoke leakage test for duct
NC-2009 IEQc3.1:Construction IAQ Management Plan—During Constructionposted by Abdulla Anwar on
Our MEP sub-contractor need to clarify if we can use an smoke capsule for duct leakage test, prior to final air leakage test since the project specs is giving a small allowable 1% from basis of des