Forum quick links
Energy Performance Periode
EBOM-2009 EAc1:Optimize Energy Performanceposted by Leandro Silva on
Dear all,
Good afternoon.
Case 2 Option 2C
EBOM-2009 EAc1:Optimize Energy Performanceposted by Patrick Cellie on
I am working with a convention center that is currently Silver certified under the v2009 EBOM rating system.
Portfolio Manager - All Requests Suspended for Energy Star Scores Until Early 2019
EBOM-2009 EAc1:Optimize Energy Performanceposted by Michelle Bracewell-Musson on
I will assume most are aware that Portfolio Manager has suspended applications for Energy Star Certification from September 2018 until early 2019. As a requirement for EAc1 to be earned,
LEED EBOM EA1 PR2 - Casino Hotels
EBOM-2009 EAc1:Optimize Energy Performanceposted by Aron Weis on
If a 6,000,000 square foot hotel/casino is more than 50% hotel space, are they required to use Option 1 - Portfolio Manager to get an Energy Star rating?
Method Choosing
EBOM-2009 EAc1:Optimize Energy Performanceposted by Austin Evans on
This is an industrial manufacturing facility, and we have filed our data online with Energy Star as Other-Other.
Energy Performance Period - ATC Operation & Programing Problems
EBOM-2009 EAc1:Optimize Energy Performanceposted by James Doyle on
On an upcoming LEED EBOM project approaching the performance we have had lots of problems with the exclusive ATC contractor (a major international company) correcting control and programing problem
Not Eligible for ENERGY STAR rating- Case 2 option 1 calculator
EBOM-2009 EAc1:Optimize Energy Performanceposted by gwenedd murray on
Our project is below 5,000sf which makes it automatically not eligible for an ENERGY STAR rating. There are two distinct space types, office + K-12 classroom.
Certifying a single Building within a Complex - energy metering
EBOM-2009 EAc1:Optimize Energy Performanceposted by Peter Gibney on
I have a query with respect to our Building and an aceptable level of energy metering. The building under certification is one of several buildings however has common heating and cooling production