Commercial Kitchen equipment commissioning

EBOM-2009 EAc2.1:Existing Building Commissioning—Investigation and Analysis
posted by  Patrick Cellie  on 

I am working with a convention center currently certified Silver in the v2009 EBOM rating system. The owners are monitoring data with the goal to re-certify when the time comes.

3
Default Avatar
Sustainability Consultant
AECOM
LEEDuser Basic Member
0 thumbs up
Wed Jan 16, 2019, 4:09 pm

Upgrades

EBOM-2009 EAc2.1:Existing Building Commissioning—Investigation and Analysis
posted by  Andres Giraldo  on 

Hi, If I did a narrative description about the HVAC at the begining of LEED project (PIf4), but know we have done some updates because of the level 1 audit, so do I need to change the HVAC narrativ

1
Wed Mar 26, 2014, 4:36 pm
1
Wed May 19, 2010, 11:23 pm

Timing

EBOM-2009 EAc2.1:Existing Building Commissioning—Investigation and Analysis
posted by  Jessica Bruscato  on 

I am pursuing certification for an existing convention center that is connected to a hotel. The hotel has a central plant that serves the convention center.

1
Mon Dec 5, 2011, 12:36 pm

External Commissioning/Engineering Agent

EBOM-2009 EAc2.1:Existing Building Commissioning—Investigation and Analysis
posted by  Peter Gibney  on 

Wanted some clarification on which(if any) credits/pre-requisites under the EBOM manual required an external engineer or commissioning agent to perform the tasks described.

1
Fri Aug 2, 2013, 4:12 pm

Breakdown of energy use

EBOM-2009 EAc2.1:Existing Building Commissioning—Investigation and Analysis
posted by  Gustavo De las Heras Izquierdo  on 

It is required by the credit: "to document the breakdown of energy use in the building". Is it mandatory to have permanent energy meters by end use in order to meet this requirement? What other m

1
Tue Mar 25, 2014, 6:05 pm

Use of C&S Commissioning documentation

EBOM-2009 EAc2.1:Existing Building Commissioning—Investigation and Analysis
posted by  Izabela Kwiecinska  on 

Hi Everyone, We are working on a building that already got LEED C&S certificate in 2012 and now aims to get EBOM.

1
Fri Feb 10, 2017, 8:56 pm

Level II audit

EBOM-2009 EAc2.1:Existing Building Commissioning—Investigation and Analysis
posted by  Robert Calloway  on 

If you go the Level II route (in lieu of RCx), does uploading a level II audit for the level I audit suffice?

1
Fri Feb 22, 2013, 9:44 pm

Am i required to do the Level I first

EBOM-2009 EAc2.1:Existing Building Commissioning—Investigation and Analysis
posted by  Chris Callas  on 

We are looking to do this in-house, we can document the study and record the findings. but as part of this credit do i need to show i performed the Level I first?

1
Wed Mar 5, 2014, 5:09 pm

Minimum number of equipments to be audited

EBOM-2009 EAc2.1:Existing Building Commissioning—Investigation and Analysis
posted by  ESD Singapore  on 

Hi all, The project that we are working on would like to go pursue this credit using ASHRAE level 2 commissioning audit path. However, this project has a large quantity of AHUs and FCUs (approx.

1