Commercial Kitchen equipment commissioning
EBOM-2009 EAc2.1:Existing Building Commissioning—Investigation and Analysisposted by Patrick Cellie on
I am working with a convention center currently certified Silver in the v2009 EBOM rating system. The owners are monitoring data with the goal to re-certify when the time comes.
Upgrades
EBOM-2009 EAc2.1:Existing Building Commissioning—Investigation and Analysisposted by Andres Giraldo on
Hi, If I did a narrative description about the HVAC at the begining of LEED project (PIf4), but know we have done some updates because of the level 1 audit, so do I need to change the HVAC narrativ
Timing
EBOM-2009 EAc2.1:Existing Building Commissioning—Investigation and Analysisposted by Jessica Bruscato on
I am pursuing certification for an existing convention center that is connected to a hotel. The hotel has a central plant that serves the convention center.
External Commissioning/Engineering Agent
EBOM-2009 EAc2.1:Existing Building Commissioning—Investigation and Analysisposted by Peter Gibney on
Wanted some clarification on which(if any) credits/pre-requisites under the EBOM manual required an external engineer or commissioning agent to perform the tasks described.
Breakdown of energy use
EBOM-2009 EAc2.1:Existing Building Commissioning—Investigation and Analysisposted by Gustavo De las Heras Izquierdo on
It is required by the credit: "to document the breakdown of energy use in the building". Is it mandatory to have permanent energy meters by end use in order to meet this requirement? What other m
Use of C&S Commissioning documentation
EBOM-2009 EAc2.1:Existing Building Commissioning—Investigation and Analysisposted by Izabela Kwiecinska on
Hi Everyone, We are working on a building that already got LEED C&S certificate in 2012 and now aims to get EBOM.
Level II audit
EBOM-2009 EAc2.1:Existing Building Commissioning—Investigation and Analysisposted by Robert Calloway on
If you go the Level II route (in lieu of RCx), does uploading a level II audit for the level I audit suffice?
Am i required to do the Level I first
EBOM-2009 EAc2.1:Existing Building Commissioning—Investigation and Analysisposted by Chris Callas on
We are looking to do this in-house, we can document the study and record the findings. but as part of this credit do i need to show i performed the Level I first?
Minimum number of equipments to be audited
EBOM-2009 EAc2.1:Existing Building Commissioning—Investigation and Analysisposted by ESD Singapore on
Hi all, The project that we are working on would like to go pursue this credit using ASHRAE level 2 commissioning audit path. However, this project has a large quantity of AHUs and FCUs (approx.