Farm on Roof
CI-2009 SSc1:Site Selectionposted by Kristopher Croghan on
Our client currently has no landscape to maintain on site as this is a city office building. However, a roof farm is being considered.
SSc1 Path 12: EV Charging Stations
CI-2009 SSc1:Site Selectionposted by Alaina Ladner on
How many EV charging stations are required to be provided to achieve this credit?
Path 6
CI-2009 SSc1:Site Selectionposted by Nelina Loiselle on
Does anyone have a sample of a sequence of operations narrative? I am not sure what they'd like to see.
Path 4
CI-2009 SSc1:Site Selectionposted by Mike D on
Can the project achieve Path4 if there are no parking spaces within the building. The project is a zero lot line as well. Thanks!
Reopening one path of LEED-CI SSc1.2 in Construction Review
CI-2009 SSc1:Site Selectionposted by Susan Di Giulio on
In preliminary design review, we had attempted the Brownfields point, which is an option in SSc1.2.1, as well as 4 other points in that credit.
Exemplary Performance
CI-2009 SSc1:Site Selectionposted by Méabh Browne on
Apologies if this has already been addressed, but I'm confused about how this works - if my project has already got 5 points in other Paths in this credit, can I get an additional (6th) point for e
Sustainable Site Regional Priority Credit
CI-2009 SSc1:Site Selectionposted by Dana Hodges on
I am working on a project in a region where the regional priority credits include SSC1 paths, C, E, G, H, and L, but do NOT include path A - selecting a LEED certified building.
SSc1 Option 1 and Regional Priority Credit
CI-2009 SSc1:Site Selectionposted by Graciela Kessler on
I just received the Review Report for one of our project. We documented SSc1 option 1 LEED certified Building.
Path 6 - Light Pollution Reduction
CI-2009 SSc1:Site Selectionposted by Erin Holdenried on
Does this path apply to only the spaces within the scope of work/LEED project, or the whole building the LEED project is located in?