Farm on Roof

CI-2009 SSc1:Site Selection
posted by  Kristopher Croghan  on 

Our client currently has no landscape to maintain on site as this is a city office building. However, a roof farm is being considered.

0

SSc1 Path 12: EV Charging Stations

CI-2009 SSc1:Site Selection
posted by  Alaina Ladner  on 

How many EV charging stations are required to be provided to achieve this credit?

2
Representative
Vermont House of Representatives
LEEDuser Expert
7780 thumbs up
Mon Sep 11, 2017, 9:42 pm

Path 6

CI-2009 SSc1:Site Selection
posted by  Nelina Loiselle  on 

Does anyone have a sample of a sequence of operations narrative? I am not sure what they'd like to see.

1
Thu Jul 5, 2012, 3:49 pm

Path 4

CI-2009 SSc1:Site Selection
posted by  Mike D  on 

Can the project achieve Path4 if there are no parking spaces within the building. The project is a zero lot line as well. Thanks!

1
Mon Nov 4, 2013, 4:02 pm

Reopening one path of LEED-CI SSc1.2 in Construction Review

CI-2009 SSc1:Site Selection
posted by  Susan Di Giulio  on 

In preliminary design review, we had attempted the Brownfields point, which is an option in SSc1.2.1, as well as 4 other points in that credit.

1
Tue Jan 12, 2016, 3:32 pm
1
Sat Nov 13, 2010, 3:42 am

Exemplary Performance

CI-2009 SSc1:Site Selection
posted by  Méabh Browne  on 

Apologies if this has already been addressed, but I'm confused about how this works - if my project has already got 5 points in other Paths in this credit, can I get an additional (6th) point for e

1
Tue Sep 20, 2011, 5:46 pm

Sustainable Site Regional Priority Credit

CI-2009 SSc1:Site Selection
posted by  Dana Hodges  on 

I am working on a project in a region where the regional priority credits include SSC1 paths, C, E, G, H, and L, but do NOT include path A - selecting a LEED certified building.

1
Wed Aug 22, 2012, 1:53 pm

SSc1 Option 1 and Regional Priority Credit

CI-2009 SSc1:Site Selection
posted by  Graciela Kessler  on 

I just received the Review Report for one of our project. We documented SSc1 option 1 LEED certified Building.

1
Mon Apr 21, 2014, 2:52 pm

Path 6 - Light Pollution Reduction

CI-2009 SSc1:Site Selection
posted by  Erin Holdenried  on 

Does this path apply to only the spaces within the scope of work/LEED project, or the whole building the LEED project is located in?

1
Fri Feb 3, 2017, 3:09 pm