Library: number of spaces and type of markings for Car/Vanpool or Fuel Efficient Vehicles
CI-2009 SSc3.3:Alternative Transportation—Parking Availabilityposted by Fletcher Bruegger on
We are rennovating the interior only of a public library, no new parking is being added as part of this project, however, we are hoping to qualify for the 3.3 credits. Two questions:
LEED CI parking for company vehicles
CI-2009 SSc3.3:Alternative Transportation—Parking Availabilityposted by Natalie Ng on
The project would like to look into Case 1 option 1. The tenant included carparking spaces into the lease.
Preferred parking spaces
CI-2009 SSc3.3:Alternative Transportation—Parking Availabilityposted by Emmanuel Pauwels on
We are certifying a tenant space with LEED CI in a building that was previously CS certified. The CS building has preferred parking spaces for electrical vehicles.
Zoning Minimum parking requirements
CI-2009 SSc3.3:Alternative Transportation—Parking Availabilityposted by Jessica Miller on
My office is moving to a mixed use space so we will be SSc3 case 1, less than 75% of the building.
Dormitory and Car/Van Pool Parking
CI-2009 SSc3.3:Alternative Transportation—Parking Availabilityposted by Andrew Lengel on
We are renovating the interiors of two existing dormitories on a college campus. Per LEED-CI SSc3.3 we fall under Case 2. We are not providing any new parking.
No local zonal regulation
CI-2009 SSc3.3:Alternative Transportation—Parking Availabilityposted by Steve Khouw on
The project planned to have active vanpooling commuting, parking is provided by the LL, 5% of FTE dedicated for that purposes as per credit requirement.
Case 2
CI-2009 SSc3.3:Alternative Transportation—Parking Availabilityposted by Mike D on
The project has 2500 FTE and occupies more than 75% of the building space. The building has only 5 parking spaces, so cannot meet the 5% required for the carpool/vanpool.
LEED CI - S.S. credit 3.3 - Case 1 - Option 2
CI-2009 SSc3.3:Alternative Transportation—Parking Availabilityposted by Sheela I on
Our project area is less than 75% of the total building area - as we are one of the tenants in 25 floor building. So i guess the project would qualify under Case1 - Option 2.