Submetering requeriments for exclusive chiller for tenant space

CI-2009 EAc3:Measurement and Verification
posted by  Maria Isabel Conde  on 

The project is located within a building, its area is less than 75% of the total area of the building. The project has a chiller plant that only supplies the project area.

1
Fri Dec 15, 2017, 3:21 pm
1
Mon Nov 21, 2011, 8:53 pm
1
Tue Nov 16, 2010, 5:00 pm

Process Loads Description

CI-2009 EAc3:Measurement and Verification
posted by  Saju Varghese  on 

Im trying to find out what would be considered process loads to be metere separately, is there a definition from LEED?

1
Thu Apr 18, 2013, 10:38 pm

Energy Cost broken out in Lease

CI-2009 EAc3:Measurement and Verification
posted by  Sadie Martin  on 

Hi, we are working on getting the verbiage of the lease correct.

1
Fri Nov 28, 2014, 9:44 pm

ACP using v4 language

CI-2009 EAc3:Measurement and Verification
posted by  Brightworks Sustainability  on 

LI #10418 allows LEED-NC v2009 projects to meeting the M&V credit by meeting LEED v4 enhanced commissioning, monitoring-based commissioning, and the advanced energy metering credit.

1
Wed Oct 5, 2016, 6:40 pm

compressed air

CI-2009 EAc3:Measurement and Verification
posted by  Adrienn Gelesz  on 

I have a manufacturing plant extension CI project were compressed air is entering the LEED space from the non-CI parts of the building. (

1
Fri Sep 13, 2013, 8:55 pm

To meter or not to meter

CI-2009 EAc3:Measurement and Verification
posted by  Rudolph Carneiro  on 

I have a store (case 1) with a small 60 ton chiller, 2 AHU's, lighting, and plug loads. If HVAC, plug loads, and lighting can be measured on one meter, how many meters do I need?

1
Mon Nov 26, 2012, 4:45 pm

Metering

posted by  John Bauer  on 
1
Tue Jun 22, 2010, 11:04 pm

BTU Metering for Existing HVAC

CI-2009 EAc3:Measurement and Verification
posted by  Jareb Ketay  on 

I have a tenant renovation project occupying 1 story of an existing 10 story building (

1
Tue Sep 23, 2014, 7:13 pm