Tristan,
Refering to my
CI-2009 MRc2:Construction Waste Management
posted by Greengrade User on
Tristan, Refering to my comment below, the only thing I can think of right now is to seperate the demo process into two parts.
Documentation
CI-2009 MRc2:Construction Waste Managementposted by Jose Ng on
We have planned to give the excess material to workers. How can we document it? Best, J.Ng
Plaster Recycling
CI-2009 MRc2:Construction Waste Managementposted by Greengrade User on
Hi all, I am working on an interior renovation for a buidling that was built in 1907.
Moving Compost
CI-2009 MRc2:Construction Waste Managementposted by Lawrence Lile on
Soil is generally not allowed to be included in waste diversion calculations. But what if we are moving compost?
Asphalt Roll Roof Recycling
CI-2009 MRc2:Construction Waste Managementposted by Sabrina B on
I am working on a existing building renovation. The existing roof, which will be demo'd, is asphalt roll with batt insulation underneath.
Fluorescent Light Tubes and Donation of Equipment
CI-2009 MRc2:Construction Waste Managementposted by Joseph Sneed on
I have two questions: I would like to confirm that the weight of fluorescent tubes that I recycled are to be added to total weight calculations used for MR2 although they don't weigh much.
Alternative Daily Cover
CI-2009 MRc2:Construction Waste Managementposted by Lawrence Lile on
We are building a maintenance facility at a landfill. It would be very easy to use excavation material as Alternative Daily Cover, as the area that uses this is very close.
CI MRc2 Concrete & Brick
CI-2009 MRc2:Construction Waste Managementposted by Joseph Sneed on
I have a project that has a lot of brick & concrete demolition. This will be used as "clean fill" at a Metrofill site located somewhere else and not taken to a "landfill".
Electronic equipment
CI-2009 MRc2:Construction Waste Managementposted by Agnieszka Rylska on
Should electronic equipment be included in the waste calculations (should we monitor it's weight) or should it be only mentioned in the Construction waste management plan that it's exluded from the
wood
CI-2009 MRc2:Construction Waste Managementposted by Juliana Malho on
Whern you burn a wood that was diverted from landfills, is it considered recycling??