Option 2 IAQ Testing - Schedule
CI-2009 IEQc3.2:Construction IAQ Management Plan—Before Occupancyposted by Anne-Claire BARBERI on
Hello, In the reference guide, it is written that for "Option 2 Air Testing", the test must be conducted after construction ends and within 14 days following occupancy.
flush-out documentation
CI-2009 IEQc3.2:Construction IAQ Management Plan—Before Occupancyposted by Alicja Bieszyńska on
Do we have to document flush-out somehow for the credit compliance? Is any report or declaration needed?
IAQ Testing
CI-2009 IEQc3.2:Construction IAQ Management Plan—Before Occupancyposted by Brett Farbstein on
Can the Owner or GC do the IAQ test themselves ie be responsible for setting the test can and chain of custody to the lab?
Question on Selecting IAQ Test Locations
CI-2009 IEQc3.2:Construction IAQ Management Plan—Before Occupancyposted by Melissa Wrolstad on
I am working on a small ~6,500 sq. ft. LEED-CI office space.
IEQc3.2 VOC Testing
CI-2009 IEQc3.2:Construction IAQ Management Plan—Before Occupancyposted by mark morehouse on
I have a 191,000 sf nc school that will require 11 sample points.
Option 1: Full Flush-out Before Occupancy - Is there a Min. CF?
CI-2009 IEQc3.2:Construction IAQ Management Plan—Before Occupancyposted by Michelle Bracewell-Musson on
With Option 1, Path 1, we are expected to flush-out 14,000 cf/sf of outdoor air at 60 degrees temp. and 60% humidity min. Is there a minimum ventilation rate as with Path 2 which is 0.30 cf/min.?
Is flush out possible in countries with high humidity?
CI-2009 IEQc3.2:Construction IAQ Management Plan—Before Occupancyposted by Katherine Ann Resurreccion on
Hi, we would like to know if flush out is practicable in areas where high humidity is experienced whole year, say 70-85%. Should we cancel out option 1 already and go for option 2 (IAQ testing)?
IAQ Testing AFTER Occupancy?
CI-2009 IEQc3.2:Construction IAQ Management Plan—Before Occupancyposted by buddy pribish on
I am aware of the verbiage in the LEED reference guide for IAQ testing to be completed PRIOR to occupancy, but considering that the flushout method can be completed DURING occupancy, I was wonderin