Janitor Closets in the Base Building

CI-2009 IEQc5:Indoor Chemical and Pollutant Source Control
posted by  Julie Hendricks  on 

We have existing janitor closets in the base building that are on and serve the tenant floors we are building out.

1
Sat Sep 1, 2012, 8:10 pm

Walk-off Mat Width Requirement

CI-2009 IEQc5:Indoor Chemical and Pollutant Source Control
posted by  Itzel Meynard  on 

My project is LEED 2009 commercial interiors. I understand the entryways are required to be 10 feet in the direction of travel inside the building.

1
Wed Oct 5, 2016, 3:07 pm

2 things mat and chemical mixing area

CI-2009 IEQc5:Indoor Chemical and Pollutant Source Control
posted by  Sue Barnett  on 

I have a major building entrance in my LEED boundary as well as some exterior entrances to a courtyard- do I need the mats to the courtyard area too? Then we have restrooms but no janitor closet or

1
Tue Feb 8, 2011, 3:46 am

ID credit Green Cleaning Policy without walk-off mats

CI-2009 IEQc5:Indoor Chemical and Pollutant Source Control
posted by  Rachel Bannon-Godfrey  on 

We have a project that is not achieving IEQc5 as walk-off mats conflict with the operational aspects of the building. Can we still apply for an ID credit for a green cleaning policy?

1
Thu Aug 4, 2016, 10:30 am

Permanent entry way to retail space in a mid-rise multi-family

CI-2009 IEQc5:Indoor Chemical and Pollutant Source Control
posted by  Morteza Kasmaei  on 

This is an eight-story apartment building that is pursuing LEED-NC 2009 and contains future retail spaces in the ground floor.

3
Principal
Climatic Design Inc.
LEEDuser Basic Member
18 thumbs up
Mon Oct 17, 2016, 5:29 pm

Dedicated Exhaust Clarification

CI-2009 IEQc5:Indoor Chemical and Pollutant Source Control
posted by  Alana Spencer  on 

Hello, Could the exhaust of a high-density copy room be achieved via a 100% exhaust base building system?

2
Sun Jul 31, 2016, 7:13 pm

'..with no air recirculation' is for exhaust system or AC system

CI-2009 IEQc5:Indoor Chemical and Pollutant Source Control
posted by  Qiao LIANG  on 

LEED v3 reference guide has mentioned that 'the exhaust rate must be at least 0.5 cfm per square foot, with no air recirculation'..does it mean exhaust system or AC system???

2
Mon Mar 14, 2016, 1:56 pm

Walk off mat length within vestibule

CI-2009 IEQc5:Indoor Chemical and Pollutant Source Control
posted by  Maria Papiez  on 

Have there been any exceptions to the walk-off mat length requirement when vestibules are located at an exterior entry?

2
Founder & Community Director
Metricorps
LEEDuser Expert
7780 thumbs up
Thu Jan 7, 2016, 5:28 pm

Enter way/Filling out the Form

CI-2009 IEQc5:Indoor Chemical and Pollutant Source Control
posted by  Bridgett Weaver  on 

Working on a project that the occupancy of the building is a multi-tenant.

4
Thu Apr 30, 2015, 2:50 pm

Average Pressure Differential - New LEED Online Template

CI-2009 IEQc5:Indoor Chemical and Pollutant Source Control
posted by  Dan Forino  on 

In the new version of the LEED online template for this credit, there is a minimum (with doors closed) and average required pressure differential in Pa.

9
Default Avatar
CDM Smith
LEEDuser Basic Member
1 thumbs up
Tue Feb 11, 2014, 5:25 pm