Forum quick links
Multi-zone system when single AHU supplying OA to FCUs?
CI-2009 IEQp1:Minimum IAQ Performanceposted by Poorva Keskar on
We have 2 AHUs supplying OA to individual FCUs via a separate duct as per ASHRAE 62 intake requirement. The mixing occurs at the individual FCUs and then supplied to the zone.
IEQp1 using indoor packaged DX units
CI-2009 IEQp1:Minimum IAQ Performanceposted by Edgar Arevalo on
I'm in a bit of a funk. I have a office space that populates two floors of a building.
IAQ Procedure is NOT acceptable?
CI-2009 IEQp1:Minimum IAQ Performanceposted by James Keohane on
I recently received a Design Review comment advising that the IAQ procedure included in Chapter 6 of the ASHRAE 62.1-2007 is not an acceptable tool to demonstrate compliance.
Technical Rooms
CI-2009 IEQp1:Minimum IAQ Performanceposted by Juliana Malho on
Does technical rooms, as IDFs rooms needs to have outside air renovation?
outdoor air rate for kitchens
CI-2009 IEQp1:Minimum IAQ Performanceposted by Adam Targowski on
I would like to ask if there's any requirement regarding outdoor air suplly to a kitchen located in an office area? In ASHRAE 62.1-2007 Table 6-1 a kitchen is not mentioned.
Mech. exhaust fan required for a naturally ventilated project?
CI-2009 IEQp1:Minimum IAQ Performanceposted by Ron Dean on
I'm working in a small project with natural ventilation overall. Considering these 3 facts: 1. LEED states to comply with sections 4-7 of ASHRAE 62.1-2007. 2.
Base building system
CI-2009 IEQp1:Minimum IAQ Performanceposted by Graham Langton on
Hi, To what extent does the base building system need to be entered into the VRP calculator?My CI project spaces is carried out space by space but that level of detail for other tenants isn't ava
Project can't meet Outside Air Requirements
CI-2009 IEQp1:Minimum IAQ Performanceposted by Rob Hink on
We have a project which the outdoor air supply is limited from the base building HVAC system (out of our boundary) and we are not sure if the project will be able to meet the ASHRAE 62.1 requiremen
Supporting interior AHU with no outside air supply.
CI-2009 IEQp1:Minimum IAQ Performanceposted by LEED Pro Consultant on
We are working in a project pursuing LEED-CI certification, and some of the base building AHU's were short on supplying air in order to meet the demand of lay-out spaces, so the interior HVAC desig