Open Plan office served by 4 AHUs
CI-2009 IEQp1:Minimum IAQ Performanceposted by Michael Wahjudi on
Hi all, we received comments from reviewer that requesting the system computation should be separated for each system. Our development consists of few meeting rooms and open plan offices.
VRP Compliance Calculator
CI-2009 IEQp1:Minimum IAQ Performanceposted by Juliana Malho on
We have a CI project with multiple zone units and VAV system. We are using template VRP compliance calculator.
Multiple Units - Shared Returns
CI-2009 IEQp1:Minimum IAQ Performanceposted by Mike oliva on
Our design has four Dual Duct VAV units that share common plenum return that is recirculated thru both hot and cold deck of each unit. Each unit has it's own OA intake.
VRV System
CI-2009 IEQp1:Minimum IAQ Performanceposted by SW LEE on
Hi, My project is using VRV system for cooling.
V3 project Minimum Indoor Air Quality Performance Pre-requisite.
CI-2009 IEQp1:Minimum IAQ Performanceposted by sajjad Malik on
I have submitted minimum indoor air quality performance pre-requisite for final design review and reviewer ask me for a narrative but I do not find any option for upload the narrative or any option
Comments received for final design review
CI-2009 IEQp1:Minimum IAQ Performanceposted by monu goyal on
we had received following comments from GBCI for final design review for IEQP1 credit: Revised documentation has been provided including a response narrative, revised Ventilation Rate Procedure (V
Served by part of large air-conditioning system
CI-2009 IEQp1:Minimum IAQ Performanceposted by Shirong Meng on
If the project spaces are served by a large VAV system which has mixing of central Outside air inlet and recirculation air, but the VAV system is also serving other tenant spaces.
Multiple zone vs Single zone
CI-2009 IEQp1:Minimum IAQ Performanceposted by Emmanuel Pauwels on
Hi all, we have a doubt about the system type to use for our project.
Kitchen Supply AHU (For Make Up Air)
CI-2009 IEQp1:Minimum IAQ Performanceposted by Ciaran McCabe on
As part of a fit out I the only tenant AHU is for make up air in a Kitchen 2966.4 CFM Can anyone explain the approach to enter this is in LEED form.