Forum quick links
Base Building ASHRAE 62 Compiance
CI-2009 IEQp1:Minimum IAQ Performanceposted by breeze glazer on
IEQc1 requires confirmation that the building services have been designed in accordance with ASHRAE. A statement from the mechanical engineer is required to demonstrate this.
Louvers for Fresh Air intake
CI-2009 IEQp1:Minimum IAQ Performanceposted by Nandana Kumar on
Hi, For one of the LEED CI project, the developer has provided louvers with motorized dampers in the AHU for fresh air intake. Can the louvers qualify for fresh air intake?
VRV unit with Constant Air Volume system
CI-2009 IEQp1:Minimum IAQ Performanceposted by Srimannarayana NCVK on
Hi We are working on a project where the HVAC system is VRV unit.
Supplementary mechanical ventilation in naturally ventilated
CI-2009 IEQp1:Minimum IAQ Performanceposted by Michael Smithing on
Our project is primarily naturally ventilated and meets the requirements of Section 5.1 in non-core areas.
VRP Calculator
CI-2009 IEQp1:Minimum IAQ Performanceposted by Ciaran McCabe on
We have a central Air Handling Unit supplying 100% outside fresh air to all the rooms in a building, e.g offices, meeting rooms, conference rooms, etc This air will be tempered to say 18 degrees Ce
Online Template Issue - Upload Time Required for IEQp1
CI-2009 IEQp1:Minimum IAQ Performanceposted by Shannon Allison on
I have a technical question about LEED Online and inputting information into the Adobe Form for IEQp1.
RE: IEQ.p1- 62 MZ-ASHRAE Calculator
CI-2009 IEQp1:Minimum IAQ Performanceposted by Bobby Ghataura on
I have a 3 story non-residential building, and VAV's on each floor are served by individual air handling units.
Supplementary ventilation for after-hours
CI-2009 IEQp1:Minimum IAQ Performanceposted by Diana Nezamutinova on
Our project has one primary ventilation system for the entire project space served by the base building AHUs.
IEQp1 LEED Online form what to input?
CI-2009 IEQp1:Minimum IAQ Performanceposted by Kasandra Martin on
For ASHRAE 62.1 do I upload forms for the Baseline of meeting ASHRAE 62.1 and not my forms for IEQc2 Increased Ventilation? Table IEQp1-3.