Post a question or comment
Credit Filters
Minimum IAQ Performance
Filter by location
Forum
Topic
Replies
Recent

Supporting interior AHU with no outside air supply.

CI-2009 IEQp1:Minimum IAQ Performance
posted by  LEED Pro Consultant  on 

We are working in a project pursuing LEED-CI certification, and some of the base building AHU's were short on supplying air in order to meet the demand of lay-out spaces, so the interior HVAC desig

1
Fri Dec 21, 2012, 7:37 pm

ASHRAE 62.1

CI-2009 IEQp1:Minimum IAQ Performance
posted by  Mike D  on 

Clause 5..9 in ASHRAE 62.1 requires MERV 6 filters on all cooling coils or other surfaces. This will very much affect the energy efficiency of the systems.

0

Modification to base building systems

CI-2009 IEQp1:Minimum IAQ Performance
posted by  Ben Hollon  on 

I feel like I've seen parts and pieces of this question in various posts but never asking it directly.

0

System vs. Zone Compliance

CI-2009 IEQp1:Minimum IAQ Performance
posted by  Harvard University Green Building Services  on 

Is it the system or the zone that must comply with the ventilation requirements?

1
Wed Jul 13, 2011, 8:47 pm

Multiple or Single Zone?

CI-2009 IEQp1:Minimum IAQ Performance
posted by  Esteban Martinez  on 

Hello everybody We are working on a CI 2009 Office project with dedicated Fan Coil Units for each space. The FCU are located above the ceiling (inside the plenum).

1
Sun Jul 21, 2013, 4:56 pm

Open Plan office served by 4 AHUs

CI-2009 IEQp1:Minimum IAQ Performance
posted by  Michael Wahjudi  on 

Hi all, we received comments from reviewer that requesting the system computation should be separated for each system. Our development consists of few meeting rooms and open plan offices.

1
Mon Jan 23, 2017, 3:01 pm

VRP Compliance Calculator

CI-2009 IEQp1:Minimum IAQ Performance
posted by  Juliana Malho  on 

We have a CI project with multiple zone units and VAV system. We are using template VRP compliance calculator.

1
Mon Dec 19, 2011, 2:48 pm

Multiple Units - Shared Returns

CI-2009 IEQp1:Minimum IAQ Performance
posted by  Mike oliva  on 

Our design has four Dual Duct VAV units that share common plenum return that is recirculated thru both hot and cold deck of each unit. Each unit has it's own OA intake.

0

VRV System

CI-2009 IEQp1:Minimum IAQ Performance
posted by  SW LEE  on 

Hi, My project is using VRV system for cooling.

1
Sat Jan 25, 2014, 2:23 am

V3 project Minimum Indoor Air Quality Performance Pre-requisite.

CI-2009 IEQp1:Minimum IAQ Performance
posted by  sajjad Malik  on 

I have submitted minimum indoor air quality performance pre-requisite for final design review and reviewer ask me for a narrative but I do not find any option for upload the narrative or any option

1
Thu Jul 20, 2017, 5:28 pm