Forum quick links
Supporting interior AHU with no outside air supply.
CI-2009 IEQp1:Minimum IAQ Performanceposted by LEED Pro Consultant on
We are working in a project pursuing LEED-CI certification, and some of the base building AHU's were short on supplying air in order to meet the demand of lay-out spaces, so the interior HVAC desig
ASHRAE 62.1
CI-2009 IEQp1:Minimum IAQ Performanceposted by Mike D on
Clause 5..9 in ASHRAE 62.1 requires MERV 6 filters on all cooling coils or other surfaces. This will very much affect the energy efficiency of the systems.
Modification to base building systems
CI-2009 IEQp1:Minimum IAQ Performanceposted by Ben Hollon on
I feel like I've seen parts and pieces of this question in various posts but never asking it directly.
System vs. Zone Compliance
CI-2009 IEQp1:Minimum IAQ Performanceposted by Harvard University Green Building Services on
Is it the system or the zone that must comply with the ventilation requirements?
Multiple or Single Zone?
CI-2009 IEQp1:Minimum IAQ Performanceposted by Esteban Martinez on
Hello everybody We are working on a CI 2009 Office project with dedicated Fan Coil Units for each space. The FCU are located above the ceiling (inside the plenum).
Open Plan office served by 4 AHUs
CI-2009 IEQp1:Minimum IAQ Performanceposted by Michael Wahjudi on
Hi all, we received comments from reviewer that requesting the system computation should be separated for each system. Our development consists of few meeting rooms and open plan offices.
VRP Compliance Calculator
CI-2009 IEQp1:Minimum IAQ Performanceposted by Juliana Malho on
We have a CI project with multiple zone units and VAV system. We are using template VRP compliance calculator.
Multiple Units - Shared Returns
CI-2009 IEQp1:Minimum IAQ Performanceposted by Mike oliva on
Our design has four Dual Duct VAV units that share common plenum return that is recirculated thru both hot and cold deck of each unit. Each unit has it's own OA intake.
VRV System
CI-2009 IEQp1:Minimum IAQ Performanceposted by SW LEE on
Hi, My project is using VRV system for cooling.
V3 project Minimum Indoor Air Quality Performance Pre-requisite.
CI-2009 IEQp1:Minimum IAQ Performanceposted by sajjad Malik on
I have submitted minimum indoor air quality performance pre-requisite for final design review and reviewer ask me for a narrative but I do not find any option for upload the narrative or any option