Water Usage for parks and open spaces

CS-2009 WEp1:Water Use Reduction
posted by  Deborah Lucking  on 

Our project is a small pavilion in a park, with tenant space for a food outlet, and (separate) restroom facilities to serve park users.

0

kitchen faucets

CS-2009 WEp1:Water Use Reduction
posted by  Alicja Bieszyńska  on 

We completed the Design Submittal when there was no tenants = no information on their fit-out space. Right now, one of our clients want to include additional tea room with kitchen sink.

1
Wed Sep 19, 2012, 1:34 am

Calculate Button on Form

CS-2009 WEp1:Water Use Reduction
posted by  John Riker  on 

Our MEP has filled in all the information required for WEp1 form, but pressing calculate (on MS Internet Explorer) does not generate any results.

1
Sat Jul 26, 2014, 5:29 am

Cutsheet Translation

CS-2009 WEp1:Water Use Reduction
posted by  Alessio Zampaglione  on 

Our project is In Italy and most of the cutsheets, certifications and declarations that we have are written in Italian and not in English.

1
Sun Sep 2, 2012, 2:07 pm

Minimum implementation of sanitary fixtures

CS-2009 WEp1:Water Use Reduction
posted by  PAULA HIDALGO  on 

Is there a minimum implementation of sanitary fixtures?

1
Fri Mar 22, 2013, 5:21 am

Baseline for Blow-out Fixtures

CS-2009 WEp1:Water Use Reduction
posted by  study topenergy  on 

According to the Water Use Reduction Additional Guidance (April 2013), when selecting the "Blow-out fixture" option, the 3.5 gpf baselne should also be used for the installed case.

1
Mon Nov 30, 2015, 10:53 pm
1
Mon Nov 1, 2010, 11:36 pm

Adjustable valve for WC fixtures

CS-2009 WEp1:Water Use Reduction
posted by  Maya Karkour  on 

Dear all, The project has 2/4 LPF WC fixtures specified, and the water calculations done accordingly. The Contractor is suggesting a WC fixture with a maximum flush rate of 3/6 LPF, but with a regu

1
Tue Feb 21, 2012, 9:48 pm

Partial tenant occupancy with no core water fixtures

CS-2009 WEp1:Water Use Reduction
posted by  Laurent Kanago  on 

I am working on a project where there are no core spaces and all of the fixtures will be provided by the tenants.

0

WEp1 for Multiple Building

CS-2009 WEp1:Water Use Reduction
posted by  Marina Andrade  on 

I´m working on a project that is a campus with 2 warehouses, an administrative building, a large dining room, a little auditorium and a changing room.

1
Mon Nov 4, 2013, 7:19 pm