CS-2009 EAp2:Minimum Energy Performanceposted by Magda Aghababyan on
Hi, We have Core & Shell project while calculating the area of the locations, Pif and EAp2 have difference approximately 4% please let us know what is the maximum percentage deviation. Thank y
Addenda to ASHRAE standards
CS-2009 EAp2:Minimum Energy Performanceposted by Jens Apel on
Edit: question has already been answered in February 2012 here: http://www.leeduser.com/credit/CI-2009/EAp2 Didn't find it before, sorry for any confusion. Dear all, on several spots in the Ref Gu
LEED DESv2, System 8 and Chilled Water Temp Reset
CS-2009 EAp2:Minimum Energy Performanceposted by Matt Humphreys on
For baseline HVAC system #8 modeled with purchased chilled water according to Option 1 of Treatment of District or Campus Thermal Energy in LEED v2 and LEED 2009 guideline, does the Chilled-Water S
Baseline systems for mixed use facility
CS-2009 EAp2:Minimum Energy Performanceposted by Kim Teachout on
We have a mixed use facility that is 34% hotel, 34% office, and 32% parking garage.
Baseline Ventilation
CS-2009 EAp2:Minimum Energy Performanceposted by Toni Herena Montull on
Dear all, our previous version of the baseline model in a C&S building had the same ventilation rates than the proposed.
Mandatory provision 6.4.1.1 Equipment efficiency.
CS-2009 EAp2:Minimum Energy Performanceposted by Sandra Holmström on
I have a question about Mandatory provision 6.4.1.1 Equipment efficiency. Our project is a LEED Core and Shell project and a retail centre, 500 000 foot2.
ASHRAE mandatory provisions
CS-2009 EAp2:Minimum Energy Performanceposted by Anna Korinkova on
I guess that it is a repetitive question but I need to be sure.
Building Area Method Vs Space by Space Method
CS-2009 EAp2:Minimum Energy Performanceposted by Ciaran McCabe on
In terms of the Energy Model for Core & Shell is the "Building Area Method" more applicable as the final layout has not been decide yet ?
AREA CRITERIA
CS-2009 EAp2:Minimum Energy Performanceposted by RICARDO GUEMEZ DIAZ on
HI, I HAVE A PROJECT IN MEXICO CITY, AND THE OWNER DEFINE THE CRITERIA OF DONT USE TREATMENT PLANT AND USE AIR COOLED CHILLERS.