Forum quick links
heat recovery system for base case ?
CS-2009 EAp2:Minimum Energy Performanceposted by shashank jain on
We are modelling our CS case in Sao Paulo (Climate 2A).
Core&Shell Process Load on a Manufacturing Facility
CS-2009 EAp2:Minimum Energy Performanceposted by Lourdes Salinas on
Hi everyone, We have a C&S Major Renovation Manufacturing Facility project. The building is doubling in size and some adjustments will be performed to the envelope of the existing building.
How to calculate Process Energy for CS?
CS-2009 EAp2:Minimum Energy Performanceposted by Tatjana Ernst on
Hi everyone, we have an Core & Shell-Office Building. We are wondering how we have to calculate the process energy.
Tenant build-out
CS-2009 EAp2:Minimum Energy Performanceposted by Marco ZM on
We are in the process of modelling/simulating of office building in LEED C&S 2009 for EAp2 and EAc1 – Option 1. Building is divided into two parts: owner occupied space and offices for rent.
tradable vs. non-tradable
CS-2009 EAp2:Minimum Energy Performanceposted by charles bell on
LEED review for one of our projects states "Ensure that no credit is taken in the Proposed Design Case for lighting reductions on non-tradable surfaces.
Automatic sliding doors in 90.1-2007 and LEED 3.0 Projects
CS-2009 EAp2:Minimum Energy Performanceposted by Paul Deinhofer on
I am working on project whereat a big retail store wants to use automatic sliding doors for their shop entrances.
Density Lighting Exterior
CS-2009 EAp2:Minimum Energy Performanceposted by gabriel Morales on
Hi, we have any questions about the desnsity lighting exterior: 1.- The building is located on a corner in one of the main streets of Mexico City, the architectural design has 23 terraces which wil
Precertification requirements
CS-2009 EAp2:Minimum Energy Performanceposted by František Bartoš on
Hi, is there some document that specifies precertification requirements for EAp2 (eventually for all prerequisites and credits in LEED CS 2009)? Thnaks for advice. Frank
lighting requirements
CS-2009 EAp2:Minimum Energy Performanceposted by Agnieszka Rylska on
And one more thing just to be sure: Does the project need to comply with lighting power allowance requirements of sections 9.5 or 9.6 (ASHRAE 90.1-2007)?
energy costs
CS-2009 EAp2:Minimum Energy Performanceposted by Francesco Passerini on
Sometimes in the energy bills a part of the costs doesn't depend on the energy that is used (e.g.