Shopping center HVAC system - Mall and tenant spaces

CS-2009 EAp2:Minimum Energy Performance
posted by  Luana Bertoletti  on 

Hi, I have a doubt on how to model the baseline HVAC system of a specific shopping center. In this project, it was specified the HVAC system which serves the mall building and some of the stores.

1
Thu Jul 25, 2013, 8:47 pm

Renewable energy system

CS-2009 EAp2:Minimum Energy Performance
posted by  Samuel Sura  on 

Hi LEED Users, I hope it is correct to model renewable energy system only in proposed building as our advantage against baseline. Please coorect me if I'm wrong. Thanks!

1
Mon Feb 29, 2016, 2:53 pm

Process Costs Tables for C&S

CS-2009 EAp2:Minimum Energy Performance
posted by  Maya Karkour  on 

Dear all, I am modeling a C&S project (large shopping mall). For the process loads, I am using: - For the Core Areas: ASHRAE 90.1 User's Manual - Page G32 - Table G-B - For the tenanted area

1
Wed Oct 19, 2011, 2:03 pm

Number of simulation models

CS-2009 EAp2:Minimum Energy Performance
posted by  Lucie Cervena  on 

We are working on an eQuest model of an extensive project that is goinig to be certified as „one building“ with the total gross square footage of 1,670,000 sf.

1
Tue Sep 10, 2013, 1:29 pm

Core Shell Version 2.0

CS-2009 EAp2:Minimum Energy Performance
posted by  Carolina Vergnano  on 

Hello, I would like to know if on the old version, using the energy simulation based on Std.90.1-2004 Appendix G, to comply with the prerequiste the proposed needs at minimum to be equal to the Ba

1
Mon May 21, 2012, 4:51 pm

Brazilian Equivalent Standard

CS-2009 EAp2:Minimum Energy Performance
posted by  Pamela Svetllana Santos Souza  on 

Hello, I'm modelling for LEED C&S 2009. The project has 26 floor type of mixed-use offices.

0

Continuous Insulation

CS-2009 EAp2:Minimum Energy Performance
posted by  Tony Schafer  on 

I am trying to use Table A3.3 to determine the overall wall assembly U-factor. My question is, what materials can be included in the continuous insulation rated R-value that I use?

1
Thu Jul 26, 2012, 3:41 pm

Baseline systems for mixed use facility

CS-2009 EAp2:Minimum Energy Performance
posted by  Kim Teachout  on 

We have a mixed use facility that is 34% hotel, 34% office, and 32% parking garage.

1
Wed Jun 4, 2014, 1:32 pm

Baseline Ventilation

CS-2009 EAp2:Minimum Energy Performance
posted by  Toni Herena Montull  on 

Dear all, our previous version of the baseline model in a C&S building had the same ventilation rates than the proposed.

1
Wed Sep 24, 2014, 6:43 pm

Mandatory provision 6.4.1.1 Equipment efficiency.

CS-2009 EAp2:Minimum Energy Performance
posted by  Sandra Holmström  on 

I have a question about Mandatory provision 6.4.1.1 Equipment efficiency. Our project is a LEED Core and Shell project and a retail centre, 500 000 foot2.

1
Thu Jan 10, 2013, 3:18 pm