Forum quick links
pressure drop adjustemnt in the baseline model
CS-2009 EAp2:Minimum Energy Performanceposted by Agnieszka Rylska on
I have two questiones: 1.
ASHRAE Mandatory Requirement 6.4.3.4.3
CS-2009 EAp2:Minimum Energy Performanceposted by Jorge Torres-Coto on
I have a multi-story building that has one AHU per floor taking OSA from a common vertical shaft.
LeedOnLine Forms Incorrect
CS-2009 EAp2:Minimum Energy Performanceposted by Thomas Newbold on
I am having a problem with LeedOnLine and USGBC hasn't been any help.
Building envelope
CS-2009 EAp2:Minimum Energy Performanceposted by Frantisek Macholda on
Hello, we have a building with irregular shape of facade. The facade consists of horizontal lamellas with vertical gazing - like steps, 3 per each floor.
Air Cooled Chiller Vs Water Cooled Chiller With Dry Air Cooler
CS-2009 EAp2:Minimum Energy Performanceposted by Ciaran McCabe on
Has anyone any feedback in modelling either of these two chillers in a 90.1 Energy model.
Tenant Space / Core & Shell Building
CS-2009 EAp2:Minimum Energy Performanceposted by Katherine Ann Resurreccion on
We are working on CS project, a shopping mall, 57% is major renovation while the other 43% is expansion.
Facade LPD requirement
CS-2009 EAp2:Minimum Energy Performanceposted by Lolita Wu on
As the mandatory provision in ASHRAE 90.1 section 9.4, building facade lighting shall not exceed 0.2W/ft2 for each illuminated surface.
ASHRAE and voltage drop
CS-2009 EAp2:Minimum Energy Performanceposted by BH . on
ASHRAE puts a requirement to keep in electrical services on the feeders max 2% voltage drop and on the branch circuits max 3%.
Simulation: Baseline Chiller Part Load Performance
CS-2009 EAp2:Minimum Energy Performanceposted by Marco Abdallah on
We are pursuing Option 1 (Whole Building Simulation).
how i need to model that to comply with model actual equipment a
CS-2009 EAp2:Minimum Energy Performanceposted by Ron Dean on
There is a fan system that will supply outdoor air for the building, This system is a big injection fan that will supply air to all zones that is completed designed and all the zones that are not c