Shopping center HVAC system - Mall and tenant spaces
CS-2009 EAp2:Minimum Energy Performanceposted by Luana Bertoletti on
Hi, I have a doubt on how to model the baseline HVAC system of a specific shopping center. In this project, it was specified the HVAC system which serves the mall building and some of the stores.
Renewable energy system
CS-2009 EAp2:Minimum Energy Performanceposted by Samuel Sura on
Hi LEED Users, I hope it is correct to model renewable energy system only in proposed building as our advantage against baseline. Please coorect me if I'm wrong. Thanks!
Process Costs Tables for C&S
CS-2009 EAp2:Minimum Energy Performanceposted by Maya Karkour on
Dear all, I am modeling a C&S project (large shopping mall). For the process loads, I am using: - For the Core Areas: ASHRAE 90.1 User's Manual - Page G32 - Table G-B - For the tenanted area
Number of simulation models
CS-2009 EAp2:Minimum Energy Performanceposted by Lucie Cervena on
We are working on an eQuest model of an extensive project that is goinig to be certified as „one building“ with the total gross square footage of 1,670,000 sf.
Core Shell Version 2.0
CS-2009 EAp2:Minimum Energy Performanceposted by Carolina Vergnano on
Hello, I would like to know if on the old version, using the energy simulation based on Std.90.1-2004 Appendix G, to comply with the prerequiste the proposed needs at minimum to be equal to the Ba
Brazilian Equivalent Standard
CS-2009 EAp2:Minimum Energy Performanceposted by Pamela Svetllana Santos Souza on
Hello, I'm modelling for LEED C&S 2009. The project has 26 floor type of mixed-use offices.
Continuous Insulation
CS-2009 EAp2:Minimum Energy Performanceposted by Tony Schafer on
I am trying to use Table A3.3 to determine the overall wall assembly U-factor. My question is, what materials can be included in the continuous insulation rated R-value that I use?
Baseline systems for mixed use facility
CS-2009 EAp2:Minimum Energy Performanceposted by Kim Teachout on
We have a mixed use facility that is 34% hotel, 34% office, and 32% parking garage.
Baseline Ventilation
CS-2009 EAp2:Minimum Energy Performanceposted by Toni Herena Montull on
Dear all, our previous version of the baseline model in a C&S building had the same ventilation rates than the proposed.
Mandatory provision 6.4.1.1 Equipment efficiency.
CS-2009 EAp2:Minimum Energy Performanceposted by Sandra Holmström on
I have a question about Mandatory provision 6.4.1.1 Equipment efficiency. Our project is a LEED Core and Shell project and a retail centre, 500 000 foot2.