Campus Site Lignting Calcs - again, sorry
CS-2009 EAp2:Minimum Energy Performanceposted by charles bell on
We submitted (on Jan 23, 2014) the question below. Unfortunately, since then my email has crashed and I have lost the response. Is there any way this can be recovered?
Mandatory provision 6.4.3.2 Setpoint Overlap Restriction
CS-2009 EAp2:Minimum Energy Performanceposted by Sandra Holmström on
Mandatory provision 6.4.3.2 Setpoint Overlap Restriction When heating and cooling to a zone is controlled by separate thermostatic controls shall heating setpoint exceed cooling setpoint. In our C&
Tenant agreement to exclude PFP boxes
CS-2009 EAp2:Minimum Energy Performanceposted by Rathnashree Bharadwaj on
In our project location, it is clear that no tenants will go for a heating system. The base building is also designed for cooling only.
Energy Modeling for a Group Certification
CS-2009 EAp2:Minimum Energy Performanceposted by Susan Di Giulio on
We are working on an open-air shopping mall with 6 buildings arranged around a main "street". Some are attached and some aren't.
U-factor for existing masonry wall
CS-2009 EAp2:Minimum Energy Performanceposted by Morteza Kasmaei on
Hello All In this LEED_CS project, the existing masonry wall was changed to the following configuration (from outside to inside): - glass-fiber-reinforced concrete panels [TAKTL] on galvanized st
Ashrae 90.1 - Tradable Surfaces
CS-2009 EAp2:Minimum Energy Performanceposted by Angela Saggin on
Hi! We have some canopies in our project, but one of these canopies is 5w over-lighted. It's our understanding that we can make it up by under-lighting other tradable surface.
Must the space for the Systems 9 and 10 be heated?
CS-2009 EAp2:Minimum Energy Performanceposted by tiantian zhou on
Dear sir/madam, For the area of mechanical ventilation, the actual design has no heating but ventilation.
COP - Future tenants - Energy Efficiency Simulation
CS-2009 EAp2:Minimum Energy Performanceposted by Marcio Alberto Casado Pereira on
Hi, It is possible to demand a future COP to comply with for future tenants and consider this value for the simulation (Eap2)? Thanks in advance.
Can I use CONTROL as an energy saving strategy??
CS-2009 EAp2:Minimum Energy Performanceposted by Esteban Undurraga on
Dear all: We have an specific question related to the Whole Building Simulation of an office Building. The electricity distribution company established a maximum limit of energy use for the buil
Applicable Cooling source in Propose case - LEED Group - v4 C&S
CS-2009 EAp2:Minimum Energy Performanceposted by Ashraf Ali Khan Khan on
I am modelling for LEED GROUP - v4 BD+C: CS. Project has 40 Office buildings shared with same basement and served with multiple Water Cooled Chillers as cooling source.