Post a question or comment
Credit Filters
Minimum Energy Performance
Filter by location
Forum
Topic
Replies
Recent

Sort chiller heat pump in ASHRAE 90.1-2007

CS-2009 EAp2:Minimum Energy Performance
posted by  Diego Escalona  on 

Hello all, I'm participating in a project of a building of 20 floors of offices, of which the first corresponds to shops and entrance hall.

1
Tue Aug 14, 2012, 9:18 pm

Occupancy Sensors for 'Back of House' space

CS-2009 EAp2:Minimum Energy Performance
posted by  Laura Charlier  on 

As it relates to occupancy sensors being installed in all 'back of house' spaces for this credit, what encompasses back of house spaces? Is there a comprehensive list? i.e.

1
Tue May 27, 2014, 4:16 pm

Electric Resistance Heating

CS-2009 EAp2:Minimum Energy Performance
posted by  Francesco Passerini  on 

What are the mandatory provisions for fan coils whose coils are heated through electrical resistances? I think par. 6.4.3.3.1 for the control. Something else?

1
Tue Dec 9, 2014, 7:46 pm
1
Thu Apr 1, 2010, 12:48 pm

SIMULATION METHOD

CS-2009 EAp2:Minimum Energy Performance
posted by  RICARDO GUEMEZ DIAZ  on 

HI, IM RICARDO GUEMEZ FROM MEXICO CITY, I AM IN THE PROCESS OF SIMULATING A WAREHOUSE FOR TENANT LEASING, THE OWNER IN ALL PROJECTS ONLY INCLUDE NATUARAL VENTILATION WITH IEQ-01 COMPLIANCE.

1
Fri Jul 22, 2011, 8:43 pm

Attached building

CS-2009 EAp2:Minimum Energy Performance
posted by  Therese Malm  on 

There is an attached building to the building we simulate. Should thiis attached building be simulated in the proposed and baseline building or should it be exluded?

1
Thu Aug 8, 2013, 2:01 pm

High Process Load and Equipment Efficiency

CS-2009 EAp2:Minimum Energy Performance
posted by  Shad Traylor  on 

Our project is a manufacturing plant which is seeking certification under NC Core and Shell v2009.

1
Wed Mar 16, 2016, 12:59 am

Mandatory provisions of Closed-circuit cooling towers

CS-2009 EAp2:Minimum Energy Performance
posted by  Florinda Garcia   on 

My project is in the process of the LEED CS 2009 certification.

1
Tue Sep 17, 2013, 5:11 pm

Base Case vs Project Case

CS-2009 EAp2:Minimum Energy Performance
posted by  Dana Guzman  on 

Hi, can you kindly clarify whether the glazing percentage and floor area for the base case needs to match the project case when reviewing compliance for EAp2?

0

System type and OA input

CS-2009 EAp2:Minimum Energy Performance
posted by  Katherine Ann Resurreccion  on 

Hi Everyone! The project that we're working on will be in a country where the local code requires more outdoor air than 62.1 at most of the zone types.

0