Post a question or comment
Credit Filters
Minimum Energy Performance
Filter by location
Forum
Topic
Replies
Recent

Number of simulation models

CS-2009 EAp2:Minimum Energy Performance
posted by  Lucie Cervena  on 

We are working on an eQuest model of an extensive project that is goinig to be certified as „one building“ with the total gross square footage of 1,670,000 sf.

1
Tue Sep 10, 2013, 1:29 pm

Core Shell Version 2.0

CS-2009 EAp2:Minimum Energy Performance
posted by  Carolina Vergnano  on 

Hello, I would like to know if on the old version, using the energy simulation based on Std.90.1-2004 Appendix G, to comply with the prerequiste the proposed needs at minimum to be equal to the Ba

1
Mon May 21, 2012, 4:51 pm

Brazilian Equivalent Standard

CS-2009 EAp2:Minimum Energy Performance
posted by  Pamela Svetllana Santos Souza  on 

Hello, I'm modelling for LEED C&S 2009. The project has 26 floor type of mixed-use offices.

0

Continuous Insulation

CS-2009 EAp2:Minimum Energy Performance
posted by  Tony Schafer  on 

I am trying to use Table A3.3 to determine the overall wall assembly U-factor. My question is, what materials can be included in the continuous insulation rated R-value that I use?

1
Thu Jul 26, 2012, 3:41 pm

Computer load

posted by  Diana Wellenbrink  on 
1
Thu Aug 19, 2010, 12:05 pm

Building Area Method Vs Space by Space Method

CS-2009 EAp2:Minimum Energy Performance
posted by  Ciaran McCabe  on 

In terms of the Energy Model for Core & Shell is the "Building Area Method" more applicable as the final layout has not been decide yet ?

1
Fri Dec 4, 2015, 8:00 pm

AREA CRITERIA

CS-2009 EAp2:Minimum Energy Performance
posted by  RICARDO GUEMEZ DIAZ  on 

HI, I HAVE A PROJECT IN MEXICO CITY, AND THE OWNER DEFINE THE CRITERIA OF DONT USE TREATMENT PLANT AND USE AIR COOLED CHILLERS.

1
Wed Sep 28, 2011, 2:15 am

CS Energy Simulation

CS-2009 EAp2:Minimum Energy Performance
posted by  Marina Andrade  on 

Hi! On a energy simulation, how can I consider the HVAC, lighting and occupancy on spaces that will be used by the tenants in the future? Thanks

1
Sat Aug 17, 2013, 10:48 pm

DCV requirement for high-occupancy areas

CS-2009 EAp2:Minimum Energy Performance
posted by  Shenhao Li  on 

Hello! We have a canteen project in Shanghai. The building has three floors, total GFA is 64,067 square feet. The baseline HVAC system type is system 6.

1
Tue Apr 5, 2016, 2:48 pm

Modeling DCV in open space offices

CS-2009 EAp2:Minimum Energy Performance
posted by  Lucie Cervena  on 

I am in the process of simulating 7 floor office building. Five of these floors are designed as open space offices, the others are designed as small offices.

1
Thu Apr 12, 2012, 1:45 pm