Forum quick links
Baseline Ventilation
CS-2009 EAp2:Minimum Energy Performanceposted by Toni Herena Montull on
Dear all, our previous version of the baseline model in a C&S building had the same ventilation rates than the proposed.
Mandatory provision 6.4.1.1 Equipment efficiency.
CS-2009 EAp2:Minimum Energy Performanceposted by Sandra Holmström on
I have a question about Mandatory provision 6.4.1.1 Equipment efficiency. Our project is a LEED Core and Shell project and a retail centre, 500 000 foot2.
ASHRAE mandatory provisions
CS-2009 EAp2:Minimum Energy Performanceposted by Anna Korinkova on
I guess that it is a repetitive question but I need to be sure.
Building Area Method Vs Space by Space Method
CS-2009 EAp2:Minimum Energy Performanceposted by Ciaran McCabe on
In terms of the Energy Model for Core & Shell is the "Building Area Method" more applicable as the final layout has not been decide yet ?
AREA CRITERIA
CS-2009 EAp2:Minimum Energy Performanceposted by RICARDO GUEMEZ DIAZ on
HI, I HAVE A PROJECT IN MEXICO CITY, AND THE OWNER DEFINE THE CRITERIA OF DONT USE TREATMENT PLANT AND USE AIR COOLED CHILLERS.
CS Energy Simulation
CS-2009 EAp2:Minimum Energy Performanceposted by Marina Andrade on
Hi! On a energy simulation, how can I consider the HVAC, lighting and occupancy on spaces that will be used by the tenants in the future? Thanks
DCV requirement for high-occupancy areas
CS-2009 EAp2:Minimum Energy Performanceposted by Shenhao Li on
Hello! We have a canteen project in Shanghai. The building has three floors, total GFA is 64,067 square feet. The baseline HVAC system type is system 6.
COP - Future tenants - Energy Efficiency Simulation
CS-2009 EAp2:Minimum Energy Performanceposted by Marcio Alberto Casado Pereira on
Hi, It is possible to demand a future COP to comply with for future tenants and consider this value for the simulation (Eap2)? Thanks in advance.
Fan Power Limitation Pressure Drop Adjustment
CS-2009 EAp2:Minimum Energy Performanceposted by Yu Wang on
Hallo everyone, I am modeling a C&S project with 8 floors, and system 7 will be used in the Baseline Case.