Minimum energy performance calculator

CS-2009 EAp2:Minimum Energy Performance
posted by  Giuseppina Amorusi  on 

Hi everybody I'm working on file "Minimum Energy Performance Calculator" for EAp2 (last version available in Resource on leedonline) which is unlocked. I need to fill in a new system or componen

1
Wed Dec 14, 2016, 3:20 pm

great

CS-2009 EAp2:Minimum Energy Performance
posted by  Mary Wilkerson  on 

nice thread. very interesting.

0

outdoor air rate in area where uses demand control strategy

CS-2009 EAp2:Minimum Energy Performance
posted by  tiantian zhou  on 

Dear sir, in our project,the meeting room uses CO2 sensor to control the outdoor rate and the parking garage uses CO sensor to control the outdoor rate.

1
Wed Feb 12, 2014, 2:08 pm

Will "representative modelling" meet prerequisite/ASHRAE reqs?

CS-2009 EAp2:Minimum Energy Performance
posted by  Ward Miller  on 

The project at hand is ~500,000 sf and contains 4 buildings, each with 2 sub-floors, a ground floor, and between 4 and 11 stories and a district heating source.

1
Thu Oct 4, 2012, 4:11 pm

Modeling OA with Demand control ventilation

CS-2009 EAp2:Minimum Energy Performance
posted by  Indochine Engineering VN  on 

Hi, I have demand control ventilation for every AHU.

1
Thu Sep 25, 2014, 1:18 pm

compliance with ASHRAE 90.1 2007

CS-2009 EAp2:Minimum Energy Performance
posted by  shashank jain  on 

In order to fulfil the requirements of EAp2 through building simulation, do we need to meet mandatory requirements of ASHRAE 90.1 2007.

1
Thu Jan 10, 2013, 3:26 pm

VAV boxes

CS-2009 EAp2:Minimum Energy Performance
posted by  Rathnashree Bharadwaj  on 

We request for a clarification regarding mandating the tenant to use the VAV boxes in core and shell projects. In a core and shell project, we will not know what system the tenant will be using.

1
Thu Jan 8, 2015, 2:16 pm

ENERGY MODELING

CS-2009 EAp2:Minimum Energy Performance
posted by  RICARDO GUEMEZ DIAZ  on 

Hello, In Mexico City we have a one project that is integrated in two phases, the phase one start the construction phase in 2011 and the second phase will start the construction phase the next year

0

Lighting control in Tenant space

CS-2009 EAp2:Minimum Energy Performance
posted by  Indochine Engineering VN  on 

Hi, I have an open office, restaurant, apartment for rent in the mixed use building project. Im confused with lighting control mandatory section 9.4 ASHRAE.

1
Tue Jun 16, 2015, 1:45 pm

Energy Recovery (G3.1.2.10)

CS-2009 EAp2:Minimum Energy Performance
posted by  Andy Fouss  on 

The proposed building is a dormitory served using individual fan coils (with no outside air in the fan coils) and the outside air for the building being supplied by a single dedicated outside air u

1
Mon Jan 11, 2016, 9:08 pm