Forum quick links
Mechanical System by Future Tenant
CS-2009 EAp2:Minimum Energy Performanceposted by Andrew Chan on
We have an office core/shell project that we are considering for certification. The Owner may want to just design a small mechanical unit to service the restrooms and not much more.
New Building or Major Renovation of Mixed Projects
CS-2009 EAp2:Minimum Energy Performanceposted by Bernd Schadl on
Hello, where can I find an exact definition of "new buildings" and "major renovations" for CS-projects to choose the right category for the energy performance of renovated existing buildings with n
Minimum energy performance calculator
CS-2009 EAp2:Minimum Energy Performanceposted by Giuseppina Amorusi on
Hi everybody I'm working on file "Minimum Energy Performance Calculator" for EAp2 (last version available in Resource on leedonline) which is unlocked. I need to fill in a new system or componen
great
CS-2009 EAp2:Minimum Energy Performanceposted by Mary Wilkerson on
nice thread. very interesting.
outdoor air rate in area where uses demand control strategy
CS-2009 EAp2:Minimum Energy Performanceposted by tiantian zhou on
Dear sir, in our project,the meeting room uses CO2 sensor to control the outdoor rate and the parking garage uses CO sensor to control the outdoor rate.
Will "representative modelling" meet prerequisite/ASHRAE reqs?
CS-2009 EAp2:Minimum Energy Performanceposted by Ward Miller on
The project at hand is ~500,000 sf and contains 4 buildings, each with 2 sub-floors, a ground floor, and between 4 and 11 stories and a district heating source.
Modeling OA with Demand control ventilation
CS-2009 EAp2:Minimum Energy Performanceposted by Indochine Engineering VN on
Hi, I have demand control ventilation for every AHU.
compliance with ASHRAE 90.1 2007
CS-2009 EAp2:Minimum Energy Performanceposted by shashank jain on
In order to fulfil the requirements of EAp2 through building simulation, do we need to meet mandatory requirements of ASHRAE 90.1 2007.
VAV boxes
CS-2009 EAp2:Minimum Energy Performanceposted by Rathnashree Bharadwaj on
We request for a clarification regarding mandating the tenant to use the VAV boxes in core and shell projects. In a core and shell project, we will not know what system the tenant will be using.
Energy Recovery (G3.1.2.10)
CS-2009 EAp2:Minimum Energy Performanceposted by Andy Fouss on
The proposed building is a dormitory served using individual fan coils (with no outside air in the fan coils) and the outside air for the building being supplied by a single dedicated outside air u