Forum quick links
Water Metering
CS-2009 EAc5.1:Measurement and Verification—Base Buildingposted by Steve Gross on
Hello, My question is in regards to what need to be metered on the water side. Does the utility meter suffice or do I need to provide a meter for hot and cold water independently?
Calibrated vs actual energy use
CS-2009 EAc5.1:Measurement and Verification—Base Buildingposted by Puteri Shireen Jahnkassim on
Dear all, What if the case is that the actual total energy use diverted only around 1 to 3 percent of the predicted energy during design? Is a calibrated energy simulation model still need by LEE
Cold Dark Shell - M&V Question
CS-2009 EAc5.1:Measurement and Verification—Base Buildingposted by Brightworks Sustainability on
I'm working on a cold dark shell project where the tenant will be building out the full HVAC and BMS system.
Exemplary Performance for EAc5.1
CS-2009 EAc5.1:Measurement and Verification—Base Buildingposted by Ron Dean on
Hello, I have seen in the form version 4.0 of leedonline for EAc5.1 that in the ADITIONAL DETAILS, there is an option (check box) that says: 'The Project is pursuing exemplary performance for EA
100% Tenant
CS-2009 EAc5.1:Measurement and Verification—Base Buildingposted by Emmanuel Pauwels on
We are working in a project that will have a single tenant occupying the whole building.
Lighting measurement
CS-2009 EAc5.1:Measurement and Verification—Base Buildingposted by Ron Dean on
good day, I have a project with 14 floors and our project scope is to control the hall and restroom lighting, we can measure and verify their savings. I have a doubt about what I need to measure, m
Deciding to choose Option 1(D) or Option 2(B)
CS-2009 EAc5.1:Measurement and Verification—Base Buildingposted by James Keohane on
I am trying to think thru and identify the first cost difference of Option1(IPMVP Option D) or Option 2 ( IPMVP Option B). For a new office building, 100,000s.f.
Quality Assurance
CS-2009 EAc5.1:Measurement and Verification—Base Buildingposted by Ciaran McCabe on
Can anyone help with the following LEED reviewer comment that we received.
EAc 5.1 for LEED C&S
CS-2009 EAc5.1:Measurement and Verification—Base Buildingposted by S Nagarajan on
Dear Sir I am involved in a 5-storey building. The base building loads are mixed loads, i.e the loads include lighting and small power.