Measurement and Verification—Base Building
Filter by location
Forum
Topic
Replies
Recent

Water Metering

CS-2009 EAc5.1:Measurement and Verification—Base Building
posted by  Steve Gross  on 

Hello, My question is in regards to what need to be metered on the water side. Does the utility meter suffice or do I need to provide a meter for hot and cold water independently?

1
Tue Aug 13, 2013, 12:57 pm

Calibrated vs actual energy use

CS-2009 EAc5.1:Measurement and Verification—Base Building
posted by  Puteri Shireen Jahnkassim  on 

Dear all, What if the case is that the actual total energy use diverted only around 1 to 3 percent of the predicted energy during design? Is a calibrated energy simulation model still need by LEE

1
Wed Mar 16, 2016, 12:20 am

Cold Dark Shell - M&V Question

CS-2009 EAc5.1:Measurement and Verification—Base Building
posted by  Brightworks Sustainability  on 

I'm working on a cold dark shell project where the tenant will be building out the full HVAC and BMS system.

1
Thu May 11, 2017, 12:48 pm

Exemplary Performance for EAc5.1

CS-2009 EAc5.1:Measurement and Verification—Base Building
posted by  Ron Dean  on 

Hello, I have seen in the form version 4.0 of leedonline for EAc5.1 that in the ADITIONAL DETAILS, there is an option (check box) that says: 'The Project is pursuing exemplary performance for EA

1
Fri Mar 8, 2013, 3:48 pm
1
Mon Aug 2, 2010, 8:18 pm

100% Tenant

CS-2009 EAc5.1:Measurement and Verification—Base Building
posted by  Emmanuel Pauwels  on 

We are working in a project that will have a single tenant occupying the whole building.

1
Thu Jan 21, 2016, 3:46 pm

Lighting measurement

CS-2009 EAc5.1:Measurement and Verification—Base Building
posted by  Ron Dean  on 

good day, I have a project with 14 floors and our project scope is to control the hall and restroom lighting, we can measure and verify their savings. I have a doubt about what I need to measure, m

1
Mon Aug 27, 2012, 2:18 pm

Deciding to choose Option 1(D) or Option 2(B)

CS-2009 EAc5.1:Measurement and Verification—Base Building
posted by  James Keohane  on 

I am trying to think thru and identify the first cost difference of Option1(IPMVP Option D) or Option 2 ( IPMVP Option B). For a new office building, 100,000s.f.

1
Wed Nov 13, 2013, 2:31 pm

Quality Assurance

CS-2009 EAc5.1:Measurement and Verification—Base Building
posted by  Ciaran McCabe  on 

Can anyone help with the following LEED reviewer comment that we received.

1
Thu Apr 27, 2017, 1:08 pm

EAc 5.1 for LEED C&S

CS-2009 EAc5.1:Measurement and Verification—Base Building
posted by  S Nagarajan  on 

Dear Sir I am involved in a 5-storey building. The base building loads are mixed loads, i.e the loads include lighting and small power.

1
Thu Nov 6, 2014, 11:04 pm