Forum quick links
Should I include demolition debris?
CS-2009 MRc2:Construction Waste Managementposted by Sandra Holmström on
I wonder if I need to include demolition debris if a former building at the project site was demolished for four years ago?
Bentonite mud/sludge
CS-2009 MRc2:Construction Waste Managementposted by Paola Figueiredo on
Hi, Bentonite mud used for filling in the foundation phase is normally sent to special landfills as hazardous waste, thus being excluded from MR2 calculations. However, there is a special treatme
Rebar - Offsite Scrap Recycling
CS-2009 MRc2:Construction Waste Managementposted by Roberto Meza on
Hello, We have an interesting situation at a large project, Rebar is being bought from a company which at the same time offers to bend it into the various figures needed for columns etc.
Sharing Waste Bins
CS-2009 MRc2:Construction Waste Managementposted by Elizabeth Durney on
Hello We have a project that is attempting LEED-CS certification. A tenant in the same building is simultaneously attempting LEED-IDC certification.
Plastic chute for debris management
CS-2009 MRc2:Construction Waste Managementposted by Antonio Rodriguez on
Our project is a 40-story building, and we are having a hard time managing the debris and garbage produced in superior levels, in order to carry it all the way down to street level, so that it can
Co-processing as an approach to Waste Management
CS-2009 MRc2:Construction Waste Managementposted by Katherine Ann Resurreccion on
Hi All, I would like to hear your opinion about co-processing as an acceptable waste diversion to meet the intent of this credit.
Tracking mixed recyclables off-site
CS-2009 MRc2:Construction Waste Managementposted by Maria Luisa Verticchio on
The job site we are able to begin is inner-city with many restrictions, especially square footage of actual site. There is not enough space to set up multiple bins.
Waste management pro-rate surface logic for two buildings
CS-2009 MRc2:Construction Waste Managementposted by Ian McCall on
Dear LEEDers, Question : We would like to monitor & manage the construction waste for the whole site and then pro-rata by surface area the recycling percentage for each building office &
Construction Waste Diversion vs Material Re-Use
CS-2009 MRc2:Construction Waste Managementposted by Tim Gaidis on
Hi all, I'm working on a LEED-NC v3 major renovation project that has veered just below it's 50% MRc2 CWM target and have 2 questions below: Please note: We are pursuing 3 pts for the MRc1.1 Build
Food and Site Offices Waste
CS-2009 MRc2:Construction Waste Managementposted by Ali Soufan on
Should we include food waste and site offices waste in the calculations?