Should I include demolition debris?

CS-2009 MRc2:Construction Waste Management
posted by  Sandra Holmström  on 

I wonder if I need to include demolition debris if a former building at the project site was demolished for four years ago?

1
Mon Aug 13, 2012, 4:00 pm

Bentonite mud/sludge

CS-2009 MRc2:Construction Waste Management
posted by  Paola Figueiredo  on 

Hi, Bentonite mud used for filling in the foundation phase is normally sent to special landfills as hazardous waste, thus being excluded from MR2 calculations. However, there is a special treatme

1
Tue Nov 8, 2011, 8:37 pm

Rebar - Offsite Scrap Recycling

CS-2009 MRc2:Construction Waste Management
posted by  Roberto Meza  on 

Hello, We have an interesting situation at a large project, Rebar is being bought from a company which at the same time offers to bend it into the various figures needed for columns etc.

1
Mon Feb 17, 2014, 5:26 pm

Sharing Waste Bins

CS-2009 MRc2:Construction Waste Management
posted by  Elizabeth Durney  on 

Hello We have a project that is attempting LEED-CS certification. A tenant in the same building is simultaneously attempting LEED-IDC certification.

1
Tue Nov 8, 2011, 8:55 pm

Plastic chute for debris management

CS-2009 MRc2:Construction Waste Management
posted by  Antonio Rodriguez  on 

Our project is a 40-story building, and we are having a hard time managing the debris and garbage produced in superior levels, in order to carry it all the way down to street level, so that it can

1
Thu May 9, 2013, 11:02 pm

Co-processing as an approach to Waste Management

CS-2009 MRc2:Construction Waste Management
posted by  Katherine Ann Resurreccion  on 

Hi All, I would like to hear your opinion about co-processing as an acceptable waste diversion to meet the intent of this credit.

5
Default Avatar
LEEDuser Expert
472 thumbs up
Tue Jul 25, 2017, 3:56 am

Tracking mixed recyclables off-site

CS-2009 MRc2:Construction Waste Management
posted by  Maria Luisa Verticchio  on 

The job site we are able to begin is inner-city with many restrictions, especially square footage of actual site. There is not enough space to set up multiple bins.

4
Default Avatar
LEEDuser Expert
472 thumbs up
Tue Oct 11, 2016, 2:15 am

Waste management pro-rate surface logic for two buildings

CS-2009 MRc2:Construction Waste Management
posted by  Ian McCall  on 

Dear LEEDers, Question : We would like to monitor & manage the construction waste for the whole site and then pro-rata by surface area the recycling percentage for each building office &

4
Default Avatar
LEEDuser Expert
472 thumbs up
Wed Jun 17, 2015, 4:39 pm

Construction Waste Diversion vs Material Re-Use

CS-2009 MRc2:Construction Waste Management
posted by  Tim Gaidis  on 

Hi all, I'm working on a LEED-NC v3 major renovation project that has veered just below it's 50% MRc2 CWM target and have 2 questions below: Please note: We are pursuing 3 pts for the MRc1.1 Build

4
Default Avatar
LEEDuser Expert
472 thumbs up
Fri Feb 20, 2015, 10:20 pm

Food and Site Offices Waste

CS-2009 MRc2:Construction Waste Management
posted by  Ali Soufan  on 

Should we include food waste and site offices waste in the calculations?

3