Is Water considered a recycled material ?

CS-2009 MRc4:Recycled Content
posted by  Ines Fischer  on 

Hello everyone!

I have some concrete cutsheets where it is specified that 30% of the water used fot it´s mixing was recycled. 

0

Removing "other" costs from total construction cost of project

CS-2009 MRc4:Recycled Content
posted by  Edgar Arevalo  on 

I am looking at a spreadsheet with the total construction cost for the project.  I already shaved off HVAC, Electrical, Plumbing, and other equipment costs from the total (including audiovisua

0

Percentage Range

CS-2009 MRc4:Recycled Content
posted by  Edgar Arevalo  on 

This is a bit bothersome.  I received 2 submittals where the postconsumer and/or preconsumer range where added as percentage range like "11% to 18%" rather than a fixed percentage value.&

6
Default Avatar
Principal
LSDesignworks @ Vancouver, BC Canada
LEEDuser Basic Member
9 thumbs up
Wed Dec 12, 2018, 5:08 pm

Default materials cost

CS-2009 MRc4:Recycled Content
posted by  Agnieszka Rylska  on 

LEED default materials cost is 45% of total construction costs (based on specific Master Format divisions).

3
Tue Aug 28, 2018, 8:40 am

Paints and Coating

CS-2009 MRc4:Recycled Content
posted by  Edgar Arevalo  on 

I've been searching through the reference guide but I cannot find a direct answer.  My question is, can we also catalog paints and coatings into the Materials and Resources Calculator?&nb

3
Energy Engineer
ads ENGINEERS, DPC
LEEDuser Basic Member
21 thumbs up
Thu Jan 4, 2018, 10:09 pm

Paint and coating

CS-2009 MRc4:Recycled Content
posted by  Edgar Arevalo  on 

I've been searching through the reference guide but I cannot find a direct answer.  My question is, can we also catalog paints and coatings into the Materials and Resources Calculator?&nb

1
Fri Jan 12, 2018, 12:55 am

Total construction cost

CS-2009 MRc4:Recycled Content
posted by  Agnieszka Rylska  on 

Should the excavation work cost be included in the total contruction cost (while using the default cost of materials equal to 45% of total construction costs)?

3
Wed Sep 13, 2017, 3:01 pm

Aggregating data

CS-2009 MRc4:Recycled Content
posted by  Eeshoo Rehani  on 

One LEED site boundary has two individual LEED projects that are under construction under one contract by the same GC.

1
Wed Feb 22, 2012, 3:26 am

Recycled Water in Concrete and SCMs

CS-2009 MRc4:Recycled Content
posted by  Ward Miller  on 

The Reference Guide language related to SCMs in concrete gives project teams the choice whether to include SCMs as a percentage of the entire concrete or separate them out (pg.

1
Sat Aug 26, 2017, 11:03 pm

MR Calcuation Cost

CS-2009 MRc4:Recycled Content
posted by  Lilian Seow  on 

Re: 2009 CS For both options - Total Construction Cost and Default 45% - are taxes included?

1
Mon Apr 28, 2014, 8:12 pm