New LEED project inside an already certified LEED Project

Healthcare-v2009 MPR3:Must use a reasonable site boundary
posted by  Husam Haron  on 

An office building was constructed and awarded LEED Silver. Now, a new building is being planned to be constructed inside the LEED project boundary of the the already certified LEED project.

3
Default Avatar
LEED AP
ABUD Engineering Ltd.
LEEDuser Basic Member
34 thumbs up
Tue Sep 15, 2020, 2:45 pm

LEED Basement Boundary

Healthcare-v2009 MPR3:Must use a reasonable site boundary
posted by  Patrice McVeigh  on 

Hi, I am working on a project with 3 towers over a shared 2-storey basement. Each tower is being certified separately.

2
Representative
Vermont House of Representatives
LEEDuser Expert
7780 thumbs up
Wed Mar 4, 2020, 10:47 am

Reasonable Boundary - other support builidngs beyond project

Healthcare-v2009 MPR3:Must use a reasonable site boundary
posted by  Nicole Kimoto  on 

We have a hangar project with an admin building attached all new construction. Does the boundary only need to include the construction that will do with the hangar/admin only?

2
Representative
Vermont House of Representatives
LEEDuser Expert
7780 thumbs up
Wed Feb 14, 2018, 10:18 am

Identifying LEED boundary to exclude portion of project

Healthcare-v2009 MPR3:Must use a reasonable site boundary
posted by  Kristen Dotson  on 

The registered project includes commercial core and shell space with an adjoining housing tower which will be scored under the Evergreen Sustainable Development Standard.

1
Sat Mar 8, 2014, 3:37 am

LEED Project Boundary - Football Stadium

Healthcare-v2009 MPR3:Must use a reasonable site boundary
posted by  Lisa VandeVoort  on 

Our project is a new football stadium on a college campus. Is it acceptable to limit our project boundary to include just the pressbox / suite tower?

0

LEED Boundary and Non-contiguous reconfigured areas

Healthcare-v2009 MPR3:Must use a reasonable site boundary
posted by  Aaron Ketner  on 

Our project is currently registered under NC 2009. This 66,500sf project consists of a new classroom addition to an existing 53,000sf building, which achieved LEED silver under NC 2.2.

0

Reasonable Site Boundary for Lighting

Healthcare-v2009 MPR3:Must use a reasonable site boundary
posted by  Carol Liebst  on 

I am working on a school on an army base - to be LEED Silver (2009). I want to be I am correctly establishing the lighting boundary.

1
Thu Mar 21, 2013, 2:43 pm

non certifiable building

Healthcare-v2009 MPR3:Must use a reasonable site boundary
posted by  renee jimenez  on 

what is the definition of a non-LEED-certifiable building? does it mean your not going to attempt to certify them or that they dont qualify/meet minimum requirements?

1
Mon Jan 21, 2013, 3:25 pm

Project of 2 buildings in one territory

Healthcare-v2009 MPR3:Must use a reasonable site boundary
posted by  Laurence Theriault  on 

I am working on a project who has two buildings in his land, but only one of them (an office building) will be in the process of becoming LEED NC.

1
Tue Apr 30, 2013, 11:05 pm

Redrawing Project Boundary AFTER Initial Review

Healthcare-v2009 MPR3:Must use a reasonable site boundary
posted by  C.M. G.  on 

Hello, We are currently preparing our project for final review, and realized that that we drew our project boundary in such a way that disqualifies us from SSc8.

1
Mon Dec 23, 2013, 7:31 pm