New LEED project inside an already certified LEED Project
Healthcare-v2009 MPR3:Must use a reasonable site boundaryposted by Husam Haron on
An office building was constructed and awarded LEED Silver. Now, a new building is being planned to be constructed inside the LEED project boundary of the the already certified LEED project.
LEED Basement Boundary
Healthcare-v2009 MPR3:Must use a reasonable site boundaryposted by Patrice McVeigh on
Hi, I am working on a project with 3 towers over a shared 2-storey basement. Each tower is being certified separately.
Reasonable Boundary - other support builidngs beyond project
Healthcare-v2009 MPR3:Must use a reasonable site boundaryposted by Nicole Kimoto on
We have a hangar project with an admin building attached all new construction. Does the boundary only need to include the construction that will do with the hangar/admin only?
Identifying LEED boundary to exclude portion of project
Healthcare-v2009 MPR3:Must use a reasonable site boundaryposted by Kristen Dotson on
The registered project includes commercial core and shell space with an adjoining housing tower which will be scored under the Evergreen Sustainable Development Standard.
LEED Project Boundary - Football Stadium
Healthcare-v2009 MPR3:Must use a reasonable site boundaryposted by Lisa VandeVoort on
Our project is a new football stadium on a college campus. Is it acceptable to limit our project boundary to include just the pressbox / suite tower?
LEED Boundary and Non-contiguous reconfigured areas
Healthcare-v2009 MPR3:Must use a reasonable site boundaryposted by Aaron Ketner on
Our project is currently registered under NC 2009. This 66,500sf project consists of a new classroom addition to an existing 53,000sf building, which achieved LEED silver under NC 2.2.
Reasonable Site Boundary for Lighting
Healthcare-v2009 MPR3:Must use a reasonable site boundaryposted by Carol Liebst on
I am working on a school on an army base - to be LEED Silver (2009). I want to be I am correctly establishing the lighting boundary.
non certifiable building
Healthcare-v2009 MPR3:Must use a reasonable site boundaryposted by renee jimenez on
what is the definition of a non-LEED-certifiable building? does it mean your not going to attempt to certify them or that they dont qualify/meet minimum requirements?
Project of 2 buildings in one territory
Healthcare-v2009 MPR3:Must use a reasonable site boundaryposted by Laurence Theriault on
I am working on a project who has two buildings in his land, but only one of them (an office building) will be in the process of becoming LEED NC.
Redrawing Project Boundary AFTER Initial Review
Healthcare-v2009 MPR3:Must use a reasonable site boundaryposted by C.M. G. on
Hello, We are currently preparing our project for final review, and realized that that we drew our project boundary in such a way that disqualifies us from SSc8.