Forum quick links
Exempting Space for LEED EBOM
Healthcare-v2009 MPR3:Must use a reasonable site boundaryposted by Michael McPheron on
Our building includes offices attached to a manufacturing facility by a hallway and kitchen area. The initial goal was to just get the offices and kitchen area LEED certified for EBOM.
Campus road
Healthcare-v2009 MPR3:Must use a reasonable site boundaryposted by Susan Di Giulio on
We have a project on a university campus. The university maintains the roads on the campus, although there is public access 24/7.
Determining Site Boundary on Renovations/Additions
Healthcare-v2009 MPR3:Must use a reasonable site boundaryposted by Andrew Buck on
We are working on a Hotel that is both a renovation and major new construction.
Reasonable Site Boundary for Lighting
Healthcare-v2009 MPR3:Must use a reasonable site boundaryposted by Carol Liebst on
I am working on a school on an army base - to be LEED Silver (2009). I want to be I am correctly establishing the lighting boundary.
Identifying LEED boundary to exclude portion of project
Healthcare-v2009 MPR3:Must use a reasonable site boundaryposted by Kristen Dotson on
The registered project includes commercial core and shell space with an adjoining housing tower which will be scored under the Evergreen Sustainable Development Standard.
LEED Project Boundary - Football Stadium
Healthcare-v2009 MPR3:Must use a reasonable site boundaryposted by Lisa VandeVoort on
Our project is a new football stadium on a college campus. Is it acceptable to limit our project boundary to include just the pressbox / suite tower?
LEED Boundary and Non-contiguous reconfigured areas
Healthcare-v2009 MPR3:Must use a reasonable site boundaryposted by Aaron Ketner on
Our project is currently registered under NC 2009. This 66,500sf project consists of a new classroom addition to an existing 53,000sf building, which achieved LEED silver under NC 2.2.
Airport Terminal LEED certification
Healthcare-v2009 MPR3:Must use a reasonable site boundaryposted by KONSTANTINOS VAVALETSKOS on
In an airport LEED project, only the terminal building is going to be certified. In this case how the LEED Boundary should be defined?
non certifiable building
Healthcare-v2009 MPR3:Must use a reasonable site boundaryposted by renee jimenez on
what is the definition of a non-LEED-certifiable building? does it mean your not going to attempt to certify them or that they dont qualify/meet minimum requirements?
Project of 2 buildings in one territory
Healthcare-v2009 MPR3:Must use a reasonable site boundaryposted by Laurence Theriault on
I am working on a project who has two buildings in his land, but only one of them (an office building) will be in the process of becoming LEED NC.