Forum quick links
LEED Project Boundary for a Train Station
Healthcare-v2009 MPR3:Must use a reasonable site boundaryposted by Michael G on
Hi all, I have an issue properly defining the project boundary for a Train Station on a large overall site which includes the station, outdoor plaza, train platforms, large parking lots, a substati
Exempting Space for LEED EBOM
Healthcare-v2009 MPR3:Must use a reasonable site boundaryposted by Michael McPheron on
Our building includes offices attached to a manufacturing facility by a hallway and kitchen area. The initial goal was to just get the offices and kitchen area LEED certified for EBOM.
Campus road
Healthcare-v2009 MPR3:Must use a reasonable site boundaryposted by Susan Di Giulio on
We have a project on a university campus. The university maintains the roads on the campus, although there is public access 24/7.
LEED Boundary and Non-contiguous reconfigured areas
Healthcare-v2009 MPR3:Must use a reasonable site boundaryposted by Aaron Ketner on
Our project is currently registered under NC 2009. This 66,500sf project consists of a new classroom addition to an existing 53,000sf building, which achieved LEED silver under NC 2.2.
Reasonable Site Boundary for Lighting
Healthcare-v2009 MPR3:Must use a reasonable site boundaryposted by Carol Liebst on
I am working on a school on an army base - to be LEED Silver (2009). I want to be I am correctly establishing the lighting boundary.
Identifying LEED boundary to exclude portion of project
Healthcare-v2009 MPR3:Must use a reasonable site boundaryposted by Kristen Dotson on
The registered project includes commercial core and shell space with an adjoining housing tower which will be scored under the Evergreen Sustainable Development Standard.
LEED Project Boundary - Football Stadium
Healthcare-v2009 MPR3:Must use a reasonable site boundaryposted by Lisa VandeVoort on
Our project is a new football stadium on a college campus. Is it acceptable to limit our project boundary to include just the pressbox / suite tower?
LEED Boundary on large site multiple buildings - 1 certifiable
Healthcare-v2009 MPR3:Must use a reasonable site boundaryposted by Alexander Clark on
I have a project that is on a 50 acre site that will be all developed. The project will have (7) structures on the site.
Airport Terminal LEED certification
Healthcare-v2009 MPR3:Must use a reasonable site boundaryposted by KONSTANTINOS VAVALETSKOS on
In an airport LEED project, only the terminal building is going to be certified. In this case how the LEED Boundary should be defined?
non certifiable building
Healthcare-v2009 MPR3:Must use a reasonable site boundaryposted by renee jimenez on
what is the definition of a non-LEED-certifiable building? does it mean your not going to attempt to certify them or that they dont qualify/meet minimum requirements?