"Project boundaries that include other buildings"
Healthcare-v2009 MPR3:Must use a reasonable site boundaryposted by Renaud Gay on
Hello, MPR3 describe situation for "Project boundaries that include other buildings".
Phasing Multiple LEED Projects
Healthcare-v2009 MPR3:Must use a reasonable site boundaryposted by Sara Zoumbaris on
We are working on a development where the project site is composed of two adjacent parcels of land.
site boundary questions
Healthcare-v2009 MPR3:Must use a reasonable site boundaryposted by Carrie Laurendine on
we set our site boundary per USGBC rules on this (building, portion of site regularly used by and relating to function of the building, etc).
Project Site Boundary Includes Existing Building
Healthcare-v2009 MPR3:Must use a reasonable site boundaryposted by Andrew Oxley on
Our project site includes the LEED project (new building) and a separate (not connected) existing building that will remain.
Existing LEED project boundary and new site work
Healthcare-v2009 MPR3:Must use a reasonable site boundaryposted by Susan Robertson on
I need some input. I have a project with an existing LEED boundary. The client did some site work - hardscaping and landscaping within the boundary after our project was occupied.
LPB for underground parking area shared between several projects
Healthcare-v2009 MPR3:Must use a reasonable site boundaryposted by Kent Liu on
I am currently defining LPB for 3 different LEED projects under the same developer.
A tower, podium and shared parking on the same site, LEED NC2009
Healthcare-v2009 MPR3:Must use a reasonable site boundaryposted by Mais B on
We have an administration complex consisting of two basement levels having parking and utility rooms, and above ground a 4-storey podium and a tower both serving as office spaces.
Shared underground parking with non LEED certified buildings
Healthcare-v2009 MPR3:Must use a reasonable site boundaryposted by Jorge Lopez de Obeso on
Our project, a 200,000 sqft CS office tower (much more to the 20% of the total area) shares 3 levels of underground parking lot with two other buildings (Movie theater, shops, restaurants).
Shower in the adjoining building
Healthcare-v2009 MPR3:Must use a reasonable site boundaryposted by Karl Heitman on
The project is a stand-alone office building but it's connected to the existing building to the south by a 70' covered link.
LPB of Subway Station
Healthcare-v2009 MPR3:Must use a reasonable site boundaryposted by Marcio Alberto Casado Pereira on
Dear all, This building has a roof structure that goes beyond the property line in order to shade the sidewalk next to it. It's a public building, that's why.