Forum quick links
Managing rainwater in clay soil with low permeability
CS-v4 SSc4:Rainwater managementposted by Maria Glädt on
Hi, Our project site is a landfill area which was used as a parking during the construction of a tunnel located nearby. The site consists on very low permeable soil (mainly clay).
using Rainwater Storage Tank as LID measure
CS-v4 SSc4:Rainwater managementposted by Hanh Truong on
Dear all,
underground infiltration structure LID?
CS-v4 SSc4:Rainwater managementposted by Jens Apel on
I am not quite sure if the approach discussed in my project team is a viable way to achieve this credit and would like to check back with you.
Discharging Storm water at a later stage
CS-v4 SSc4:Rainwater managementposted by Patrice McVeigh on
Under Version 3 is was acceptable to retain storm water run-off in tanks to discharge in to storm water sewers at a later date, is this still acceptable under V4?
Providing water quality treatment to meet credit requirements
CS-v4 SSc4:Rainwater managementposted by Martin Stowell on
Our project provides water quality treatment of a majority of the stormwater prior to discharging from the stormwater best management practices at the site.
Site-wide measures
CS-v4 SSc4:Rainwater managementposted by Mike D on
If there are rainwater management measures taking place as part of the masterplan surrounding and including the project building but these are not within the LEED project boundary, can those measur