Drawing Review

NC-v4 EAp1:Fundamental commissioning and verification
posted by  Steve Connelly  on 

Is a drawing review of the building envelope required by EAp1 Fundamental Cx if Enhanced Option 2 is not being pursued?

16
Senior Sustainability Manager
JLL
LEEDuser Basic Member
10 thumbs up
Sat May 25, 2019, 4:12 am

Envelope Design Review for LEED V4 Commissioning under Fundamental Cx

NC-v4 EAp1:Fundamental commissioning and verification
posted by  Rohit Upadhyay  on 

Hi Everyone,

Can someone clarify what is the extent of envelope design review by a Commissioning Authority (CxA)

1) Fundamental Commissioning

2) Enhanced Commissioning

1
Sun Aug 11, 2019, 10:06 pm

Phased Cx for a phased project

NC-v4 EAp1:Fundamental commissioning and verification
posted by  Peter Doo  on 

We are working on a comprehensive renovation and addition of an Art Center at an independent high school.

1
Sun Aug 11, 2019, 10:13 pm

Current Facilities Requirements and O&M Plan

NC-v4 EAp1:Fundamental commissioning and verification
posted by  Chris Bennett  on 

I am trying to determine if there a specific requirements regarding how the Current Facilities Requirements and O&M Plan is provided.

2
Practice Leader - Sustainability
EUA
LEEDuser Expert
510 thumbs up
Thu Mar 28, 2019, 3:02 pm

Daylight Sensor and/or Occupancy Sensor

NC-v4 EAp1:Fundamental commissioning and verification
posted by  Purva Saxena  on 

Are primary side-lighted areas to be provided with Daylight Sensor, even though these spaces (conference room, meeting rooms, private cabins with area less than 250 sq.

0

Additions to Existing Cold Storage Facility

NC-v4 EAp1:Fundamental commissioning and verification
posted by  Dustin Norton  on 

I am working on a project that includes a large existing cold storage facility that will essentially double in size after renovations.

2
Sustainability Program Manager
Primus Design Services, LLC
LEEDuser Premium Member
40 thumbs up
Wed Jan 23, 2019, 7:49 pm

Core & Shell with HVAC as future / CI scope

NC-v4 EAp1:Fundamental commissioning and verification
posted by  Stacey Olson  on 

If a project is a cold, dark shell without hot water, can commissioning be deferred as n/a or does a cxa still need to be engaged to preform OPR and BOD review?

0

Future spaces for expansion vs date of certification

NC-v4 EAp1:Fundamental commissioning and verification
posted by  Víctor Ramírez Orozco  on 

we are designing a school project with 14 classrooms and 5 more classrooms planned for future expansión of the school. Those 5 classrooms will not have anything but the walls, windows, and doors.

0

Retro-commission an existing PV array?

NC-v4 EAp1:Fundamental commissioning and verification
posted by  Deborah Lucking  on 

Our project is a county-owned building which will utilize renewable energy from an existing, adjacent, county-owned PV farm.

1