Forum quick links
Data Center CxA
NC-v4 EAp1:Fundamental commissioning and verificationposted by Peter Dishno on
The LEED V4 book has the comment: "DATA CENTERS ONLY For small projects with computer room peak cooling loads less than 2,000,000 Btu/h (600 kW) or a total computer room peak cooling load less tha
Plumbing Commissioning Scope Of Work
NC-v4 EAp1:Fundamental commissioning and verificationposted by Dan Forino on
In LEED 4.0 it states that for plumbing all Domestic Hot Water Systems, pumps and controls.
Authority having Jurisdiction
NC-v4 EAp1:Fundamental commissioning and verificationposted by Pam Lynch on
I just took a LEED GA pratice exam and do not understand the answer to this question: The ‘Authority having Jurisdiction’ is responsible for which of the following? a) Completing the commissioning
M&V credit energy model calibration
NC-v4 EAp1:Fundamental commissioning and verificationposted by MKK LEED on
With the removal of the M&V credit under LEED V4.0, is a calibrated energy model still required under Fundamental Commissioning and Verification credit or some other LEED credit?