Forum quick links
Option 3 without tenant meters
NC-v4 EAp2:Minimum energy performanceposted by Omar Elrawy on
Hi All,
We are conducting feasibility study on an existing building in which we are changing chillers. And we are planning to comply under Option 3: Historical Data
Off Site Renewable Energy Purchase
NC-v4 EAp2:Minimum energy performanceposted by SAMY Chamy on
Dear Concern:-
Baseline Design Supply Airflow Rate Temperature Difference 90.1-10 para. G3.1.2.9.1
NC-v4 EAp2:Minimum energy performanceposted by Michael Callan on
Hello,
ASHRAE Standard 90.1 - 2016 in LEED v4
NC-v4 EAp2:Minimum energy performanceposted by Greenlab on
Dear all,
Baseline Case Outdoor Air Modeling
NC-v4 EAp2:Minimum energy performanceposted by Mankisha Veng Veng on
Dear Concern:-
eQuest can't define steam Loop
NC-v4 EAp2:Minimum energy performanceposted by Kathy Collins, LEED AP , WELL AP, CxA BE Cx on
We have a project that there are two steam plants, one for dehumidifier and processed steam. We have rack washers that use Steam and electricity to do the job.
District heating and Cooling
NC-v4 EAp2:Minimum energy performanceposted by Greenlab on
Hello Everyone,
Autopsy Spaces
NC-v4 EAp2:Minimum energy performanceposted by Cory Duggin on
Would autopsy and associated support spaces be considered a lab space to be included on systems under G3.1.1 exception c requiring turn down at night? I ask because these same spaces in a hos
Automatic Receptacle Controls - IECC 2018 v ASHRAE 90.1-2010
NC-v4 EAp2:Minimum energy performanceposted by Cindy Quinn on
We are working on a project that has to comply with IECC 2018 in order to meet the city’s energy code requirements.