Forum quick links
How to Model Units that are sized for Dehumidification in Labs
NC-v4 EAp2:Minimum energy performanceposted by Rajat Wadhwa on
Hi,
ASHRAE 62.1 & ASHRAE 170
NC-v4 EAp2:Minimum energy performanceposted by Dave Hubka on
Hello,
My project is pursing v4 Healthcare certification, but posting to the NC forum.
Clarification on Baseline Equipment Efficiency Tables for Systems 2, 4, and 6 (ASHRAE 90.1-2010)
NC-v4 EAp2:Minimum energy performanceposted by Anurag Ghosh on
Hello everyone,
Calculating Baseline Fan Power and CFM?
NC-v4 EAp2:Minimum energy performanceposted by Rajat Wadhwa on
How should I calculate the Fan CFm and power for Baseline LEED Model, Autosize the baseline system , then use Q=mCpDeltaT to calculate fan CFM and then find out the HP and use pressur adjustment fo
Option 1, Path 3. Streamlined DES Modeling
NC-v4 EAp2:Minimum energy performanceposted by Nasim Mirian on
Hi,
I am trying to submit for LEED v4 for a campus building which is served by the campus central plant.we are taking Option 1, Path 3. Streamlined DES Modeling.
Swimming Pools Baseline Definition
NC-v4 EAp2:Minimum energy performanceposted by Ricardo Sá on
Dear All,
Process Chiller in a Lab Building: 90.1-2019 Baseline vs. Proposed
NC-v4 EAp2:Minimum energy performanceposted by Kristy M. Walson on
We're working on a 35,000 SF lab building on a campus district cooling loop. The baseline system type is #5, so there's no chilled water in the baseline.
Cooling Efficiency of packaged units larger than 60 tons
NC-v4 EAp2:Minimum energy performanceposted by Dave Hubka on
This week I learned that 60-ton packaged units are not provided with an EER.
Regd. pressure drop adjustments in baseline fan power calculator
NC-v4 EAp2:Minimum energy performanceposted by Anurag Ghosh on
Hello All,